San Diego Skyline Image

San DiegoModular homes for the developers building it.

Send a site plan. Get back only the standard homes that fit, priced through delivery and set.

Send your site plan

Photo: Eric youtse, CC0

The downtown San Diego skyline on a cloudy day, seen across the bay from Coronado
Downtown San Diego from Coronado. Photo: Erin Asadourian, CC BY 4.0

The city

A city that builds, and still falls behind.

San Diego permits more homes per resident than California's other big cities and is still short. The city permitted 8,782 new homes1 in 2024, its second most productive year in a decade, and more than 2,285 of those were accessory dwelling units1.

The target it is measured against over the eight-year state cycle is about 108,000 homes2. Four years in, the running total stood at 31,458 homes1.

“San Diego is making real progress in tackling our housing crisis.”

In their words

The cost of building moved faster than the city could.

Only about one in ten2 county residents can afford a median-priced home, and nearly two thirds2 say they have considered leaving the region because of cost.

  1. “Through updated community plans and innovative programs, we're laying the foundation to increase housing supply and affordability across all neighborhoods and for people of all incomes.”

    Heidi Vonblum, City Planning Director, City of San Diego · City of San Diego, September 2025

  2. “Finding ways to improve and streamline our processes is something our department takes pride in, and that we'll continue to do.”

    Elyse Lowe, Director, Development Services Department, City of San Diego · City of San Diego, September 2025

  3. “For more than a decade, the pace of homebuilding in the San Diego region has not kept pace with demand.”

    County of San Diego Planning and Development Services, on a decade of homebuilding · Comprehensive New Construction Cost Study, January 2026

The gap

San Diego's eight-year target is about 108,000 homes2.

The County commissioned a study of why building here got so expensive. Over the decade to 2023, hard costs rose 62 percent6 and soft costs 68 percent6, while home prices climbed 122 percent6.

Labor is part of it. San Diego construction labor ran 8 percent above the national level6 in 2013 and 23 percent above it6 by 2023. Small parcels went from $630,000 per acre6 in fiscal 2012-13 to $1.9 million per acre6 in fiscal 2021-22.

A standard home built offsite does not fix land. It does take the labor line and the weather out of your schedule, and it prices before you break ground.

San Diego housing figures with sources
State cycle target, 2021 to 2029about 108,000 homes
New homes permitted in 20248,782
Hard cost inflation, 2013 to 202362 percent
Residents who can afford a median-priced homeabout one in ten

What changed

The home is approved by the state. The lot is yours.

Factory-built housing carries a state insignia

California requires an insignia of approval from the Department of Housing and Community Development on factory-built housing components offered for sale to first users, placed on the unit or component before it ships.4

The city reviews the site, not the box

San Diego's own bulletin puts the state in charge of the factory-built housing and the City in charge of the site-built portions for both review and inspection, and it treats the connections between units or panels as site-built.5

The code moved again this year

The City adopted a Land Development Code update carrying 134 amendments3 to citywide and downtown regulations, including a floor area ratio bonus for mixed-use projects in certain mobility zones that provide all required affordable homes onsite, and the removal of a geographic restriction on off-site affordable homes.3

Qualifying projects can clear review quickly

One in six homes permitted over the past two years was approved in eight business days or less1, under the Mayor's executive order to expedite affordable housing projects.1

How it works here

How you build here.

You send a site plan. We come back with the homes that fit, priced through delivery and set.

  1. Send the site plan

    A survey, a plat or a sketch with dimensions. Whatever you have, for one lot or forty.

  2. We fit and price

    Code decides what fits each lot, not a salesperson. You get only the homes that do, back within 3 business days.

  3. Hold the slot

    The capacity fee holds factory time and locks the home price while you finish entitlement.

  4. Delivered and set

    Your own local site contractor pours the foundation and brings utilities, and their bid is the price. We deliver and set the home.

PERCH is never your general contractor and never estimates site work. The pad, the utilities and the connections stay with your local team and the City's inspectors.

Questions

Before you send a plan.

Is modular treated differently from site-built in San Diego?

The state approves the home. California's Department of Housing and Community Development has jurisdiction over factory-built housing and issues the insignia the unit ships with, and San Diego's own bulletin leaves the site-built portions, including the connections between units, with the City for review and inspection.

How many homes does the city actually need?

The eight-year state cycle target is about 108,000 homes2. The city permitted 8,7821 in 2024 and 31,4581 across 2021 to 2024.

Does the 2026 code update change what fits my lots?

It can. The 134 amendments3 adopted in June 2026 include a floor area ratio bonus for mixed-use projects in certain mobility zones and remove a geographic restriction on off-site affordable homes. Send the plan and we fit it against the rules actually in force.

Who does the site work?

Your local site contractor. PERCH builds the home in the factory, then delivers and sets it. We do not bid site work and we do not estimate it.

Why would a standard home help on cost here?

Because the part that inflated fastest is the part that happens on your lot. Hard costs rose 62 percent6 over the decade to 2023 and local construction labor ran 23 percent above the national level6 by 2023. A standard home is drawn once and built repeatedly, and it is priced before you break ground.

Sources (6)
  1. City of San Diego, “City of San Diego Permits Nearly 8,800 New Homes in 2024, Marking Two-Year Surge in Housing Production, summarizing the 2025 Annual Report on Homes”, 2025-09-29. sandiego.gov Back to text
  2. Times of San Diego, “San Diego permits more homes, but housing supply still falls short of demand”, 2025-09-29. timesofsandiego.com Back to text
  3. City of San Diego Development Services Department, “Regulatory Updates: 2026 Land Development Code Update”, 2026. sandiego.gov Back to text
  4. California Department of Housing and Community Development, “Factory-Built Housing Insignia, citing Health and Safety Code Section 19980”, 2026. hcd.ca.gov Back to text
  5. City of San Diego Development Services Department, “Information Bulletin 241: Factory-Built Housing”, 2022-12. sandiego.gov Back to text
  6. County of San Diego Planning and Development Services, “Comprehensive New Construction Cost Study, prepared by the Blue Sky Consulting Group, sections 2.1.1 to 2.1.3”, 2026-01. sandiegocounty.gov Back to text
The San Diego skyline along the waterfront, high-rise towers stepping down toward the bay

Build here.

Send your San Diego site plan and get back only the homes that fit, priced through delivery and set.

Site plan

Your plan stays private. We reply by email.

Photo: Boatguy619, CC BY-SA 4.0