The downtown Los Angeles skyline seen from the Harbor Freeway on a clear day

Los AngelesModular homes for the developers building it.

Send a site plan. Get back only the standard homes that fit, priced through delivery and set.

Send your site plan

Photo: Dreamyshade, CC BY-SA 4.0

A single-family house behind hedges at Sixth Street and Hudson Avenue in the Hancock Park neighborhood of Los Angeles
Sixth Street and Hudson Avenue, Hancock Park. Photo: Downtowngal, CC BY-SA 4.0

The city

Thousands of households are rebuilding at the same time.

In January 2025 the Eaton Fire took 19 lives1 and destroyed 9,419 homes and other structures1 in Altadena and the foothills. The Palisades Fire took 12 lives2 and destroyed 6,8452. Those are the figures CAL FIRE carries on its incident records today, revised upward from the counts published in the first weeks.

Nearly two years on, the work in front of Los Angeles is residential rebuilding at a scale the region has not had to run before: close to 13,000 homes4 lost, on lots that already have streets, sewers and power, and thousands of households waiting on each one.

“Pre-approved standard plans and streamlined permitting processes can help homeowners rebuild more efficiently, safely, and affordably.”

Los Angeles County Department of Regional Planning, on pre-approved standard plans for fire rebuilds, 2026

In their words

The people doing the rebuilding on what it takes.

Across the Palisades and Altadena, more than 2,6004 residential permits had been issued a year after the fires, roughly one for every five homes lost, with 3,3404 more in review.

  1. “We've got planning approvals in three days that would have normally taken three months.”

    Tim Vordtriede, architect and co-founder, Altadena Collective · CalMatters, republished by LAist, January 2026

  2. “Ultimately, we're providing a system for more efficient, affordable housing development.”

    Alex Athenson, architect, co-founder of a pre-approved plan set for the Altadena rebuild · CalMatters, republished by LAist, January 2026

  3. “It's impossible to say, 'they were here by this date so we should also be there.' The data set is just too variable.”

    Colette Curtis, Recovery and Economic Development Director, Town of Paradise · CalMatters, republished by LAist, January 2026

The towers of downtown Los Angeles grouped together under a pale summer sky
The downtown Los Angeles skyline. Photo: ItzAPotato2009, CC0

The gap

The same home, many times over, on lots that already exist.

Repetition is the part of this that offsite construction is actually built for. The lots are platted, the utilities are in the ground, and a large share of what has to be replaced is a single-family home of broadly similar size. Los Angeles County says so itself: the benefits it lists for a pre-approved standard plan are a shortened review timeframe, a predictable review process and a reduced design cost.

The design saving is measurable. Architects behind one of the pre-approved plan sets put it at at least 10 percent4 of the total development cost of a custom single-family home.

What a standard home does not do is clear a lot or pour a foundation. Debris removal alone ran to 2.6 million tons3 hauled out by the Army Corps of Engineers, and all of that work is local, bid locally.

Los Angeles housing figures with sources
Homes and other structures destroyed, Eaton FireCAL FIRE incident record, figures updated August 20269,419
Homes and other structures destroyed, Palisades FireCAL FIRE incident record, figures updated April 20266,845
Homes lost across the Palisades and AltadenaCalMatters, January 2026close to 13,000
Residential rebuild permits issued, one year onAbout one for every five homes lostmore than 2,600
Rebuild permits still in review at that pointSame analysis3,340
Design cost a pre-approved plan can take outArchitects behind one Altadena pre-approved plan set, on a custom single-family homeat least 10 percent

What changed

The state approves the home. The county and the city approve the lot.

Factory work is state jurisdiction here, in writing

Los Angeles County Public Works publishes the split plainly: design, construction and factory work sit with the California Department of Housing and Community Development, while onsite alterations, installation and site work sit with city or county planning and building. The standards are Health and Safety Code 19960 and following, Title 25 of the California Code of Regulations section 3070, and the applicable parts of Title 24.6

The county reviews the site, not the box

In the same guide, the home's factory-built portions are reviewed and approved by the Design Approval Agency, and the site-built portions are reviewed by the local enforcing agency. What the county wants from you is a permit application, a site plan drawn to an engineer's scale and a drainage plan.6

Pre-approved standard plans exist for fire rebuilds

County Planning takes designs for single-family homes and accessory dwelling units into a pre-approved set for the Foothills communities affected by the Eaton Fire and the Coastal communities affected by the Palisades Fire. Planning charges no fee for the initial zoning review. Site-specific review still happens, and still carries fees.5

Rebuilds can be designed to the 2022 code

Executive Order N-29-25 suspends the 2025 California Building Standards for rebuild projects designed to the 2022 California Building Code. Plans in the pre-approved set expire December 31, 2028 and need re-approval at the start of an effective code cycle.5

In the City of Los Angeles, licensed professionals can self-certify

Emergency Executive Order No. 6 directed Building and Safety to stand up a plan check self-certification pilot for single-family homes in the areas destroyed in the January 2025 fires. Enrolled California architects and civil engineers certify code compliance in place of a full plan check. It is still a pilot, with its own enrollment requirements.7

Pace is not a straight line

Recovery officials elsewhere warn against reading one city's rebuild clock onto another. Build your schedule from your own parcel, your own agency and your own contractor, not from a regional average.

How it works here

How you build here.

You send a site plan. We come back with the homes that fit, priced through delivery and set.

  1. Send the site plan

    A survey, a plat or a sketch with dimensions. Whatever you have, for one lot or forty.

  2. We fit and price

    Code decides what fits each lot, not a salesperson. You get only the homes that do, back within 3 business days.

  3. Hold the slot

    The capacity fee holds factory time and locks the home price while you finish your approvals.

  4. Delivered and set

    Your own local site contractor clears and prepares the lot, pours the foundation and brings utilities, and their bid is the price. We deliver and set the home.

PERCH is never your general contractor and never prices site work. Clearing, grading, the foundation, the utilities and the connections stay with your local team, and your local contractor's bid is the price.

Questions

Before you send a plan.

Who approves a factory-built home in Los Angeles County?

The state approves the home and the local agency approves the lot. County Public Works puts design, construction and factory work with the California Department of Housing and Community Development, and puts installation, onsite alterations and site work with city or county planning and building.6

What does the county want submitted?

For the home, stamped plans from the Design Approval Agency covering dimensions, framing, sections, connection details, materials, floor plan, elevations, installation method and Title 24 calculations. For the lot, a completed permit application, a site plan drawn to an engineer's scale and a drainage plan.6

Can I use a pre-approved standard plan?

If you are rebuilding in the Foothills communities affected by the Eaton Fire or the Coastal communities affected by the Palisades Fire, the county's pre-approved set is open to you, and Planning charges no fee for the initial zoning review. The plans cannot be altered, and a site-specific review still applies to your parcel.5

How long is review taking?

It varies by parcel and by agency, and officials who have run other rebuilds caution against treating any single figure as a schedule. Ask your reviewing agency for current times on your own project. A year after the fires, more than 2,6004 permits had been issued across the Palisades and Altadena and 3,3404 were still in review.4

Does the City of Los Angeles self-certification pilot apply to me?

Only if your project is a single-family home in an area destroyed in the January 2025 fires, inside the City, and your architect or civil engineer is enrolled with Building and Safety. The city keeps a roster of enrolled professionals.7

Who does the site work?

Your local site contractor. PERCH builds the home in the factory, then delivers and sets it. We do not bid site work and we do not estimate it.

Why would a standard home help here?

Because much of what has to be replaced is a home of broadly similar size, on a lot that already has utilities. A standard home is drawn once and built repeatedly, it is priced before you break ground, and the county's own case for pre-approved plans is a shorter review, a predictable process and a lower design cost.5

Sources (7)
  1. CAL FIRE, “Eaton Fire incident record: 14,021 acres, 9,419 structures destroyed, 1,076 damaged, 19 confirmed civilian fatalities, figures last updated 06 August 2026”, 2026-08-06. fire.ca.gov Back to text
  2. CAL FIRE, “Palisades Fire incident record: 23,448 acres, 6,845 structures destroyed, 975 damaged, 12 confirmed civilian fatalities, figures last updated 09 April 2026”, 2026-04-09. fire.ca.gov Back to text
  3. Los Angeles County Chief Executive Office, “Key Facts About the Eaton and Palisades Fires, one-year fact sheet, recovery statistics”, 2025-12-31. file.lacounty.gov Back to text
  4. CalMatters, republished by LAist, “A year after LA's devastating fires, rebuilding is under way with far more to do, by Ben Christopher”, 2026-01-07. laist.com Back to text
  5. Los Angeles County Department of Regional Planning, “Pre-Approved Standard Plans for Fire Rebuilds, including Executive Order N-29-25 and the December 31, 2028 expiration”, 2026. planning.lacounty.gov Back to text
  6. Los Angeles County Public Works, “Navigating Factory-built Housing for Single-family Residences and Duplexes, jurisdiction table and building permit submission requirements”, 2025-09. file.lacounty.gov Back to text
  7. Los Angeles Department of Building and Safety, “Self-Certification Program, residential wildfire rebuilds under Emergency Executive Order No. 6”, 2026. dbs.lacity.gov Back to text
An aerial view across the rooftops and streets of the Angelino Heights neighborhood in Los Angeles

Build here.

Send your Los Angeles site plan and get back only the homes that fit, priced through delivery and set.

Site plan

Your plan stays private. We reply by email.

Photo: David Rivera Jr, CC BY-SA 4.0