The Las Vegas Valley seen at dusk from the hills above Henderson, with a freeway in the foreground and the skyline on the horizon

Las VegasModular homes for the developers building it.

Send a site plan. Get back only the standard homes that fit, priced through delivery and set.

Send your site plan

Photo: TheYearbookTeacher, CC BY 4.0

Aerial view of the Las Vegas Valley and Henderson stopping at a hard edge of open desert, with Lake Mead beyond
The valley, Henderson and Lake Mead from the air. Photo: Doc Searls from Santa Barbara, USA, CC BY 2.0

The city

The valley has a property line, and the government owns it.

About 85 percent6 of Nevada is federal land, and in the Las Vegas Valley the line between what can be built and what cannot is drawn by an act of Congress. The Southern Nevada Public Land Management Act lets the Bureau of Land Management sell federal land inside a congressionally designated boundary, and nothing outside that boundary is for sale unless a resource management plan says so.

That makes land supply here a schedule, not a market. At the start of Fiscal Year 2025 there were over 27,000 acres1 still available for disposal inside the boundary, against nearly 44,000 acres1 already sold or conveyed. A developer who understands the nomination calendar is working with better information than one who does not.

“Alleviating challenges related to the housing crisis really comes down to a city's ability to actually build housing.”

Shawn McCoy, director, Lied Center for Real Estate, University of Nevada, Las Vegas, November 2026

In their words

Permits fell faster here than anywhere else.

The Lied Center for Real Estate at UNLV counted 5,277 residential permits3 in the Las Vegas metro through June 2026, and found Las Vegas had the largest one-year decline of any of the 55 metros above a million people, at 35 percent3.

  1. “The supply side will determine what housing or rent prices people will face in 18 to 24 months.”

    Nicholas Irwin, research director, Lied Center for Real Estate, UNLV · University of Nevada, Las Vegas, November 2026

  2. “Today, only 50 acres of that 550 have been developed.”

    David Edelblute, housing attorney, Howard and Howard Attorneys, on land set aside in the late 1990s for affordable housing · FOX5 Las Vegas, July 2026

  3. “This is exactly the kind of bold action Nevada needs to increase our housing supply and make housing more attainable”

    Joe Lombardo, Governor of Nevada, on the BLM land sale finalized in September 2026 · Bureau of Land Management, September 2026

Aerial view of curved residential streets in Summerlin running up to bare desert hills at the edge of the valley
Summerlin, at the western edge of the valley. Photo: Ken Lund from Reno, Nevada, USA, CC BY-SA 2.0

The gap

Land is released by the acre. Demand is not.

The constraint in Las Vegas is not sentiment and it is not labor. It is that the ground has to be nominated, appraised, noticed in the Federal Register and auctioned before anyone can grade it, and the pace of that has not matched the pace of household formation.

Las Vegas housing figures with sources
Federal acres still available for disposal inside the boundaryBLM, at the start of Fiscal Year 202527,000+
Acres already sold or conveyed under the actSame source, through land sales and Recreation and Public Purpose patents~44,000
Acres sold in the September 2026 auctionBLM, at appraised fair market value940
Homes that sale is expected to supportSame releaseUp to 6,000
Residential permits in the Las Vegas metro through June 2026Lied Center for Real Estate, UNLV, from Census Building Permits Survey5,277
One-year decline in permits, the largest of any big metroSame report; next largest was Orlando at 27%35%
Five-year decline in permits since June 2021Same report; largest of the 14 Western metros studied37%
Nevada's rank on the national housing supply pipelineLied Center, October 2026, of 51 states and D.C.49th
Homes permitted per month against projected new householdsSame study: 1,123 permitted, 1,245 households projected1,123 vs 1,245

What changed

What a developer actually has to clear here.

Land comes through a nomination, not a listing

To start the sale of a parcel inside the boundary, the buyer identifies it and takes the request to the local government. If the jurisdiction agrees, it nominates the parcel to the BLM, which adjudicates, appraises and publishes a Notice of Realty Action. Parcels start at appraised fair market value.1

The federal pipeline is moving again

In September 2026 the BLM finalized a sale of nearly 940 acres in Southern Nevada for $94 million, which it says is expected to support up to 6,000 homes.2

The state badges the home, the county inspects the set

Under Nevada Revised Statutes Chapter 461, factory-built housing and manufactured buildings sold to a first user in Nevada must bear an insignia of approval issued by the Manufactured Housing Division. In a county of 700,000 or more, which includes Clark County, the local enforcement agency enforces and inspects the installation.5

Zoning and setbacks stay local

The same chapter reserves zoning, setback, site development and architectural requirements to the local jurisdiction. A state insignia settles how the home is built, not where it may go.5

Entitlement is the long pole, not the home

Michael Naft, chair of the Clark County Commission, told FOX5 that the land transfer process that once took four years now runs closer to two, and is still a multi-year process before construction begins. Budget the calendar accordingly.6

How it works here

How you build here.

You send a site plan. We come back with the homes that fit, priced through delivery and set.

  1. Send the site plan

    A survey, a plat or a sketch with dimensions. Whatever you have.

  2. We fit and price

    Code decides what fits each lot, not a salesperson. You get only the homes that do.

  3. Reserve the factory slot

    The capacity fee holds the slot and locks the price.

  4. Delivered and set

    Your own site contractor handles the pad and utilities. We deliver and set the home.

PERCH is not your general contractor. Site work stays with your local team, and their bid is the price.

Questions

Before you send a plan.

How do I get land inside the disposal boundary?

You identify the parcel and present the request to the local government where it sits. If that jurisdiction agrees, it nominates the parcel to the BLM, which checks eligibility, orders an appraisal and publishes a Notice of Realty Action before the online auction. Bidding starts at appraised fair market value.1

Does a modular home need a state approval in Nevada?

Yes. Under NRS 461.190, factory-built housing and manufactured buildings sold to a first user in Nevada must bear an insignia of approval issued by the Manufactured Housing Division. The Division may also approve units already inspected and approved by another jurisdiction under equivalent codes.5

Who inspects the home once it is on the lot?

In Clark County, the local enforcement agency. NRS 461.260 requires local enforcement agencies in counties of 700,000 or more to enforce and inspect the installation of factory-built housing and manufactured buildings.5

Does the state insignia override local zoning?

No. NRS 461.260 leaves zoning, setback, site development and architectural requirements with the local jurisdiction. Confirm your parcel with Clark County or the city before you plan around a product.5

Who does the site work?

Your local team handles entitlement, site permits, grading, foundation and utilities, and the local inspections of the site and the connections. Your site contractor's bid is the site price.

Does PERCH price the site work?

No. PERCH prices the homes through delivery and set, from the factory nearest you. Your site contractor bids the grading, foundation and utilities, and that bid is the site price.

Sources (6)
  1. Bureau of Land Management, “Land Sale Auctions Frequently Asked Questions, on the Southern Nevada Public Land Management Act disposal boundary”, 2025-05-19. blm.gov Back to text
  2. Bureau of Land Management, “BLM Finalizes Major Southern Nevada Land Sale to Address Housing Needs”, 2026-09-10. blm.gov
  3. Lied Center for Real Estate, University of Nevada, Las Vegas, “Short on the Strip: Examining the Housing Permit Deficit in Las Vegas, The Lied Research Report, Vol. 3, No. 5”, 2026-09. liedcenter.unlv.edu Back to text
  4. University of Nevada, Las Vegas, “UNLV Study: Where U.S. States Rank on New Housing Supply Pipeline”, 2026-11-03. unlv.edu
  5. Nevada Legislature, “Nevada Revised Statutes Chapter 461, Factory-Built Housing, sections 461.190 and 461.260”, 2025. leg.state.nv.us Back to text
  6. FOX5 Las Vegas, “Southern Nevada housing shortage: Federal land program rarely used as gap widens, by Talia Kirkland”, 2026-07-07. fox5vegas.com Back to text
Traffic on Sahara Avenue with mid-rise buildings and construction cranes marking the downtown Las Vegas skyline behind

Build here.

Send your Las Vegas site plan and get back only the homes that fit, priced through delivery and set.

Site plan

Your plan stays private. We reply by email.

Photo: Reinhard Link from Germany, CC BY 2.0