Washington ADU Laws (2026): Can You Add a Modular ADU?

Washington cities must allow two ADUs on most urban lots. Cities and counties that plan under the Growth Management Act must allow at least two ADUs on every lot in a zone that allows single-family homes, inside urban growth areas. Check your own lot before you plan.

Source: RCW 36.70A.681(1)(c)

Updated Research checked

Statewide ADU law

Yes

RCW 36.70A.681(1)(c)

Strength

Strong

State law makes covered cities allow at least one ADU under rules the state sets.

Factory-built hook

Zoning parity + Code preemption

Factory-built insignia; HUD-code siting

Research checked

September 12, 2026

Date our team last checked the sources.

What Washington law says about ADUs

The state rule

Washington cities must allow two ADUs on most urban lots.

Source: RCW 36.70A.681(1)(c)

Cities and counties that plan under the Growth Management Act must allow at least two ADUs on every lot in a zone that allows single-family homes, inside urban growth areas. They must allow ADUs of at least 1,000 sq ft and 24 feet tall, cannot require the owner to live on site, and cannot charge ADU impact fees above half of what the main home pays. Where a city has not updated its code in time, the state rules override the local ones.

Who the law covers

Cities and counties planning under the Growth Management Act (RCW 36.70A.040), and only inside urban growth areas. Lots in critical areas or their buffers, and some impaired drinking-water watersheds, are exempt. A city may cap lots of 2,000 sq ft or less at two ADUs, and may ban ADUs on lots without public sewer.

Statutes and documents behind this section
  • RCW 36.70A.680
  • RCW 36.70A.681
  • RCW 36.70A.696
  • HB 1337 (2023), Chapter 334, Laws of 2023

Can a modular ADU go on a Washington lot?

Factory-built hook Zoning parity + Code preemption · Factory-built insignia; HUD-code siting

The ADU statute does not mention factory-built homes. Separate state law says a factory-built home with the L&I insignia is deemed to meet city and county construction codes (RCW 43.22.455), while zoning, setbacks and site rules stay local (RCW 43.22.460). Code cities may not adopt rules that discriminate against a buyer's choice of home type, and HUD-code manufactured homes must be sited the same way as site-built and factory-built homes (RCW 35A.21.312; similar rule for other cities at RCW 35.21.684).

Source: RCW 43.22.455

Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.

Washington ADU rules, point by point

What state law says on each point, with its source. Where the state is silent, your city or county decides.

How many ADUs

At least 2 ADUs per lot in any urban growth area zone that allows single-family homes: one attached plus one detached, two attached, or two detached (in one or two buildings).

Source: RCW 36.70A.681(1)(c)

Approval path

State law says cities 'must allow' two ADUs and must permit detached ADUs, and design review for ADUs cannot be stricter than for the main home. The statute does not use the words 'by right' or name a specific approval type; most cities handle ADUs through a building permit.

Source: RCW 36.70A.681(1)(c), (d), (h)

Size

A city may not set a maximum ADU floor area below 1,000 sq ft. Cities can allow more (Bellevue allows attached ADUs up to 1,200 sq ft or 40% of the structure). Outside urban growth areas, counties that choose to allow detached ADUs must cap them at 1,296 sq ft (EHB 1345, 2026).

Source: RCW 36.70A.681(1)(f)

Owner living on site

state bans the requirement. A city may not require the owner to live in the ADU or the main home. Cities may still restrict short-term rental use of ADUs.

Source: RCW 36.70A.681(1)(b); RCW 36.70A.680(5)

Lot size

A city must allow an ADU on any lot that meets the minimum lot size for the main home. On lots of 2,000 sq ft or less, a city may cap the lot at two ADUs plus the main home.

Source: RCW 36.70A.681(1)(e) and (3)

Setbacks

Setbacks, yard coverage, tree retention, door location, looks and design review for ADUs cannot be stricter than for the main home. A detached ADU may sit on the lot line next to a public alley, unless the city routinely plows that alley. Existing buildings such as garages can be converted even if they break current setback or lot coverage rules.

Source: RCW 36.70A.681(1)(h), (i), (j)

Height

A city may not set an ADU roof height limit under 24 feet, unless the main home's limit is lower; then the ADU limit cannot be lower than the main home's.

Source: RCW 36.70A.681(1)(g)

Parking

No off-street parking may be required within a half-mile walk of a major transit stop. Elsewhere, no more than 1 space per unit on lots under 6,000 sq ft and no more than 2 per unit on larger lots. A city can escape these limits only with a state-certified safety study, and they do not apply within one mile of a very large commercial airport (Sea-Tac). Separately, ESSB 5184 (2025) bars minimum parking for residences under 1,200 sq ft in cities over 30,000 people, with phase-in deadlines running into 2027 and 2028.

Source: RCW 36.70A.681(2); ESSB 5184 (2025) sec. 2-3

Permit timeline

Not ADU-specific. For project permits that need no public notice, the state default is a final decision within 65 days after the application is found complete (100 days with public notice, 170 days with notice and a hearing). Days waiting on the applicant do not count. Cities may change permit categories, and some fees are refunded (10% or 20%) when a deadline is missed, unless the city uses enough of the state's listed alternatives. There is no 'deemed approved' rule.

Source: RCW 36.70B.080(1)(d)

Impact fees

A city or county may not charge ADU impact fees greater than 50 percent of the impact fees for the main home.

Source: RCW 36.70A.681(1)(a)

Renting it out

Long-term rental is allowed (no owner-occupancy rule). Cities and counties may restrict or ban short-term rental use of ADUs.

Source: RCW 36.70A.680(5)

What changed recently

  1. EHB 1345 took effect: counties may allow one detached ADU (up to 1,296 sq ft) per parcel outside urban growth areas, if they meet water, septic, siting and enforcement rules.

    Source: EHB 1345 (2026), Chapter 231, Laws of 2026

  2. E2SHB 2418 took effect, changing project permit review steps (completeness checks and a single point of contact). It does not mention ADUs.

    Source: E2SHB 2418 (2026), Chapter 235, Laws of 2026

  3. SSB 5558 took effect: ADU rules now take effect at the same time as each jurisdiction's periodic plan update (Clark, Thurston, Whatcom and others: December 31, 2025; Spokane, Yakima, Benton and others: December 31, 2026).

    Source: SSB 5558 (2025), Chapter 148, Laws of 2025

  4. ESSB 5184 took effect: cities over 30,000 people may not require minimum parking for residences under 1,200 sq ft once implemented (18 months for cities of 50,000+).

    Source: ESSB 5184 (2025), Chapter 204, Laws of 2025

  5. Compliance date for cities in King, Kitsap, Pierce and Snohomish counties: six months after their December 31, 2024 periodic plan update deadline, under HB 1337 as first written. Where local code conflicts, state rules now control.

    Source: RCW 36.70A.130(5)(a); RCW 36.70A.680(1) (2023 version)

  6. HB 1337 took effect, creating the two-ADUs-per-lot rule and the other statewide ADU limits.

    Source: HB 1337 (2023), Chapter 334, Laws of 2023

Washington city records

Your city or county runs the permit counter. Here is what we verified for 8 places in Washington, and who to call.

Seattle

With a pre-approved detached ADU plan, SDCI says that in most cases you can get your permit in just 2 to 6 weeks.

Pre-approved DADU plans (ADUniverse gallery, run by the Office of Planning and Community Development)

Seattle Department of Construction and Inspections (SDCI)
(206) 684-8600 · Planning office website
Checked September 12, 2026

Spokane

Spokane's ADU development standards (SMC 17C.300.130) were last updated by Ordinance C36696, effective July 11, 2025.

Development Services Center
(509) 625-6300 · Planning office website
Checked September 12, 2026

Tacoma

Parking is not required for ADUs. If parking is added, it must be in and reached from the rear part of the lot.

Pre-Approved Detached ADU Plans

Planning and Development Services
(253) 591-5030 · Planning office website
Checked September 12, 2026

Vancouver

Up to two ADUs can be built on a lot, and ADU impact fees are 50% of the main home's impact fees.

Community Development, Building
(360) 487-7828 · Planning office website
Checked September 12, 2026

Bellevue

On June 24, 2025, the council adopted middle housing code changes that allow ADUs and nine types of middle housing on all lots zoned mainly for residential use.

Pre-Approved Plans Program for DADUs and Cottage Housing (in development, not yet launched)

Development Services
(425) 452-6800 · Planning office website
Checked September 12, 2026

Kent

Kent removed its owner-occupancy rule for ADUs in an ordinance effective June 15, 2023. Owners with an old ADU covenant can file an optional reversal form.

Economic and Community Development, Long Range Planning
(253) 856-5454 · Planning office website
Checked September 12, 2026

Renton

Renton offers free, pre-approved ADU base plans in eight models, from 418 to 1,000 sq ft, with an expedited review.

Permit Ready ADU (PRADU) Program

Community and Economic Development, Planning
(425) 430-7294 · Planning office website
Checked September 12, 2026

How PERCH fits

PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.

PERCH

  • Your modular home, built to order in the factory nearest you
  • Delivery to your land
  • The crew that sets the home on your foundation
  • Plan documents for your permit application

You

  • Your land
  • A licensed local contractor you hire for the site work
  • The foundation, water, sewer or septic, and power hookups
  • Your permits, using the documents we give you

Your site contractor's bid is the price for that work. PERCH does not perform site work.

Modular ADUs for Washington

Check your exact lot

Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.

Free. No obligation.

Questions, answered

Is there a statewide ADU law in Washington?

Washington cities must allow two ADUs on most urban lots. Cities and counties that plan under the Growth Management Act must allow at least two ADUs on every lot in a zone that allows single-family homes, inside urban growth areas. They must allow ADUs of at least 1,000 sq ft and 24 feet tall, cannot require the owner to live on site, and cannot charge ADU impact fees above half of what the main home pays. Where a city has not updated its code in time, the state rules override the local ones.

Can a modular home be an ADU in Washington?

The ADU statute does not mention factory-built homes. Separate state law says a factory-built home with the L&I insignia is deemed to meet city and county construction codes (RCW 43.22.455), while zoning, setbacks and site rules stay local (RCW 43.22.460). Code cities may not adopt rules that discriminate against a buyer's choice of home type, and HUD-code manufactured homes must be sited the same way as site-built and factory-built homes (RCW 35A.21.312; similar rule for other cities at RCW 35.21.684).

How big can an ADU be in Washington?

A city may not set a maximum ADU floor area below 1,000 sq ft. Cities can allow more (Bellevue allows attached ADUs up to 1,200 sq ft or 40% of the structure). Outside urban growth areas, counties that choose to allow detached ADUs must cap them at 1,296 sq ft (EHB 1345, 2026).

Do I have to live on the property to have an ADU in Washington?

state bans the requirement. A city may not require the owner to live in the ADU or the main home. Cities may still restrict short-term rental use of ADUs.

Can I rent out an ADU in Washington?

Long-term rental is allowed (no owner-occupancy rule). Cities and counties may restrict or ban short-term rental use of ADUs.

How long does an ADU permit take in Washington?

Not ADU-specific. For project permits that need no public notice, the state default is a final decision within 65 days after the application is found complete (100 days with public notice, 170 days with notice and a hearing). Days waiting on the applicant do not count. Cities may change permit categories, and some fees are refunded (10% or 20%) when a deadline is missed, unless the city uses enough of the state's listed alternatives. There is no 'deemed approved' rule.

Does PERCH do the site work?

No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.

Is this page legal advice?

No. It summarizes Washington state law as checked on September 12, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.