ADU laws · Virginia
New Virginia law opens many single-family lots to ADUs in 2027. Until July 1, 2027, and after it in any locality that already had an ADU ordinance before 2026 (such as Richmond, Alexandria and Arlington), the local ordinance decides what you can build, so check your city or county first.
Source: Va. Code 15.2-2292.4 (eff. July 1, 2027)
Updated Research checked
Strength
Moderate
State law does part of the job: it may reach only some places, start later, or set speed rules only.
Research checked
September 12, 2026
Date our team last checked the sources.
The state rule
New Virginia law opens many single-family lots to ADUs in 2027.
Starting July 1, 2027, single-family zoning districts in Virginia are treated as allowing an ADU as a permitted accessory use. The locality must issue an ADU permit (fee of $500 or less) when the ADU meets the state list of rules and local building, utility and flood codes. The law does not apply in a locality that adopted its own ADU ordinance before January 1, 2026.
Every Virginia locality (county, city or town) for its single-family residential zoning districts, EXCEPT (1) any locality that adopted an ADU ordinance before January 1, 2026 (Va. Code 15.2-2292.4(I)) and (2) ADU permits approved before July 1, 2027 (15.2-2292.4(G)). Private HOA covenants and condo rules are not overridden (15.2-2292.4(F)).
Factory-built hook Code preemption · Registered modular buildings
The ADU section does not mention factory-built homes. It requires a detached ADU to meet the Uniform Statewide Building Code for a dwelling unit. Under Va. Code 36-81, a registered industrialized (modular) building is accepted in every locality as meeting building code rules, while local zoning, utility, and site rules still apply. HUD-code manufactured homes are not addressed by the ADU section.
Source: Va. Code 15.2-2292.4(D)(5); Va. Code 36-81
Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.
What state law says on each point, with its source. Where the state is silent, your city or county decides.
Single-family zoning must allow ADUs as a permitted accessory use. A locality may bar ADUs on a lot that already has more than one dwelling unit, and may bar selling the ADU separately or subdividing it off. In practice that means one ADU with one single-family home.
By right. Zoning for single-family districts 'shall be deemed to include accessory dwelling units as a permitted accessory use.' The owner gets an ADU permit, and the locality 'shall issue the permit' if the ADU meets the section and the local codes it lists.
Source: Va. Code 15.2-2292.4(B), (C)
A locality may limit ADU floor area, lot coverage and impervious area, but the limit can be no lower than 350 sq ft on lots under 2,500 sq ft and 500 sq ft on lots of 2,500 sq ft or more. So a locality may cap a detached ADU at 500 sq ft on a normal lot. The state sets no maximum; a locality may allow more.
Source: Va. Code 15.2-2292.4(D)(4)
Allowed, but limited. A locality may require the owner to live in the ADU or the main home (not both), and only at the time the application is filed.
Source: Va. Code 15.2-2292.4(D)(6)
No separate ADU minimum lot size. A locality may not make ADU lot size or coverage rules stricter than those for a single-family home in the same zone.
Source: Va. Code 15.2-2292.4(E)(2)
Rear and side setbacks for the ADU can be no bigger than the smaller of the main-home setback or the accessory-structure setback on that lot. A locality may require the ADU to be within 500 feet of the main home.
Height rules for an ADU cannot be stricter than for a single-family home in the same zone.
Source: Va. Code 15.2-2292.4(E)(2)
A locality may require dedicated parking for the ADU, and may require replacing the main home's required parking if the ADU removes it.
The ADU section sets no deadline in days and no deemed-approved rule. It says the locality 'shall issue the permit' when the ADU complies.
Source: Va. Code 15.2-2292.4(C)
The ADU permit fee is capped at $500. Normal inspection, site and building permit fees still apply on top. A locality may not require public street improvements as a condition, except to fix a street the ADU work damages. The law does not mention impact or utility connection fees.
Source: Va. Code 15.2-2292.4(C), (E)(4)
A locality may require that any rental of an ADU be for 30 days in a row or longer, which lets it ban short-term rental of ADUs.
Source: Va. Code 15.2-2292.4(D)(1)
Effective date: single-family zones in covered localities must treat ADUs as a permitted accessory use, with a permit fee of $500 or less.
Source: Va. Code 15.2-2292.4
SB 531 approved and chaptered as 2026 Acts ch. 895, adding Va. Code 15.2-2292.4. It takes effect July 1, 2027.
Source: 2026 Va. Acts ch. 895 (SB 531)
Your city or county runs the permit counter. Here is what we verified for 7 places in Virginia, and who to call.
New structures in the Chesapeake Bay Preservation Area, flood zones or the Southern Rivers Watershed Area may need extra environmental approvals before a building permit can be issued.
Zoning Administration is at City Hall, 306 Cedar Road, 2nd floor, open 8 a.m. to 5 p.m. Monday to Friday, with a drop box for after-hours submittals.
Building and zoning permits are applied for and issued online through Norfolk's E-Permit Portal, and a building permit is needed for any accessory structure over 256 sq ft.
Richmond allows one ADU in all residential districts. It can be up to one-third of the main home's floor area or 500 sq ft, whichever is greater.
Zoning applications are filed online in the Citizen Self Service Portal, and permits are generally issued there 2 to 3 business days after payment.
City Council approved Alexandria's ADU policy on January 23, 2021. The rules are in Zoning Ordinance Section 7-203, and the city posts a list of approved ADUs.
Every accessory dwelling needs two permits: an AD permit from the Zoning Division (allow about 30 days after the application is accepted) and a residential building permit.
PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.
Your site contractor's bid is the price for that work. PERCH does not perform site work.
Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.
New Virginia law opens many single-family lots to ADUs in 2027. Starting July 1, 2027, single-family zoning districts in Virginia are treated as allowing an ADU as a permitted accessory use. The locality must issue an ADU permit (fee of $500 or less) when the ADU meets the state list of rules and local building, utility and flood codes. The law does not apply in a locality that adopted its own ADU ordinance before January 1, 2026.
The ADU section does not mention factory-built homes. It requires a detached ADU to meet the Uniform Statewide Building Code for a dwelling unit. Under Va. Code 36-81, a registered industrialized (modular) building is accepted in every locality as meeting building code rules, while local zoning, utility, and site rules still apply. HUD-code manufactured homes are not addressed by the ADU section.
A locality may limit ADU floor area, lot coverage and impervious area, but the limit can be no lower than 350 sq ft on lots under 2,500 sq ft and 500 sq ft on lots of 2,500 sq ft or more. So a locality may cap a detached ADU at 500 sq ft on a normal lot. The state sets no maximum; a locality may allow more.
Allowed, but limited. A locality may require the owner to live in the ADU or the main home (not both), and only at the time the application is filed.
A locality may require that any rental of an ADU be for 30 days in a row or longer, which lets it ban short-term rental of ADUs.
The ADU section sets no deadline in days and no deemed-approved rule. It says the locality 'shall issue the permit' when the ADU complies.
No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.
No. It summarizes Virginia state law as checked on September 12, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.
Not legal advice. This page summarizes state law as of September 12, 2026. Laws change, cities add their own rules, and deed restrictions can apply. Confirm with your local planning office, and with an attorney for anything binding.
A 7-day review of your land, your home and your budget. We confirm your land can take your home, check your permit and line up your site contractor, then walk you through it on a call.
You pay on Stripe. PERCH never asks for payment by text.