ADU laws · South Carolina

South Carolina ADU Laws (2026): Can You Add a Modular ADU?

South Carolina has no ADU law. Your city sets the rules. Zoning power flows to cities and counties through the “Local Government Comprehensive Planning Enabling Act of 1994”, which is S.C. Code Title 6, Chapter 29. Whether you can build an ADU is decided by your own city or county code. Check your own lot before you plan.

Source: S.C. Code Title 6, Chapter 29; no ADU mandate in the chapter, and the only 2025-2026 ADU bill (H 3469) did not become law

Updated Research checked

Strength

None

There is no statewide ADU law. Each city or county decides.

Factory-built hook

Code preemption

Zoning expressly left local

Research checked

September 19, 2026

Date our team last checked the sources.

What South Carolina law says about ADUs

South Carolina has no statewide accessory dwelling unit law. Zoning power flows to cities and counties through the “Local Government Comprehensive Planning Enabling Act of 1994”, which is S.C. Code Title 6, Chapter 29. That chapter says what a local government may regulate and how it must run a zoning decision. It does not tell any city or county that it has to allow a second small home on a lot. Whether you can build an ADU is decided by your own city or county code.

Who the law covers

No statewide ADU mandate and no state preemption of local ADU zoning. Title 6, Chapter 29 is enabling law: S.C. Code 6-29-720(A) says a governing body 'may adopt' a zoning ordinance and lists what it may regulate. The only place the phrase 'accessory dwellings' appears in the chapter is S.C. Code 6-29-1110(3)(e), inside the definition of 'market-based incentives', which describes design flexibility and preapproved design standards that a local government may choose to use. It is a voluntary tool, not a requirement.

Statutes and documents behind this section
  • S.C. Code Title 6, Chapter 29 (“Local Government Comprehensive Planning Enabling Act of 1994”), full chapter text
  • S.C. Code 6-29-720(A) and (C), what a local government may regulate and which techniques it may use
  • S.C. Code 6-29-1110(3)(e), 'market-based incentives' including promoting accessory dwellings
  • South Carolina Legislature full-text search of LEGISLATION for 'accessory dwelling', Session 126 (2025-2026): 1 match, H 3469

Can a modular ADU go on a South Carolina lot?

Factory-built hook Code preemption · Zoning expressly left local

Two halves, and both matter. First half: a modular home carrying a South Carolina Building Codes Council certification label has statewide standing. S.C. Code 23-43-100 says certified modular building units 'are considered to comply with the requirements of all laws, ordinances, and regulations of this State or of local governments which govern the matters within the scope of the approval and certification', and that local code enforcement agencies 'shall issue building permits for certified modular building units, prior to installation, and issue certificates of occupancy after they have been installed and inspected'. S.C. Code 23-43-130 adds that labeled units 'must be acceptable in all localities' and 'must be considered and accepted equivalent to a site-built structure', and that local rules 'must be reasonable and uniformly applied and enforced without any distinction as to whether a building is a modular or constructed on site in a conventional manner'. Second half: the same section 23-43-130 says 'Local land use and zoning requirements, fire zones, building setback requirements, site development requirements, subdivision control, and on-site installation requirements, as well as the review and regulation of aesthetic requirements, are specifically and entirely reserved to local authorities.' So state modular approval does NOT override local zoning. If your city does not allow an ADU on your lot, a modular home does not change that. Where an ADU is allowed, a labeled modular home has to be treated the same as a site-built one on construction standards. Manufactured (HUD code) homes are a different legal category. S.C. Code 23-43-20(2) defines a modular building unit as a building 'other than a mobile or manufactured home', and 23-43-20(5) defines mobile or manufactured home as a unit built to United States Department of Housing and Urban Development standards. Several South Carolina cities bar manufactured homes as ADUs: Columbia's UDO says a manufactured home, recreational vehicle, travel trailer, camper or similar vehicle may not be used as an accessory dwelling unit.

Source: S.C. Code 23-43-100 and 23-43-130, Modular Buildings Construction Act

Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.

South Carolina ADU rules, point by point

What state law says on each point, with its source. Where the state is silent, your city or county decides.

How many ADUs

Not set by state law. Each city and county decides. Examples from official city sources: Charleston allows one ADU and says an ADU may be approved in any base zoning district. Columbia allows no more than one ADU per lot, and only on a lot with a single-family detached home. Summerville allows one per lot, and two in its N-R, N-MX and GR-2 districts. Greenville lists the accessory dwelling unit as an accessory use permitted with standards in its house-scale residential districts.

Source: City of Columbia Unified Development Ordinance, Sec. 17-4.3(d)(1)(a), posted by the City Zoning Division

Approval path

Not set by state law. It varies by city. Columbia and Greenville treat the ADU as an accessory use with written standards, which is staff review rather than a hearing. Summerville lists the accessory dwelling unit under its conditional use provisions and shows it as permitted in some districts and conditional in others. Charleston runs an ADU application plus a single-family building permit through its Permit Center.

Source: Town of Summerville Unified Development Ordinance, Sec. 3.4.2.B, Conditional Use Provisions

Size

No state floor and no state cap. Local caps vary. Charleston: total conditioned floor area cannot exceed 850 sq ft. Columbia: no more than the lesser of 1,000 sq ft or 50 percent of the floor area of the principal dwelling, not counting carports, garages and unfinished basements. Greenville: 80 percent of the primary dwelling, up to a maximum of 1,000 sq ft. Summerville: no more than 50 percent of the gross floor area of the primary building, and no more than two bedrooms. Confirm the current number with your city before you plan.

Source: City of Charleston, Accessory Dwelling Unit (ADU) page

Owner living on site

Not addressed by state law, and cities may require it. Every South Carolina city where we could read the actual ADU rule requires it. Charleston: either the main unit or the ADU must be owner-occupied and serve as the owner's primary dwelling. Columbia: either the principal dwelling or the ADU must be the permanent, full-time residence of the owner of the lot. Greenville: the property owner must occupy either the principal dwelling or the ADU as their primary residence. Summerville: the primary dwelling must be owner-occupied and the ADU must have the same ownership.

Source: City of Greenville Development Code, Sec. 19-3.5.2.A.11

Lot size

Not addressed by state law. Local minimum lot sizes apply. Summerville adds that the lot must be served with public water and sewer before an ADU is allowed.

Source: Town of Summerville Unified Development Ordinance, Sec. 3.4.2.B.1

Setbacks

Not addressed by state law. Local setbacks apply, and S.C. Code 23-43-130 expressly reserves building setback requirements to local authorities. Columbia's general accessory rules say an accessory structure may not be closer than three feet to any side or rear property line, may not be within five feet of the main building unless it is open on all sides, may not sit in a required front yard, and a detached ADU must be at least ten feet from the principal structure. Greenville requires an ADU to meet all district standards including setbacks, height, massing, side wall height and building coverage. Summerville requires the ADU to be placed to the rear or side of the primary residence.

Source: City of Columbia Unified Development Ordinance, Sec. 17-4.3(c)(7)-(9) and 17-4.3(d)(1)(c)(2)

Height

Not addressed by state law. Local height limits apply. Greenville requires an ADU to comply with all district standards including height, massing and side wall height, and bars rooftop and second-story decks on an ADU unless they face the interior of the lot. No statewide ADU height number exists.

Source: City of Greenville Development Code, Sec. 19-3.5.2.A.3 and A.6

Parking

Not addressed by state law. Cities set it. Charleston requires one space beyond the two required for the primary home, all on the same lot, and allows tandem spaces at least 9 feet by 18.5 feet. Columbia requires at least one off-street space in addition to those required for the primary dwelling. Summerville's ADU standards list a maximum of two off-street parking spaces per ADU.

Source: City of Charleston, Accessory Dwelling Unit (ADU) page

Permit timeline

There is no state deadline and no automatic approval for an ADU or a building permit. S.C. Code 6-29-1150 does set a deemed-approved rule, but only for subdivision plats and land development plans: time limits 'not to exceed sixty days' must be set for action on plans or plats, and failure of the designated authority to act within sixty days is considered to constitute approval. That is a plat and plan rule, not a building permit rule. H 3215 (2025) would have created a 45-day deemed-approved clock for building permits and zoning appeals, and it did not become law. Your ADU timeline is whatever your local building and planning department sets.

Source: S.C. Code 6-29-1150 (submission procedures, sixty-day rule for plats and plans)

Impact fees

Not addressed by state law for ADUs. Local permit fees, plan review fees, and water and sewer tap fees apply and vary by city. Mount Pleasant's own department page says it administers municipal impact fees.

Source: Town of Mount Pleasant, Planning, Land Use, and Neighborhoods department page

Renting it out

Not addressed by state law for ADUs. Short-term rental rules are local and they are strict. Charleston says a lot with an ADU is not eligible for a Short-Term Rental permit. Columbia says an ADU may not be leased or rented for tenancies of less than 30 days. Greenville says an ADU may be rented but cannot be sold separately from the primary dwelling, and short-term rental use is only allowed as its own code section provides. Columbia also bars home occupations in an ADU and requires the same street address and mailbox as the main home.

Source: City of Columbia Unified Development Ordinance, Sec. 17-4.3(d)(1)(f), (i) and (k)

What changed recently

  1. The Town of Summerville Unified Development Ordinance, adopted October 10, 2019, was last amended. The version posted by the Town carries a July 9, 2026 footer date and keeps ADU standards at one per lot, two in the N-R, N-MX and GR-2 districts, with a 50 percent size cap and a two-bedroom cap.

    Source: Town of Summerville UDO, page footer and Sec. 3.4.2.B

  2. The City of Greenville Development Code, originally adopted June 12, 2023, was amended following its 30-month code review. The amended code keeps the accessory dwelling unit as an accessory use with standards in the house-scale residential districts, caps it at 80 percent of the primary dwelling up to 1,000 square feet, and requires the owner to live in either the main home or the ADU.

    Source: City of Greenville Development Code, cover page and Sec. 19-3.5.2.A

  3. The Town of Mount Pleasant's new Zoning Code of Ordinances took effect. The Town moved its Vested Rights and Workforce Housing Exemption Grant Program sections out of the Zoning Code into sections 151 and 154.

    Source: Town of Mount Pleasant, Planning, Land Use, and Neighborhoods department page

  4. H 3469, the Accessory Dwelling Unit Affordable Housing Incentive Act, was introduced in the South Carolina House and sent to Ways and Means. It would have exempted the value of a qualifying rented ADU from property tax. As of September 19, 2026 the bill page still says it is residing in the House. It is not law, and nothing changed for homeowners.

    Source: South Carolina General Assembly, H 3469 (2025-2026) status and text

  5. Columbia City Council adopted a residential intensification moratorium covering six named areas: Granby, Hollywood/Rose Hill, the Martin Luther King, Jr. Neighborhood, University Hills, Wales Garden and Wheeler Hill. The City says it pauses residential intensification of two-, three- and four-family dwellings, expansion of vehicular use areas, and conversion or demolition-replacement of single-family detached dwellings. The City's page describes it as temporary and does not list accessory dwelling units among the paused activities. The page is live as of September 19, 2026 and says the item got first reading on August 18 and was adopted with amendments on second reading on September 1, but it does not print the year, so do not publish a year.

    Source: City of Columbia Planning and Development, Residential Intensification Moratorium page

South Carolina city records

Your city or county runs the permit counter. Here is what we verified for 9 places in South Carolina, and who to call.

Charleston

Charleston's own ADU page says an ADU may be approved in any base zoning district, as long as the lot has no covenant prohibiting one. The total conditioned floor area cannot exceed 850 square feet. Either the main home or the ADU must be owner-occupied and be the owner's primary dwelling. One extra parking space is required on the same lot beyond the two for the main home, and tandem spaces at least 9 feet by 18.5 feet are allowed. A lot with an ADU is not eligible for a Short-Term Rental permit.

City of Charleston ADU application (ADU application and site plan, then a New Single Family Building Permit, then a recorded Declaration of Covenants)

Department of Planning, Preservation and Sustainability; Permit Center
(843) 724-7311 · Planning office website
Checked September 19, 2026

Columbia

Columbia's Zoning Division publishes the ADU rule as a handout. Under UDO Sec. 17-4.3(d)(1), one ADU is allowed per lot and only as accessory to a single-family detached home. Either the main home or the ADU must be the owner's permanent, full-time residence. Floor area is capped at the lesser of 1,000 square feet or 50 percent of the main home, not counting carports, garages and unfinished basements. A detached ADU must sit at least ten feet from the main house and in the same base zoning district. A manufactured home, recreational vehicle, travel trailer or camper may not be used as an ADU. One extra off-street parking space is required, and the ADU may not be rented for stays under 30 days.

Unified Development Ordinance (UDO), effective August 30, 2021, text amendments ongoing

Planning and Development Services, Zoning Division
(803) 545-3333 · Planning office website
Checked September 19, 2026

North Charleston

Planning and Zoning sits in the One Stop Shop on the 3rd floor of City Hall at 2500 City Hall Lane, open Monday through Friday from 8:00 a.m. to 4:30 p.m. Before you commit to a plan, you can order a Zoning Verification Letter through the City's Customer Portal for a $10 fee, which tells you in writing what your lot is zoned and what that zoning allows.

Planning and Zoning Department
(843) 740-2571 · Planning office website
Checked September 19, 2026

Mount Pleasant

Mount Pleasant's new Zoning Code of Ordinances took effect on May 1, 2025 and is published with the rest of the Town code through American Legal. Planning, building and other construction permits now run through one online system called OPAL. The department at 100 Ann Edwards Lane administers the zoning ordinance, the land development regulations and the Town's impact fees, and it is open Monday through Friday from 8:00 a.m. to 4:30 p.m.

OPAL online permitting and land use system

Department of Planning, Land Use, and Neighborhoods
(843) 884-1229 · Planning office website
Checked September 19, 2026

Rock Hill

Rock Hill's Planning and Development Department is at 155 Johnston Street and is open by appointment only, 8:30 a.m. to 4 p.m. Monday through Friday, so plan to book before you go. The department covers permits and inspections, development plan review, planning and preservation, and it staffs the Planning Commission, the Zoning Board of Appeals and the Board of Historic Review.

Planning and Development Department
(803) 325-2500 · Planning office website
Checked September 19, 2026

Greenville

Greenville's Development Code lists the accessory dwelling unit as an accessory use permitted with standards in its house-scale residential districts. Sec. 19-3.5.2.A caps an ADU at 80 percent of the primary dwelling, up to a maximum of 1,000 square feet, and requires it to meet all district standards for setbacks, height, massing, side wall height and building coverage. The owner has to live in either the main home or the ADU. An ADU may be rented but cannot be sold separately, it can have its own address, and its utilities may be separately metered. City staff report to City Council each year from 2025 through 2028 on how many new ADUs are built.

Greenville Development Code (adopted June 12, 2023, amended April 13, 2026)

Planning and Development Department
864-467-4476 · Planning office website
Checked September 19, 2026

Summerville

Summerville's UDO treats the accessory dwelling unit as its own use, allowed in the N-R, N-MX, GR-2, GR-3, GR-5, MF-R and MH-R districts. The lot has to be served by public water and sewer. One ADU is allowed per lot, and two are allowed in N-R, N-MX and GR-2. The primary home must be owner-occupied and the ADU must have the same owner. The ADU has to sit to the rear or side of the main home, is capped at two bedrooms and at 50 percent of the gross floor area of the main building, and its exterior has to match the main home in color, siding, roof pitch, window detailing, roofing materials and foundation appearance.

Unified Development Ordinance (adopted October 10, 2019, last amended July 9, 2026)

Planning Department
843-851-4213 · Planning office website
Checked September 19, 2026

Goose Creek

Goose Creek runs planning and zoning as a division of Creek Compass, the City's development services group, with an online Planning Permit portal for applications. The department is at 519 North Goose Creek Blvd and is reached at (843) 797-6220 extension 1114. The Board of Zoning Appeals and the Planning Commission both post agendas and minutes on the City site, so you can see how similar requests were decided before you apply.

Creek Compass (the City's development services brand, with an online Planning Permit portal)

Planning and Zoning Department
(843) 797-6220 ext. 1114 · Planning office website
Checked September 19, 2026

Greenwood

The City of Greenwood and Greenwood County share one Planning Department, so the same staff handle zoning questions whether your lot is inside the city limits or just outside them. The City/County Planning Director is Ryan Bland at 864-942-8636, and the planner listed is Tracey Goldman-Busbee at 864-942-8765. City Hall is at 520 Monument Street, (864) 942-8400.

Greenwood City/County Planning Department
864-942-8636 · Planning office website
Checked September 19, 2026

How PERCH fits

PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.

PERCH

  • Your modular home, built to order in the factory nearest you
  • Delivery to your land
  • The crew that sets the home on your foundation
  • Plan documents for your permit application

You

  • Your land
  • A licensed local contractor you hire for the site work
  • The foundation, water, sewer or septic, and power hookups
  • Your permits, using the documents we give you

Your site contractor's bid is the price for that work. PERCH does not perform site work.

Modular ADUs for South Carolina

Check your exact lot

Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.

Free. No obligation.

Questions, answered

Is there a statewide ADU law in South Carolina?

South Carolina has no ADU law. Your city sets the rules. South Carolina has no statewide accessory dwelling unit law. Zoning power flows to cities and counties through the “Local Government Comprehensive Planning Enabling Act of 1994”, which is S.C. Code Title 6, Chapter 29. That chapter says what a local government may regulate and how it must run a zoning decision. It does not tell any city or county that it has to allow a second small home on a lot. Whether you can build an ADU is decided by your own city or county code.

Can a modular home be an ADU in South Carolina?

Two halves, and both matter. First half: a modular home carrying a South Carolina Building Codes Council certification label has statewide standing. S.C. Code 23-43-100 says certified modular building units 'are considered to comply with the requirements of all laws, ordinances, and regulations of this State or of local governments which govern the matters within the scope of the approval and certification', and that local code enforcement agencies 'shall issue building permits for certified modular building units, prior to installation, and issue certificates of occupancy after they have been installed and inspected'. S.C. Code 23-43-130 adds that labeled units 'must be acceptable in all localities' and 'must be considered and accepted equivalent to a site-built structure', and that local rules 'must be reasonable and uniformly applied and enforced without any distinction as to whether a building is a modular or constructed on site in a conventional manner'. Second half: the same section 23-43-130 says 'Local land use and zoning requirements, fire zones, building setback requirements, site development requirements, subdivision control, and on-site installation requirements, as well as the review and regulation of aesthetic requirements, are specifically and entirely reserved to local authorities.' So state modular approval does NOT override local zoning. If your city does not allow an ADU on your lot, a modular home does not change that. Where an ADU is allowed, a labeled modular home has to be treated the same as a site-built one on construction standards. Manufactured (HUD code) homes are a different legal category. S.C. Code 23-43-20(2) defines a modular building unit as a building 'other than a mobile or manufactured home', and 23-43-20(5) defines mobile or manufactured home as a unit built to United States Department of Housing and Urban Development standards. Several South Carolina cities bar manufactured homes as ADUs: Columbia's UDO says a manufactured home, recreational vehicle, travel trailer, camper or similar vehicle may not be used as an accessory dwelling unit.

How big can an ADU be in South Carolina?

No state floor and no state cap. Local caps vary. Charleston: total conditioned floor area cannot exceed 850 sq ft. Columbia: no more than the lesser of 1,000 sq ft or 50 percent of the floor area of the principal dwelling, not counting carports, garages and unfinished basements. Greenville: 80 percent of the primary dwelling, up to a maximum of 1,000 sq ft. Summerville: no more than 50 percent of the gross floor area of the primary building, and no more than two bedrooms. Confirm the current number with your city before you plan.

Do I have to live on the property to have an ADU in South Carolina?

Not addressed by state law, and cities may require it. Every South Carolina city where we could read the actual ADU rule requires it. Charleston: either the main unit or the ADU must be owner-occupied and serve as the owner's primary dwelling. Columbia: either the principal dwelling or the ADU must be the permanent, full-time residence of the owner of the lot. Greenville: the property owner must occupy either the principal dwelling or the ADU as their primary residence. Summerville: the primary dwelling must be owner-occupied and the ADU must have the same ownership.

Can I rent out an ADU in South Carolina?

Not addressed by state law for ADUs. Short-term rental rules are local and they are strict. Charleston says a lot with an ADU is not eligible for a Short-Term Rental permit. Columbia says an ADU may not be leased or rented for tenancies of less than 30 days. Greenville says an ADU may be rented but cannot be sold separately from the primary dwelling, and short-term rental use is only allowed as its own code section provides. Columbia also bars home occupations in an ADU and requires the same street address and mailbox as the main home.

How long does an ADU permit take in South Carolina?

There is no state deadline and no automatic approval for an ADU or a building permit. S.C. Code 6-29-1150 does set a deemed-approved rule, but only for subdivision plats and land development plans: time limits 'not to exceed sixty days' must be set for action on plans or plats, and failure of the designated authority to act within sixty days is considered to constitute approval. That is a plat and plan rule, not a building permit rule. H 3215 (2025) would have created a 45-day deemed-approved clock for building permits and zoning appeals, and it did not become law. Your ADU timeline is whatever your local building and planning department sets.

Does PERCH do the site work?

No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.

Is this page legal advice?

No. It summarizes South Carolina state law as checked on September 19, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.