Portland
The City can waive system development charges for a new ADU if the owner signs a covenant that the ADU and the house will not be used as a short-term rental for 10 years.
Free pre-approved detached ADU plans; ADU SDC Waiver Program
ADU laws · Oregon
Oregon cities over 2,500 people must allow an ADU per house. State law guarantees at least one ADU per detached house in covered cities, but each city sets its own size, height and design rules, so the size of ADU you can build depends on the city. Check your own lot before you plan.
Source: ORS 197A.425(1)(a)
Updated Research checked
Strength
Moderate
State law does part of the job: it may reach only some places, start later, or set speed rules only.
Research checked
September 12, 2026
Date our team last checked the sources.
The state rule
Oregon cities over 2,500 people must allow an ADU per house.
Source: ORS 197A.425(1)(a)
Oregon cities over 2,500 people, and counties over 15,000, must allow at least one ADU for each detached house in areas inside the urban growth boundary zoned for detached homes. Cities may set reasonable siting and design rules, but they may not require the owner to live on site or require extra off-street parking. Housing rules inside urban growth boundaries must be clear and objective and may not add unreasonable cost or delay.
Cities with more than 2,500 people and counties with more than 15,000 people, in areas inside the urban growth boundary zoned for detached single-unit homes (ORS 197A.425). Outside urban growth boundaries, counties may choose to allow one rural ADU on rural residential lots of 2 acres or more (ORS 215.495); they are not required to.
Factory-built hook Zoning parity · Inside urban growth boundaries
The state ADU definition covers any interior, attached or detached residential structure, and does not exclude factory-built homes. Inside urban growth boundaries, cities must allow manufactured homes and prefabricated structures on all land zoned for single-unit homes, and may not hold them to standards that would not apply to a site-built home of the same housing type (limited exceptions, including historic districts). A prefabricated home must carry an Oregon insignia of compliance.
Source: ORS 197A.425(1)(b)(A); ORS 197A.432(1), (2) and (4); ORS 455.705
Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.
What state law says on each point, with its source. Where the state is silent, your city or county decides.
At least 1 ADU for each detached single-unit house. State law sets a floor, not a cap. Some cities allow 2 (for example Portland and Bend).
Source: ORS 197A.425(1)(a)
Cities must allow ADUs, subject to reasonable siting and design rules. Rules for housing inside urban growth boundaries must be clear and objective and may not cause unreasonable cost or delay. Since July 1, 2026, clear and objective housing applications may not be sent to a public hearing, and only the applicant may appeal locally. Many cities treat an ADU as a building permit only.
Source: ORS 197A.425(1); ORS 197A.400(1) and (5) as amended by HB 4037 (2026)
State law sets no minimum size a city must allow for urban ADUs. Cities set their own caps. Examples from city sites: Portland 800 sq ft or 75% of the house, whichever is smaller; Bend 800 sq ft; Salem and Gresham 900 sq ft or 75% of the house, whichever is less. Rural ADUs under ORS 215.495 are capped at 900 sq ft of usable floor area.
Source: ORS 197A.425; ORS 215.495(2)(f)
state bans the requirement (except that cities may require owner-occupancy for vacation rentals)
Source: ORS 197A.425(1)(b)(B) and (2)
Not set by the ADU statute for urban lots. Under SB 1537 (2024), a city must grant up to a 10 percent adjustment to minimum lot size for new housing, including ADUs, through January 1, 2032. Rural ADUs need a lot of at least 2 acres.
Source: 2024 c.110 s.38(4)(d) (compiled as a note in ORS chapter 197A); ORS 215.495(2)(b)
Not set by state law; cities set them. Under SB 1537 (2024), a city must grant up to a 10 percent adjustment to side or rear setbacks for new housing, including ADUs, through January 1, 2032.
Source: 2024 c.110 s.38(4)(a) (compiled as a note in ORS chapter 197A)
Not set by state law for urban ADUs; cities set height limits (for example Portland 20 feet for detached ADUs outside setbacks, Salem 25 feet).
Cities may not require additional off-street parking for an ADU (they may for vacation rentals).
Source: ORS 197A.425(1)(b)(B) and (2)
A city must take final action on a land use application within 120 days after it is deemed complete. If it misses the deadline, it must refund at least half of the application fees. This deadline covers land use applications, not plain building permits. There is no automatic approval.
Source: ORS 227.178(1) and (8)
The ADU statute does not cap or waive system development charges (SDCs). HB 2138 (2025) directs the state land use commission to develop model SDCs for optional local use. Several large cities waive or cut ADU SDCs on their own (Portland, Salem, Medford).
Source: ORS 197A.425; 2025 c.476 s.22(1)(f) (compiled as a note in ORS chapter 197A)
Long-term rental of an ADU is allowed; the state bans owner-occupancy rules. Cities may regulate vacation (short-term) rentals, including requiring owner-occupancy or parking for them. Rural ADUs may not be used as vacation rentals.
Source: ORS 197A.425(2); ORS 215.495(3)
HB 4037 became operative for housing reviews. Clear and objective housing applications cannot be sent to a public hearing, notice is limited to nearby owners, and only the applicant can appeal locally.
SB 75 took effect. It removed wildfire hazard map requirements from the rural ADU law.
Source: SB 75 (2025), 2025 c.589
HB 2138 took effect. The state land use commission must adopt rules by January 1, 2028 that limit unreasonable cost or delay from local ADU siting and design standards.
Source: HB 2138 (2025), 2025 c.476 s.22
HB 2258 took effect. The state may adopt rules for preapproved housing types, including ADUs and modular homes up to 2,200 sq ft, on certain vacant urban lots. Initial rules are due by January 1, 2027.
SB 1537 took effect. Cities must grant limited adjustments (for example up to 10 percent on side or rear setbacks and lot coverage, and parking minimums) for new housing, including ADUs, until January 2, 2032.
Source: SB 1537 (2024), 2024 c.110 s.38
Your city or county runs the permit counter. Here is what we verified for 8 places in Oregon, and who to call.
The City can waive system development charges for a new ADU if the owner signs a covenant that the ADU and the house will not be used as a short-term rental for 10 years.
Free pre-approved detached ADU plans; ADU SDC Waiver Program
Eugene's library has 12 pre-approved ADU plans sold by their designers for $500 each, plus one free plan by the City (The Joel, a 576 sq ft studio).
Pre-Approved Accessory Dwelling Unit Program
Salem City Council has waived system development charges for ADUs, and an ADU only needs a building permit if it meets the city's special use standards.
Ready-build ADU plans (free to download)
Gresham's development code (June 2026 version) caps an ADU at 900 sq ft or 75 percent of the main home's floor area, whichever is less.
New ADUs go through a Zoning Review application in the City of Hillsboro Permit Portal, with an ADU-specific checklist.
Bend ADUs must be 800 sq ft or less, and up to two ADUs can be built on a residential lot with a single-unit home, townhome or manufactured home.
Free Pre-Approved Plans Program
In Beaverton, an ADU can sit 5 feet from the rear property line if its height is limited to 15 feet.
Medford cuts city-assessed system development charges by 50% for new ADU building permits from December 1, 2020 through June 30, 2027.
ADU SDC Reduction Program; Permit Ready Plans
PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.
Your site contractor's bid is the price for that work. PERCH does not perform site work.
Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.
Oregon cities over 2,500 people must allow an ADU per house. Oregon cities over 2,500 people, and counties over 15,000, must allow at least one ADU for each detached house in areas inside the urban growth boundary zoned for detached homes. Cities may set reasonable siting and design rules, but they may not require the owner to live on site or require extra off-street parking. Housing rules inside urban growth boundaries must be clear and objective and may not add unreasonable cost or delay.
The state ADU definition covers any interior, attached or detached residential structure, and does not exclude factory-built homes. Inside urban growth boundaries, cities must allow manufactured homes and prefabricated structures on all land zoned for single-unit homes, and may not hold them to standards that would not apply to a site-built home of the same housing type (limited exceptions, including historic districts). A prefabricated home must carry an Oregon insignia of compliance.
State law sets no minimum size a city must allow for urban ADUs. Cities set their own caps. Examples from city sites: Portland 800 sq ft or 75% of the house, whichever is smaller; Bend 800 sq ft; Salem and Gresham 900 sq ft or 75% of the house, whichever is less. Rural ADUs under ORS 215.495 are capped at 900 sq ft of usable floor area.
state bans the requirement (except that cities may require owner-occupancy for vacation rentals)
Long-term rental of an ADU is allowed; the state bans owner-occupancy rules. Cities may regulate vacation (short-term) rentals, including requiring owner-occupancy or parking for them. Rural ADUs may not be used as vacation rentals.
A city must take final action on a land use application within 120 days after it is deemed complete. If it misses the deadline, it must refund at least half of the application fees. This deadline covers land use applications, not plain building permits. There is no automatic approval.
No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.
No. It summarizes Oregon state law as checked on September 12, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.
Not legal advice. This page summarizes state law as of September 12, 2026. Laws change, cities add their own rules, and deed restrictions can apply. Confirm with your local planning office, and with an attorney for anything binding.
A 7-day review of your land, your home and your budget. We confirm your land can take your home, check your permit and line up your site contractor, then walk you through it on a call.
You pay on Stripe. PERCH never asks for payment by text.