ADU laws · North Carolina

North Carolina ADU Laws (2026): Can You Add a Modular ADU?

From January 2027, big NC cities must allow one ADU per house. North Carolina passed its first statewide ADU rule in August 2026. New G.S. 160D-917 says a covered city must allow at least one ADU for every single detached house in a residential zone that allows detached houses. Check your own lot before you plan.

Source: G.S. 160D-917(a), (h); S.L. 2026-59, sec. 44(d)

Updated Research checked

Strength

Moderate

State law does part of the job: it may reach only some places, start later, or set speed rules only.

Factory-built hook

State label only

State stamp; ADU must meet NC Residential Code

Research checked

September 19, 2026

Date our team last checked the sources.

What North Carolina law says about ADUs

The state rule

From January 2027, big NC cities must allow one ADU per house.

Source: G.S. 160D-917(a), (h); S.L. 2026-59, sec. 44(d)

North Carolina passed its first statewide ADU rule in August 2026. New G.S. 160D-917 says a covered city must allow at least one ADU for every single detached house in a residential zone that allows detached houses. The city cannot require a rezoning, cannot require parking, cannot charge extra fees, and cannot cap the ADU below 800 square feet. The rule does not start yet: it applies to permit applications filed on or after January 15, 2027.

Who the law covers

Cities with a population of 50,000 or more that are NOT in the coastal area as defined in G.S. 113A-103. That definition covers 20 CAMA coastal counties, including New Hanover and Onslow, so Wilmington and Jacksonville sit outside the new section. Counties and smaller towns are not covered. Historic preservation districts, National Historic Landmark properties, and units with no water, well and septic, or sewer connection are carved out. Private covenants and HOA rules are not touched.

Statutes and documents behind this section
  • S.L. 2026-59, sec. 44 (G.S. 160D-917), Senate Bill 445
  • SB 445 bill history page
  • G.S. 113A-103(2), definition of 'coastal area'
  • N.C. General Statutes Chapter 160D (local planning and development regulation)

Can a modular ADU go on a North Carolina lot?

Factory-built hook State label only · State stamp; ADU must meet NC Residential Code

The new state section does not name modular homes, but it requires an ADU to conform to the North Carolina Residential Code. Modular (factory-built) homes in North Carolina are built to the state code and carry a State of North Carolina Modular Construction Validating Stamp, so a modular unit can meet that test. HUD-code manufactured homes are built to a federal standard, not the North Carolina Residential Code, so they may not. Separately, G.S. 160D-910 says a city cannot zone manufactured homes out of its whole jurisdiction, but it may set appearance and dimensional rules. Local rules vary a lot: Raleigh allows a manufactured home as an ADU only up to 600 square feet and with roof pitch and wall height standards; Winston-Salem allows a Class A or B manufactured home; Fayetteville, Cary and Greensboro do not allow manufactured homes as ADUs.

Source: G.S. 160D-917(a) (S.L. 2026-59, sec. 44); G.S. 160D-910

Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.

North Carolina ADU rules, point by point

What state law says on each point, with its source. Where the state is silent, your city or county decides.

How many ADUs

At least one ADU for each single detached house, in residential zones that allow detached houses. A city may allow more. The ADU can be built at the same time as the house or later. Starts with permit applications filed on or after January 15, 2027, and only in covered cities.

Source: G.S. 160D-917(a), (h) (S.L. 2026-59, sec. 44(a), 44(d))

Approval path

A covered city cannot require an ADU to be placed in a conditional zoning district. That removes the rezoning and public hearing path some cities used. The law does not otherwise spell out the review process, so a city may still require a normal zoning and building permit.

Source: G.S. 160D-917(b)(2) (S.L. 2026-59, sec. 44)

Size

A covered city cannot set an ADU size cap below 800 square feet, and it cannot set one above 1,000 square feet. So the allowed cap sits between 800 and 1,000 square feet. A city may also require that the ADU be smaller than the main house, and the statute's own definition of an ADU says it has less total square footage than the main house.

Source: G.S. 160D-917(b)(6), (c)(3), (g) (S.L. 2026-59, sec. 44)

Owner living on site

Not addressed directly. The law does say a city cannot stop the main house and the ADU from both being used for long-term rental by separate households, which makes a strict owner-occupancy rule hard to enforce. Several large cities already dropped their own owner-occupancy rules, including Durham in 2012 and Greensboro in 2024.

Source: G.S. 160D-917(b)(1) (S.L. 2026-59, sec. 44)

Lot size

Not addressed by state law. Cities set their own lot size rules. Some have removed ADU lot minimums on their own, for example Cary dropped a 20,000 square foot minimum for detached ADUs in 2025.

Source: G.S. 160D-917 (no minimum lot size provision)

Setbacks

A covered city may require an ADU setback of 10 feet, or the setback it normally requires in that zoning district, whichever is less. A city may also require the ADU to sit to the side or rear of the main house.

Source: G.S. 160D-917(c)(1)-(2) (S.L. 2026-59, sec. 44)

Height

Not addressed by state law. Cities set ADU height limits. Examples that were verified: Raleigh 26 feet, Winston-Salem 25 feet for a detached ADU, Cary 35 feet in some districts and no taller than the main house in others.

Source: G.S. 160D-917 (no height provision)

Parking

A covered city cannot set a minimum parking requirement or any parking restriction for an ADU. That includes extra parking when an existing building is converted into an ADU.

Source: G.S. 160D-917(b)(3) (S.L. 2026-59, sec. 44)

Permit timeline

State law sets no permit deadline and no automatic approval of an application. There is a separate deadline on cities: a covered city must adopt ADU development regulations by July 1, 2027, and if it does not, ADUs are allowed in that city without any limitations.

Source: G.S. 160D-917; S.L. 2026-59, sec. 44(c)

Impact fees

A covered city cannot charge any fee for an ADU that is higher than the fee it charges to permit a similar single detached house. The law does not otherwise cap utility tap fees or impact fees.

Source: G.S. 160D-917(b)(5) (S.L. 2026-59, sec. 44)

Renting it out

A covered city cannot stop the main house and the ADU from both being used for long-term rental by separate households. Short-term rental is not addressed, so city short-term rental rules still apply. After an ADU is permitted, the lot cannot be split so that the ADU ends up on a different parcel from the main house.

Source: G.S. 160D-917(b)(1), (f) (S.L. 2026-59, sec. 44)

What changed recently

  1. Upcoming. Deadline for covered cities to adopt ADU development regulations. A city that misses it must allow ADUs without any limitations.

    Source: S.L. 2026-59, sec. 44(c)

  2. Upcoming. The requirement to allow at least one ADU takes effect and applies to permit applications filed on or after this date.

    Source: S.L. 2026-59, sec. 44(d)

  3. The Governor signed SB 445, the Regulatory Reform Act of 2026, as Session Law 2026-59. Section 44 creates North Carolina's first statewide ADU requirement, new G.S. 160D-917.

    Source: S.L. 2026-59 (SB 445)

  4. Cary's ACT 32 ADU amendments took effect. The Town removed the 20,000 square foot minimum lot size for a detached ADU, raised the size cap from 33 percent to 50 percent of the main home, and changed parking from one space per bedroom to one space per ADU.

    Source: Town of Cary ACT 32 legislative file

  5. Wilmington adopted ordinance LDC-7-424, rewriting Land Development Code Section 18-200 on accessory dwelling units.

    Source: City of Wilmington LDC-7-424 certified true copy

  6. Greensboro City Council approved an ADU text amendment. It removed the owner-occupancy rule, removed the extra parking space, removed the 'single-family appearance' standard, and raised the size limit to 50 percent of the main home.

    Source: City of Greensboro, Accessory Dwelling Units page

  7. Raleigh's Missing Middle 2.0 text change (TC-20-21, Ordinance (2022) 362 TC 466) took effect. It allows two ADUs on a lot in a Frequent Transit Area and one ADU on a townhouse lot.

    Source: City of Raleigh TC-20-21 ordinance

  8. Winston-Salem City Council approved UDO-CC15 (Ordinance 21-0667). A detached ADU no longer needs Special Use District rezoning with a public hearing, a minimum $1,000 fee and one added parking space. It is now a zoning permit from the Zoning Officer.

    Source: Winston-Salem UDO-CC15 ordinance text

  9. Raleigh's TC-16-19 (Ordinance 2020-117 TC 432) took effect. It removed the Accessory Dwelling Unit Overlay District, so a neighborhood no longer has to be mapped into an overlay before ADUs are allowed there.

    Source: City of Raleigh TC-16-19 ordinance

  10. Durham's Expanding Housing Choices text amendment (TC18-07) took effect in the City. It raised the ADU size cap, allowed ADUs on nonconforming lots, and allowed conversion of nonconforming accessory buildings.

    Source: Durham City-County Unified Development Ordinance, amendment table

North Carolina city records

Your city or county runs the permit counter. Here is what we verified for 8 places in North Carolina, and who to call.

Charlotte

A detached ADU can be no more than 50 percent of the floor area of the main home, and in no case more than 1,000 heated square feet. One ADU per lot, and the ADU and the main home must be under the same ownership.

Queen City ADU Program (applications closed October 31, 2025); MyADU eligibility tool at https://myadu.charlottenc.gov/

Housing and Neighborhood Services (permits through Mecklenburg County Code Enforcement)
(980) 314-2633 · Planning office website
Checked September 19, 2026

Raleigh

An ADU can be up to 800 square feet on a lot under 40,000 square feet, or 1,000 square feet on a larger lot. Maximum height is 26 feet, detached side and rear setbacks are 5 feet on smaller lots, and no extra parking is required.

ADU Fast Track Program and online plan gallery

Planning and Development
(919) 996-2500 · Planning office website
Checked September 19, 2026

Greensboro

An ADU's heated floor area cannot be more than 50 percent of the main home's floor area. There is no minimum size, and no extra off-street parking is required.

Planning Department (permits through Development Services)
(336) 373-2155 · Planning office website
Checked September 19, 2026

Durham

No off-street parking is required for an ADU in Durham, and an ADU can be up to 1,000 square feet on a single storey or 1,200 square feet in total.

ADU Pilot Program (Forever Home, Durham). Loans up to $80,000 at 2 percent fixed over 30 years, with a 30-year affordability restriction. All 20 homeowner slots are filled and applications are closed.

Planning and Development Department (joint City-County)
(919) 560-4137 · Planning office website
Checked September 19, 2026

Winston-Salem

A detached ADU is now approved by zoning permit from the Zoning Officer, with no City Council rezoning, no public hearing and no $1,000 fee. It can be 70 percent of the main structure's floor area up to 1,000 square feet, and 576 square feet is always allowed no matter how small the main house is.

Planning and Development Services (City-County Planning Board)
(336) 747-7040 · Planning office website
Checked September 19, 2026

Fayetteville

A Fayetteville ADU must be at least 300 and no more than 800 square feet, one per lot, placed inside or behind the main structure, with at least one and no more than two off-street parking spaces on top of what the main home already needs.

Planning and Zoning Division, Development Services
(910) 433-1612 · Planning office website
Checked September 19, 2026

Cary

A Cary ADU can be 50 percent of the main home's heated area up to 800 square feet, or up to 1,000 square feet if the lot is 40,000 square feet or larger. There is no minimum lot size and no minimum ADU size, but one extra parking space is required, so the property must fit three spaces.

Accessory Dwelling Unit Guide, a published step-by-step permitting and development guide for homeowners

Planning and Development Services (Town of Cary Housing)
(919) 469-4000 · Planning office website
Checked September 19, 2026

Wilmington

A Wilmington ADU is capped at 50 percent of the main structure's gross floor area or 1,200 square feet, whichever is less, and only one ADU is allowed per lot. It can be new construction, a conversion of an existing building, or an addition.

Planning and Development
(910) 254-0900 · Planning office website
Checked September 19, 2026

How PERCH fits

PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.

PERCH

  • Your modular home, built to order in the factory nearest you
  • Delivery to your land
  • The crew that sets the home on your foundation
  • Plan documents for your permit application

You

  • Your land
  • A licensed local contractor you hire for the site work
  • The foundation, water, sewer or septic, and power hookups
  • Your permits, using the documents we give you

Your site contractor's bid is the price for that work. PERCH does not perform site work.

Modular ADUs for North Carolina

Check your exact lot

Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.

Free. No obligation.

Questions, answered

Is there a statewide ADU law in North Carolina?

From January 2027, big NC cities must allow one ADU per house. North Carolina passed its first statewide ADU rule in August 2026. New G.S. 160D-917 says a covered city must allow at least one ADU for every single detached house in a residential zone that allows detached houses. The city cannot require a rezoning, cannot require parking, cannot charge extra fees, and cannot cap the ADU below 800 square feet. The rule does not start yet: it applies to permit applications filed on or after January 15, 2027.

Can a modular home be an ADU in North Carolina?

The new state section does not name modular homes, but it requires an ADU to conform to the North Carolina Residential Code. Modular (factory-built) homes in North Carolina are built to the state code and carry a State of North Carolina Modular Construction Validating Stamp, so a modular unit can meet that test. HUD-code manufactured homes are built to a federal standard, not the North Carolina Residential Code, so they may not. Separately, G.S. 160D-910 says a city cannot zone manufactured homes out of its whole jurisdiction, but it may set appearance and dimensional rules. Local rules vary a lot: Raleigh allows a manufactured home as an ADU only up to 600 square feet and with roof pitch and wall height standards; Winston-Salem allows a Class A or B manufactured home; Fayetteville, Cary and Greensboro do not allow manufactured homes as ADUs.

How big can an ADU be in North Carolina?

A covered city cannot set an ADU size cap below 800 square feet, and it cannot set one above 1,000 square feet. So the allowed cap sits between 800 and 1,000 square feet. A city may also require that the ADU be smaller than the main house, and the statute's own definition of an ADU says it has less total square footage than the main house.

Do I have to live on the property to have an ADU in North Carolina?

Not addressed directly. The law does say a city cannot stop the main house and the ADU from both being used for long-term rental by separate households, which makes a strict owner-occupancy rule hard to enforce. Several large cities already dropped their own owner-occupancy rules, including Durham in 2012 and Greensboro in 2024.

Can I rent out an ADU in North Carolina?

A covered city cannot stop the main house and the ADU from both being used for long-term rental by separate households. Short-term rental is not addressed, so city short-term rental rules still apply. After an ADU is permitted, the lot cannot be split so that the ADU ends up on a different parcel from the main house.

How long does an ADU permit take in North Carolina?

State law sets no permit deadline and no automatic approval of an application. There is a separate deadline on cities: a covered city must adopt ADU development regulations by July 1, 2027, and if it does not, ADUs are allowed in that city without any limitations.

Does PERCH do the site work?

No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.

Is this page legal advice?

No. It summarizes North Carolina state law as checked on September 19, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.