Statute summary, size caps, owner-occupancy rules, permit timelines, and a 4-question eligibility quiz. Part of the PERCH ADU Legality Index — one page per state, verified against real statute references and updated as laws change.
| Statute summary | New Mexico HB 105 (2024) required cities over 50,000 population to permit at least one ADU pathway by right. Albuquerque and Santa Fe lead adoption. |
|---|---|
| ADU allowed | Conditional — depends on jurisdiction |
| Size cap (sqft) | 900 |
| Owner-occupancy required | No |
| Permit timeline (days) | 45-115 |
| Statute citation | HB 105 (2024) |
| Last verified | 2026-07-17 |