ADU laws · Montana

Montana ADU Laws (2026): Can You Add a Modular ADU?

Montana cities must allow one ADU by right on single-home lots. State law is strong, but in cities the ADU is capped at 1,000 sq ft or 75% of the main home, and private HOA covenants can still ban ADUs because the law does not override them. Check your own lot before you plan.

Source: MCA 76-2-345(1)(a)

Updated Research checked

Statewide ADU law

Yes

MCA 76-2-345(1)(a)

Strength

Strong

State law makes covered cities allow at least one ADU under rules the state sets.

Factory-built hook

Zoning parity + Code preemption

State factory-built program

Research checked

September 12, 2026

Date our team last checked the sources.

What Montana law says about ADUs

The state rule

Montana cities must allow one ADU by right on single-home lots.

Source: MCA 76-2-345(1)(a)

Every Montana city or town that has zoning must let you build at least one ADU by right on a lot with a single-family home. The ADU can be attached, detached or inside the house. Cities cannot require extra parking, owner occupancy, matching design or impact fees, and cannot hold the ADU to stricter height, setback or lot size rules than the main home. Since October 2025 a similar rule also covers counties that have zoning.

Who the law covers

All incorporated cities, towns and consolidated city-counties that zone (MCA 76-2-345), with no population cutoff. Since October 1, 2025, also every county zoning district set up by a board of county commissioners (MCA 76-2-215). Unzoned rural land has no ADU zoning limits from these laws.

Statutes and documents behind this section
  • MCA 76-2-345 (2025)
  • MCA 76-2-215 (2025)
  • SB 532 (2025), Ch. 619 enrolled bill
  • MAID v. State, 2026 MT 53 (Mont. Mar. 17, 2026)

Can a modular ADU go on a Montana lot?

Factory-built hook Zoning parity + Code preemption · State factory-built program

The ADU laws do not name modular homes directly. An ADU must meet building code, and city zoning may not treat manufactured (HUD-code) or factory-built housing differently from other homes. Factory-built homes meet code through the state factory-built building program and insignia.

Source: MCA 76-2-302(3)-(4); MCA 76-2-345(9)(a)

Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.

Montana ADU rules, point by point

What state law says on each point, with its source. Where the state is silent, your city or county decides.

How many ADUs

At least 1 ADU by right on a lot with a single-family home, in cities, towns and zoned counties. Cities may choose to allow more.

Source: MCA 76-2-345(1)(a), (8); MCA 76-2-215(1)(a), (8)

Approval path

By right. No public hearing, variance, conditional use permit or other discretionary review. The only check is whether the site plan meets the zoning rules. Normal building permits still apply.

Source: MCA 76-2-345(9)(b), (6)

Size

In cities, a detached or attached ADU may be up to 75% of the main home's interior living area or 1,000 sq ft, whichever is less. So a city must allow up to 1,000 sq ft only when the main home is at least about 1,334 sq ft. An internal ADU is not covered by that cap. Cities may adopt looser rules. The county law (76-2-215) sets no size cap. In both laws the ADU must sit on a lot with a single-family home of greater square footage.

Source: MCA 76-2-345(1)(c), (8), (9)(a), (9)(c)

Owner living on site

state bans the requirement (cities and zoned counties)

Source: MCA 76-2-345(2)(c); MCA 76-2-215(2)(b)

Lot size

Cities and zoned counties cannot set a minimum lot size for an ADU that is stricter than the one for the single-family home on the lot.

Source: MCA 76-2-345(2)(g); MCA 76-2-215(2)(f)

Setbacks

Setbacks, lot coverage and frontage rules for an ADU cannot be stricter than those for the main home.

Source: MCA 76-2-345(2)(g); MCA 76-2-215(2)(f)

Height

The maximum height for an ADU cannot be stricter than for the main home.

Source: MCA 76-2-345(2)(g); MCA 76-2-215(2)(f)

Parking

Cities cannot require extra parking or fees in place of parking for an ADU. The county law does not include this ban, so zoned counties may still require parking.

Source: MCA 76-2-345(2)(a); compare MCA 76-2-215(2)

Permit timeline

The state sets no day count for city ADU approval; it only requires by-right review. For counties, a 15-day expedited state sanitation (DEQ) review is available when the ADU is added to a parcel with public water and sewer that has capacity. That provision ends September 30, 2029.

Source: MCA 76-2-215(7); SB 532 (2025) sec. 2 and 4 (MCA 76-4-130)

Impact fees

Impact fees on ADU construction are banned in cities and zoned counties. A one-time ADU application review fee of up to $250 is allowed, plus normal building permit fees. Cities may require will-serve letters from city water and sewer.

Source: MCA 76-2-345(2)(e), (4), (7); MCA 76-2-215(2)(d), (4)

Renting it out

Long-term renting is allowed; the state bans owner-occupancy rules and rules about how occupants are related. Cities and counties may still regulate short-term rentals.

Source: MCA 76-2-345(2)(c), (2)(d), (3)

What changed recently

  1. The Montana Supreme Court unanimously upheld the 2023 housing laws, including the city ADU law, against a constitutional challenge. A December 2023 lower-court injunction had already been reversed in 2024.

    Source: MAID v. State, 2026 MT 53

  2. County ADU law (SB 532, 2025) took effect, adding by-right ADUs in zoned counties and a 15-day expedited sanitation review.

    Source: MCA 76-2-215; MCA 1-2-201 (Oct. 1 default effective date)

  3. City ADU law (SB 528, 2023) took full effect. City rules that conflict with it became void, and cities without updated rules had to follow the state law directly.

    Source: MCA 76-2-345(5)

Montana city records

Your city or county runs the permit counter. Here is what we verified for 7 places in Montana, and who to call.

Billings

Billings allows one ADU in its N1, N2 and N3 zones. A detached ADU can be up to 75% of the main home's floor area or 1,000 sq ft, and an attached ADU up to 80% or 1,000 sq ft, whichever is less. Every ADU needs a building permit first.

City/County Planning Division
(406) 657-8247 · Planning office website
Checked September 12, 2026

Missoula

Missoula Water does not require a separate water meter for an ADU if its water line connects after the main home's meter. The line must have enough capacity.

Project Review Team (PRT) meeting, a one-hour meeting with planning, engineering and building staff

Current Planning and Land Use (Zoning Desk)
(406) 552-6625 · Planning office website
Checked September 12, 2026

Great Falls

Great Falls says ADUs on lots with a single-family home are permitted by right under state law, and duplexes are also allowed wherever single-family homes are allowed. ADUs must still meet building and engineering rules.

Planning & Community Development
(406) 771-1180 · Planning office website
Checked September 12, 2026

Bozeman

Bozeman planning questions emailed to PlanningTech@bozemanmt.gov go to the Planner of the Day. The front counter at 20 East Olive St. is open Mon, Wed, Fri 9am to 4pm and Tue, Thu 9am to 1pm.

Community Development, Planning Division
(406) 582-2260 ext. 2 · Planning office website
Checked September 12, 2026

Butte

Butte-Silver Bow is rewriting its zoning ordinance. A Planning Board vote to recommend it to the Council of Commissioners is set for September 24, 2026.

Butte-Silver Bow Planning Department
(406) 497-6200 · Planning office website
Checked September 12, 2026

Helena

Helena takes permit applications online through its Civic Access permit system, linked from the Planning Division page.

Community Development, Planning Division
(406) 447-8490 · Planning office website
Checked September 12, 2026

Kalispell

Kalispell's zoning code allows a second home on any lot where a single-family home is allowed. A separate ADU can have up to 1,000 sq ft of living space, and it cannot be rented for less than 30 days.

Development Services, Planning
(406) 758-7940 · Planning office website
Checked September 12, 2026

How PERCH fits

PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.

PERCH

  • Your modular home, built to order in the factory nearest you
  • Delivery to your land
  • The crew that sets the home on your foundation
  • Plan documents for your permit application

You

  • Your land
  • A licensed local contractor you hire for the site work
  • The foundation, water, sewer or septic, and power hookups
  • Your permits, using the documents we give you

Your site contractor's bid is the price for that work. PERCH does not perform site work.

Modular ADUs for Montana

Check your exact lot

Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.

Free. No obligation.

Questions, answered

Is there a statewide ADU law in Montana?

Montana cities must allow one ADU by right on single-home lots. Every Montana city or town that has zoning must let you build at least one ADU by right on a lot with a single-family home. The ADU can be attached, detached or inside the house. Cities cannot require extra parking, owner occupancy, matching design or impact fees, and cannot hold the ADU to stricter height, setback or lot size rules than the main home. Since October 2025 a similar rule also covers counties that have zoning.

Can a modular home be an ADU in Montana?

The ADU laws do not name modular homes directly. An ADU must meet building code, and city zoning may not treat manufactured (HUD-code) or factory-built housing differently from other homes. Factory-built homes meet code through the state factory-built building program and insignia.

How big can an ADU be in Montana?

In cities, a detached or attached ADU may be up to 75% of the main home's interior living area or 1,000 sq ft, whichever is less. So a city must allow up to 1,000 sq ft only when the main home is at least about 1,334 sq ft. An internal ADU is not covered by that cap. Cities may adopt looser rules. The county law (76-2-215) sets no size cap. In both laws the ADU must sit on a lot with a single-family home of greater square footage.

Do I have to live on the property to have an ADU in Montana?

state bans the requirement (cities and zoned counties)

Can I rent out an ADU in Montana?

Long-term renting is allowed; the state bans owner-occupancy rules and rules about how occupants are related. Cities and counties may still regulate short-term rentals.

How long does an ADU permit take in Montana?

The state sets no day count for city ADU approval; it only requires by-right review. For counties, a 15-day expedited state sanitation (DEQ) review is available when the ADU is added to a parcel with public water and sewer that has capacity. That provision ends September 30, 2029.

Does PERCH do the site work?

No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.

Is this page legal advice?

No. It summarizes Montana state law as checked on September 12, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.