ADU laws · Michigan

Michigan ADU Laws (2026): Can You Add a Modular ADU?

No statewide ADU law yet: each Michigan city writes its own rules. In Michigan, whether you can add an ADU depends on your city or township's zoning code, so check your local rules first; a statewide bill is pending but not law.

Source: HB 5585 (2026), pending in committee

Updated Research checked

Strength

None

There is no statewide ADU law. Each city or county decides.

Factory-built hook

Code preemption

State certificate

Research checked

September 12, 2026

Date our team last checked the sources.

What Michigan law says about ADUs

The state rule

No statewide ADU law yet: each Michigan city writes its own rules.

Source: HB 5585 (2026), pending in committee

Michigan has no statewide ADU law. Each city, village and township decides in its own zoning code whether ADUs are allowed, and what size, parking and owner rules apply. A 2026 bill (HB 5585) would make ADUs a by-right use statewide, but it is still in committee.

Who the law covers

No statewide rule. Zoning is set locally under the Michigan Zoning Enabling Act (2006 PA 110), which has no ADU section today.

Statutes and documents behind this section
  • HB 5585 (2026), pending in House Government Operations committee
  • HB 5585 as introduced (bill text)
  • House Fiscal Agency analysis of HB 5581-5585 (5-13-26)

Can a modular ADU go on a Michigan lot?

Factory-built hook Code preemption · State certificate

No ADU-specific state rule. Two general state laws help factory-built homes: (1) a premanufactured (modular) unit with a state certificate of acceptability must get a building permit if the rest of the application meets zoning and local rules, and at install it faces only nondestructive checks for transit or install damage (MCL 125.1519(7)-(8)); (2) a local ordinance shall not be designed to exclude mobile homes generally (MCL 125.2307(3)). Local zoning can still set looks and size rules; Lansing, for example, applies a 20-foot minimum width and roof pitch rules to dwellings, including premanufactured units.

Source: MCL 125.1519; MCL 125.2307(3)

Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.

Michigan ADU rules, point by point

What state law says on each point, with its source. Where the state is silent, your city or county decides.

How many ADUs

Not set by state law. Each local zoning code decides. Pending bill HB 5585 (2026) would change this if passed; it had not passed as of 2026-09-12.

Source: HB 5585 (2026), pending in House Government Operations committee

Approval path

Not set by state law. Some cities (for example Grand Rapids since 2024) allow ADUs by right; others require special approval or do not allow them. Pending bill HB 5585 (2026) would change this if passed; it had not passed as of 2026-09-12.

Source: HB 5585 (2026), pending in House Government Operations committee

Size

No state size rule. Local caps vary (Grand Rapids: 850 sq ft and no more than 40% of the house; Lansing: tied to lot size, 720 to 1,200 sq ft). HB 5585 would protect ADUs up to the smaller of 800 sq ft or 75% of the house, but it is pending.

Source: HB 5585 (2026) text, proposed MCL 125.3516(1)(a)

Owner living on site

not addressed. Cities may require it (Lansing requires the house or the ADU to be owner-occupied; Grand Rapids removed its rule in 2024). Pending bill HB 5585 (2026) would change this if passed; it had not passed as of 2026-09-12.

Source: HB 5585 (2026), pending in House Government Operations committee

Lot size
Setbacks

Not set by state law. Local rule. HB 5585 would protect ADUs set back at least 5 ft from side and rear lines (pending).

Source: HB 5585 (2026), pending in House Government Operations committee

Height
Parking

Not set by state law. Local rule. HB 5585 would ban ADU parking requirements (pending).

Source: HB 5585 (2026), pending in House Government Operations committee

Permit timeline

No ADU-specific state deadline. Local review times vary. For a premanufactured unit with a state certificate of acceptability, MCL 125.1519(7) says the local enforcing agency shall issue the building permit within the time set in the construction code act if the rest of the application complies with zoning and local rules.

Source: MCL 125.1519(7)

Impact fees

No ADU-specific state rule found. Local permit and utility connection fees apply.

Source: HB 5585 (2026), pending in House Government Operations committee

Renting it out

No statewide ADU rental rule. Cities set their own short-term rental limits (Grand Rapids and Lansing both regulate ADU rentals locally).

Source: HB 5585 (2026), pending in House Government Operations committee

What changed recently

  1. HB 6083 and HB 6085 introduced (ADU windows; ADU sewer hookup). Still in committee; not law.

    Source: HB 6085 (2026) bill history

  2. HB 5585 introduced to make ADUs a by-right use statewide. Still in committee; not law.

    Source: HB 5585 (2026) bill history

  3. Local, not state: Lansing's ADU zoning amendment took effect, allowing one detached ADU on lots with a single-family home in five districts.

    Source: Lansing FBC ADU Amendment Infosheet

Michigan city records

Your city or county runs the permit counter. Here is what we verified for 6 places in Michigan, and who to call.

Detroit

A proposed zoning change, "Let's Build More Housing, Detroit," would allow one detached ADU (up to the smaller of 1,200 sq ft or 60% of the house) in R2 to R6 districts. The City Planning Commission approved it on 10/16/2025, but City Council had not adopted it; the city page says it is before Council.

Planning and Development Department
(313) 224-1339 · Planning office website
Checked September 12, 2026

Grand Rapids

An ADU can be no larger than 850 sq ft and no more than 40% of the main house's gross floor area. ADUs cannot be rented for less than 30 days, and a leased ADU must be registered as a rental.

Development Center (Planning Department)
(616) 456-4100 · Planning office website
Checked September 12, 2026

Warren

Warren's Building Division enforces both the building codes and the zoning ordinance, and residents can apply for permits and schedule inspections online.

Building Division / Zoning
(586) 574-4504 · Planning office website
Checked September 12, 2026

Sterling Heights

The city's 2025 Master Land Use Plan says it adds accessory dwellings and duplexes throughout the city as a housing strategy. A master plan guides future zoning; it is not itself a zoning rule.

Office of Planning
(586) 446-2360 · Planning office website
Checked September 12, 2026

Ann Arbor

Changes adopted in 2021 allow newly built detached ADUs (not just conversions of existing buildings), and the city says there are no neighborhood notification requirements for a new ADU.

ADU Guidebook and interactive ADU map

Planning Services
(734) 794-6265 · Planning office website
Checked September 12, 2026

Lansing

Since 6/5/2025, one detached ADU is allowed on lots with a single-family home in the R-1, R-2, R-3, R-MX and DT-1 districts. The ADU can have at most 2 bedrooms, and either the house or the ADU must be owner-occupied.

Planning Office
(517) 483-4066 · Planning office website
Checked September 12, 2026

How PERCH fits

PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.

PERCH

  • Your modular home, built to order in the factory nearest you
  • Delivery to your land
  • The crew that sets the home on your foundation
  • Plan documents for your permit application

You

  • Your land
  • A licensed local contractor you hire for the site work
  • The foundation, water, sewer or septic, and power hookups
  • Your permits, using the documents we give you

Your site contractor's bid is the price for that work. PERCH does not perform site work.

Modular ADUs for Michigan

Check your exact lot

Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.

Free. No obligation.

Questions, answered

Is there a statewide ADU law in Michigan?

No statewide ADU law yet: each Michigan city writes its own rules. Michigan has no statewide ADU law. Each city, village and township decides in its own zoning code whether ADUs are allowed, and what size, parking and owner rules apply. A 2026 bill (HB 5585) would make ADUs a by-right use statewide, but it is still in committee.

Can a modular home be an ADU in Michigan?

No ADU-specific state rule. Two general state laws help factory-built homes: (1) a premanufactured (modular) unit with a state certificate of acceptability must get a building permit if the rest of the application meets zoning and local rules, and at install it faces only nondestructive checks for transit or install damage (MCL 125.1519(7)-(8)); (2) a local ordinance shall not be designed to exclude mobile homes generally (MCL 125.2307(3)). Local zoning can still set looks and size rules; Lansing, for example, applies a 20-foot minimum width and roof pitch rules to dwellings, including premanufactured units.

How big can an ADU be in Michigan?

No state size rule. Local caps vary (Grand Rapids: 850 sq ft and no more than 40% of the house; Lansing: tied to lot size, 720 to 1,200 sq ft). HB 5585 would protect ADUs up to the smaller of 800 sq ft or 75% of the house, but it is pending.

Do I have to live on the property to have an ADU in Michigan?

not addressed. Cities may require it (Lansing requires the house or the ADU to be owner-occupied; Grand Rapids removed its rule in 2024). Pending bill HB 5585 (2026) would change this if passed; it had not passed as of 2026-09-12.

Can I rent out an ADU in Michigan?

No statewide ADU rental rule. Cities set their own short-term rental limits (Grand Rapids and Lansing both regulate ADU rentals locally).

How long does an ADU permit take in Michigan?

No ADU-specific state deadline. Local review times vary. For a premanufactured unit with a state certificate of acceptability, MCL 125.1519(7) says the local enforcing agency shall issue the building permit within the time set in the construction code act if the rest of the application complies with zoning and local rules.

Does PERCH do the site work?

No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.

Is this page legal advice?

No. It summarizes Michigan state law as checked on September 12, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.