ADU laws · Massachusetts

Massachusetts ADU Laws (2026): Can You Add a Modular ADU?

ADUs up to 900 square feet are allowed by right statewide. Massachusetts has one of the strongest ADU laws in the country, and it is already in force. The ADU can be up to 900 square feet, or half the floor area of the main home, whichever is smaller. Check your own lot before you plan.

Source: M.G.L. c. 40A, s. 1A and s. 3, para. 11 (St. 2024, c. 150, ss. 7-8)

Updated Research checked

Strength

Strong

State law makes covered cities allow at least one ADU under rules the state sets.

Research checked

September 19, 2026

Date our team last checked the sources.

What Massachusetts law says about ADUs

The state rule

ADUs up to 900 square feet are allowed by right statewide.

Source: M.G.L. c. 40A, s. 1A and s. 3, para. 11 (St. 2024, c. 150, ss. 7-8)

Massachusetts has one of the strongest ADU laws in the country, and it is already in force. Since February 2, 2025, a city or town cannot ban an ADU, cannot unreasonably restrict one, and cannot make you get a special permit or any other discretionary zoning approval for a single ADU in a zoning district that allows single-family homes. The ADU can be up to 900 square feet, or half the floor area of the main home, whichever is smaller. The town cannot make you live on the property, cannot set a minimum lot size, and cannot require any parking if the lot is within half a mile of a transit station.

Who the law covers

Every city and town in Massachusetts that is subject to the Zoning Act, M.G.L. c. 40A. EOHLC states that is 350 of the 351 municipalities. The City of Boston is the one exception, because Boston is not governed by c. 40A and runs its own zoning code. The protection reaches any zoning district where a single-family home is allowed, either as of right or by special permit, so it is not limited to districts zoned only for single-family homes. It also reaches lots that already hold a two-family or three-family home. Only one ADU per lot gets the protection; a town may allow more but must require a special permit for the extras.

Statutes and documents behind this section
  • St. 2024, c. 150, sections 7 and 8 (full text published by EOHLC)
  • 760 CMR 71.00: Protected Use Accessory Dwelling Units (effective 1/31/2025, Mass. Register #1540)
  • 760 CMR 71.00 regulation landing page, Trial Court Law Libraries
  • EOHLC Accessory Dwelling Units program page
  • EOHLC Accessory Dwelling Unit (ADU) FAQs, updated September 17, 2026

Can a modular ADU go on a Massachusetts lot?

Factory-built hook Names it · State ADU regulation names modular units

Yes, and this is written into the regulations. 760 CMR 71.03(3)(b)(7) says any local rule that prohibits, regulates or restricts a Modular Dwelling Unit from being used as a protected ADU is unreasonable if it is more restrictive than the state Building Code. A Modular Dwelling Unit is defined in 760 CMR 71.02 as a pre-designed dwelling unit assembled and fitted with its plumbing, electrical and similar systems before it is moved to the site, then set on a foundation and connected to utilities. EOHLC adds that this can cover modular homes, manufactured housing and other prefabricated homes, decided case by case, and that a town may not ban foundation types the state Building Code allows. So a Massachusetts city or town cannot tell you no simply because the home was built in a factory.

Source: 760 CMR 71.02 (Modular Dwelling Unit), 71.03(3)(b)(7); EOHLC ADU FAQs

Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.

Massachusetts ADU rules, point by point

What state law says on each point, with its source. Where the state is silent, your city or county decides.

How many ADUs

One ADU per lot is protected by state law and must be allowed without a special permit. A city or town may choose to allow more than one, but state rules say any ADU beyond the first must go through a special permit. The protection does not depend on the main home being a single-family house: a lot with a two-family or three-family home in a qualifying district also gets one protected ADU. Where a lot has more than one main home, only one protected ADU is allowed on the whole lot.

Source: M.G.L. c. 40A, s. 3, para. 11 (St. 2024, c. 150, s. 8); 760 CMR 71.02 (definition of Protected Use ADU), 71.03(5)

Approval path

By right. No zoning ordinance or by-law may prohibit, unreasonably restrict, or require a special permit or other discretionary zoning approval for a single ADU, or for renting it, in a district that allows single-family homes. The regulations go further and bar a town from requiring a waiver, variance or any other zoning relief. Two narrow exceptions: a town may require a special permit for extra ADUs beyond the first, and it may require one in a floodplain or aquifer protection overlay if it already requires one for the main home and the test is clear, objective and non-discretionary. A town may still run site plan review, but the review has to be clear and objective and cannot impose terms that conflict with an as-of-right process. You still need a building permit.

Source: M.G.L. c. 40A, s. 3, para. 11; 760 CMR 71.03(1), 71.03(3)(b)(5), 71.03(5), 71.03(6)

Size

The protected ADU is capped at 900 square feet of gross floor area, or half the gross floor area of the main home, whichever is SMALLER. So a 900 square foot ADU only works if the main home is at least 1,800 square feet. A city or town cannot cap a protected ADU below 900 square feet, but it is free to allow bigger ones, and several have. Gross floor area is defined in the regulations: it is the sum of all stories of code-compliant ceiling height, including basements, lofts and intermediate floored tiers, but not crawl spaces, garage parking areas, attics or enclosed porches. EOHLC says a basement counts even if it is unfinished, as long as the ceiling height meets code. Where a lot has more than one main home, the largest one sets the size test.

Source: M.G.L. c. 40A, s. 1A (St. 2024, c. 150, s. 7); 760 CMR 71.02 (Accessory Dwelling Unit, Gross Floor Area); EOHLC ADU FAQs

Owner living on site

State law bans the requirement. The statute says the use of land or structures for a protected ADU shall not require owner occupancy of either the ADU or the main home. The regulations list owner-occupancy requirements as a Prohibited Regulation. Towns also cannot limit who lives in the unit based on income, age, family relationship or school enrollment, and cannot cap the number of people beyond what state code requires. Note: Boston is outside this law and does require the owner to live on the parcel.

Source: M.G.L. c. 40A, s. 3, para. 11; 760 CMR 71.03(2)(a), 71.03(2)(c), 71.02 (Use and Occupancy Restrictions)

Lot size

A town may not require a minimum lot size for a protected ADU. It also cannot apply unit caps, quotas or density limits, and a protected ADU is not counted in any density calculation. EOHLC says floor area ratio rules and other lot-area-based limits are barred too, and the Attorney General's Municipal Law Unit has struck floor area ratio requirements from town by-laws on that basis.

Source: 760 CMR 71.03(2)(d), 71.03(3)(b)(2); EOHLC ADU FAQs

Setbacks

A town may set setbacks, lot coverage, open space, bulk, height and number of stories, but the standard applied to the ADU cannot be more restrictive than whichever is most permissive among: the rule for the main home, the rule for a single-family home, or the rule for an accessory structure in that district. On top of that, the rule still has to pass the reasonableness test in 760 CMR 71.03(3)(a). Historic districts are treated differently: a town may apply stricter design and dimensional standards inside a c. 40C historic district, as long as they are still reasonable.

Source: M.G.L. c. 40A, s. 3, para. 11; 760 CMR 71.03(3)(b)(2), 71.03(3)(b)(8)

Height

No single statewide number. Height, bulk and number of stories are set by the town, but the standard cannot be stricter than the most permissive of the main home, a single-family home, or an accessory structure standard in that district, and it must still be reasonable under 760 CMR 71.03(3)(a). In practice that means a two-storey ADU is possible where the district already allows two storeys for one of those three comparisons. Check the specific district before planning a two-storey unit.

Source: 760 CMR 71.03(3)(b)(2)

Parking

No parking at all may be required if any part of the lot sits within a half-mile radius of a transit station. Outside that radius, a town may require at most one extra space. A transit station means a subway station on the MBTA Red, Green, Orange, Silver or Blue Line, a year-round commuter rail station run by a transit authority, a year-round ferry terminal, or a bus station. EOHLC has said a bus station means a regular, specific pick-up and drop-off point, so a flag stop does not count.

Source: M.G.L. c. 40A, s. 3, para. 11; 760 CMR 71.03(2)(b), 71.02 (Transit Station, Bus Station, Subway Station, Commuter Rail Station, Ferry Terminal)

Permit timeline

State ADU law sets no permit deadline and no automatic approval. Because a protected ADU is by right, there is no special permit hearing to schedule, which is the step that usually adds months. If a town runs site plan review, the review has to be clear and objective. If a permit is denied, the appeal routes are the normal ones under M.G.L. c. 40A. EOHLC says it cannot review individual denials.

Source: M.G.L. c. 40A, s. 3, para. 11; 760 CMR 71.03(3)(b)(5); EOHLC ADU FAQs

Impact fees

A town cannot require an impact analysis, study, report or impact fee for a protected ADU unless it requires the same thing for a single-family home in that district. Ordinary fees such as building permit fees, site plan review fees and utility connection fees are allowed, but EOHLC says each one has to pass the reasonableness test in 760 CMR 71.03(3).

Source: 760 CMR 71.03(3)(b)(6), 71.03(3)(a); EOHLC ADU FAQs

Renting it out

Long-term rental is protected. The statute bars a town from prohibiting or unreasonably restricting the use of an ADU or the rental of it, and it bars owner-occupancy rules, so you can rent the ADU or the main home. Short-term rental is the exception: a town may restrict or ban short-term rental of an ADU. Short-term rental uses the definition in M.G.L. c. 64G, section 1, which EOHLC explains covers stays of no more than 31 consecutive days, so a month-to-month lease or a tenancy at will is not a short-term rental. Selling the ADU as a separate condominium is governed by M.G.L. c. 183A, which the ADU law did not change.

Source: M.G.L. c. 40A, s. 1A and s. 3, para. 11; 760 CMR 71.03(3)(c); EOHLC ADU FAQs

What changed recently

  1. EOHLC published an advisory on 2026 amendments to M.G.L. c. 40A sections 5, 6, 10 and 11, made by outside sections 40 to 49 of Chapter 137 of the Acts of 2026. These cover zoning notice, nonconforming lots and variances. They do not change the ADU paragraph.

    Source: EOHLC, Important Changes to M.G.L. c. 40A

  2. In progress. EOHLC opened public comment on proposed revisions to 760 CMR 71.00. The comment period runs through 11:59 p.m. on October 9, 2026. A redline of the draft is published. The final shape of any change is not yet known, so the rules on this page are the ones in force today.

    Source: EOHLC Accessory Dwelling Units page, 2026 ADU Draft Regulations and Public Comment

  3. The Healey-Driscoll administration launched Phase One of the statewide ADU Incentive Program, run by the Massachusetts Housing Partnership, paying for professional feasibility studies. The administration committed 10 million dollars over two years to MHP's statewide ADU work.

    Source: Governor Healey Launches Statewide Program to Help Homeowners Build Accessory Dwelling Units

  4. EOHLC published the statewide ADU Tracker, with municipality-level counts of ADU applications and approvals. It was last updated August 12, 2026.

    Source: EOHLC Accessory Dwelling Unit Tracker

  5. EOHLC, with the Metropolitan Area Planning Council and the Massachusetts Housing Partnership, published ADU Model Zoning version 1.2, plus a checklist cities and towns can use to audit their own rules.

    Source: EOHLC ADU Model Zoning v1.2

  6. The ADU law took effect. From this date any local zoning that conflicts with the ADU law or the ADU regulations is unenforceable, whether or not the town has updated its own by-law yet.

    Source: EOHLC ADU FAQs

  7. 760 CMR 71.00, the Protected Use Accessory Dwelling Units regulations, took effect when published in the Massachusetts Register (issue 1540).

    Source: 760 CMR 71.00 regulation page, Trial Court Law Libraries

  8. Governor Healey signed the Affordable Homes Act, Chapter 150 of the Acts of 2024. Sections 7 and 8 created the statewide ADU right.

    Source: EOHLC, ADU Law - Acts of 2024, Chapter 150, Section 7 and 8

Massachusetts city records

Your city or county runs the permit counter. Here is what we verified for 8 places in Massachusetts, and who to call.

Boston

Boston is the one Massachusetts city the statewide ADU law does not reach, and Boston does require you to live on the parcel. The city's ADU path is open to owners of 1, 2 and 3 family homes, and some projects need Zoning Board of Appeal review before a building permit is issued. Boston reported 118 ADU applications and 49 approvals to the state between January 2025 and June 2026.

Boston ADU program: ADU Financial Assistance Program for income-eligible homeowners, a published ADU Guidebook, a free monthly ADU Design Workshop and a free monthly ADU Budget Workshop, plus a dedicated ADU team at ADU@boston.gov

Mayor's Office of Housing (building permits through the Inspectional Services Department)
617-635-3880 · Planning office website
Checked September 19, 2026

Worcester

Worcester ordained its local ADU rules on January 13, 2026. One ADU is allowed per property, on any property with at least one lawful residential unit, in every zoning district. The cap is 900 square feet, no extra parking is required, and the owner does not have to live on the property. The ADU generally cannot sit in the front yard, and short-term rental of it is not allowed.

City ADU information page with a step-by-step process and permitting through the OpenGov portal

Division of Planning and Regulatory Services
508-799-1400 · Planning office website
Checked September 19, 2026

Springfield

Springfield publishes no ADU page of its own, so the statewide rule is what governs: one ADU by right, up to 900 square feet or half the main home, whichever is smaller. Springfield reported 7 ADU applications and 6 approvals to the state between January 2025 and June 2026.

Office of Planning and Economic Development
(413) 787-6020 · Planning office website
Checked September 19, 2026

Cambridge

Cambridge is one of the best places in the state for the parking rule. The state bars any parking requirement for an ADU on a lot within half a mile of a subway, commuter rail, ferry or bus station, and most of Cambridge sits inside that radius of an MBTA Red Line station. Cambridge reported 8 ADU applications and 6 approvals to the state between January 2025 and June 2026.

Community Development Department, Zoning and Development
617-349-4600 · Planning office website
Checked September 19, 2026

Lowell

Lowell had the cleanest approval record of the eight cities checked: every one of its 53 ADU applications between January 2025 and June 2026 was approved, 53 out of 53, and 9 units had already received a certificate of occupancy.

Department of Planning and Development
978-674-4252 · Planning office website
Checked September 19, 2026

Brockton

Brockton leaned toward backyard cottages more than most: of its 29 ADU applications between January 2025 and June 2026, 15 were for detached units, and 9 Brockton ADUs had already received a certificate of occupancy.

Department of Planning and Economic Development
(508) 580-7113 · Planning office website
Checked September 19, 2026

Quincy

Quincy homeowners leaned strongly toward attached and interior ADUs: 22 of the city's 29 applications between January 2025 and June 2026 were attached rather than detached. Quincy sits on the MBTA Red Line, and the state bars any parking requirement for an ADU on a lot within half a mile of a subway station.

Department of Planning and Community Development
(617) 376-1362 · Planning office website
Checked September 19, 2026

New Bedford

The Office of City Planning runs site plan review and staffs the Planning Board and Zoning Board of Appeals, and it takes application fees in person at its office. It warns that it will never ask for application fees by email, after a scam sent fake invoices to applicants. New Bedford reported 16 ADU applications and 11 approvals to the state between January 2025 and June 2026.

Office of City Planning
(508) 979-1488 · Planning office website
Checked September 19, 2026

How PERCH fits

PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.

PERCH

  • Your modular home, built to order in the factory nearest you
  • Delivery to your land
  • The crew that sets the home on your foundation
  • Plan documents for your permit application

You

  • Your land
  • A licensed local contractor you hire for the site work
  • The foundation, water, sewer or septic, and power hookups
  • Your permits, using the documents we give you

Your site contractor's bid is the price for that work. PERCH does not perform site work.

Modular ADUs for Massachusetts

Check your exact lot

Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.

Free. No obligation.

Questions, answered

Is there a statewide ADU law in Massachusetts?

ADUs up to 900 square feet are allowed by right statewide. Massachusetts has one of the strongest ADU laws in the country, and it is already in force. Since February 2, 2025, a city or town cannot ban an ADU, cannot unreasonably restrict one, and cannot make you get a special permit or any other discretionary zoning approval for a single ADU in a zoning district that allows single-family homes. The ADU can be up to 900 square feet, or half the floor area of the main home, whichever is smaller. The town cannot make you live on the property, cannot set a minimum lot size, and cannot require any parking if the lot is within half a mile of a transit station.

Can a modular home be an ADU in Massachusetts?

Yes, and this is written into the regulations. 760 CMR 71.03(3)(b)(7) says any local rule that prohibits, regulates or restricts a Modular Dwelling Unit from being used as a protected ADU is unreasonable if it is more restrictive than the state Building Code. A Modular Dwelling Unit is defined in 760 CMR 71.02 as a pre-designed dwelling unit assembled and fitted with its plumbing, electrical and similar systems before it is moved to the site, then set on a foundation and connected to utilities. EOHLC adds that this can cover modular homes, manufactured housing and other prefabricated homes, decided case by case, and that a town may not ban foundation types the state Building Code allows. So a Massachusetts city or town cannot tell you no simply because the home was built in a factory.

How big can an ADU be in Massachusetts?

The protected ADU is capped at 900 square feet of gross floor area, or half the gross floor area of the main home, whichever is SMALLER. So a 900 square foot ADU only works if the main home is at least 1,800 square feet. A city or town cannot cap a protected ADU below 900 square feet, but it is free to allow bigger ones, and several have. Gross floor area is defined in the regulations: it is the sum of all stories of code-compliant ceiling height, including basements, lofts and intermediate floored tiers, but not crawl spaces, garage parking areas, attics or enclosed porches. EOHLC says a basement counts even if it is unfinished, as long as the ceiling height meets code. Where a lot has more than one main home, the largest one sets the size test.

Do I have to live on the property to have an ADU in Massachusetts?

State law bans the requirement. The statute says the use of land or structures for a protected ADU shall not require owner occupancy of either the ADU or the main home. The regulations list owner-occupancy requirements as a Prohibited Regulation. Towns also cannot limit who lives in the unit based on income, age, family relationship or school enrollment, and cannot cap the number of people beyond what state code requires. Note: Boston is outside this law and does require the owner to live on the parcel.

Can I rent out an ADU in Massachusetts?

Long-term rental is protected. The statute bars a town from prohibiting or unreasonably restricting the use of an ADU or the rental of it, and it bars owner-occupancy rules, so you can rent the ADU or the main home. Short-term rental is the exception: a town may restrict or ban short-term rental of an ADU. Short-term rental uses the definition in M.G.L. c. 64G, section 1, which EOHLC explains covers stays of no more than 31 consecutive days, so a month-to-month lease or a tenancy at will is not a short-term rental. Selling the ADU as a separate condominium is governed by M.G.L. c. 183A, which the ADU law did not change.

How long does an ADU permit take in Massachusetts?

State ADU law sets no permit deadline and no automatic approval. Because a protected ADU is by right, there is no special permit hearing to schedule, which is the step that usually adds months. If a town runs site plan review, the review has to be clear and objective. If a permit is denied, the appeal routes are the normal ones under M.G.L. c. 40A. EOHLC says it cannot review individual denials.

Does PERCH do the site work?

No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.

Is this page legal advice?

No. It summarizes Massachusetts state law as checked on September 19, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.