Baltimore
Housing and Community Development permits are processed online through the E-Permits system, or at the kiosk at 417 E Fayette St.
ADU laws · Maryland
Maryland counties and cities must allow ADUs by October 1, 2026. State law sets a floor, but each county and city writes its own ADU rules, so size caps, parking, owner-occupancy and approval steps still differ from place to place. Check your own lot before you plan.
Source: Md. Code, Land Use § 4-504
Updated Research checked
Strength
Moderate
State law does part of the job: it may reach only some places, start later, or set speed rules only.
Research checked
September 12, 2026
Date our team last checked the sources.
The state rule
Maryland counties and cities must allow ADUs by October 1, 2026.
Source: Md. Code, Land Use § 4-504
Maryland's ADU law (HB 1466 of 2025) makes it state policy to encourage ADUs on lots with a single-family detached home. Every county and city must pass a local law allowing ADUs by October 1, 2026. Local rules cannot set side and rear setbacks stricter than those for sheds and garages, cannot count ADUs toward density limits, and can only require extra parking after a parking study with a waiver process.
Local legislative bodies under the Land Use Article. The law was made to apply to charter counties (Land Use § 1-401(b)(19)) and to Baltimore City (Land Use § 10-103(b)(18)). It covers land with a single-family detached home as the main home (Land Use § 4-502).
Factory-built hook Zoning parity · Modular and manufactured where single-family is allowed
HB 1466 does not name ADU construction types. Separately, a local legislative body may not prohibit placing a new modular dwelling, or a new manufactured home converted to real property, in a zone that allows single-family homes (Land Use § 4-104(d)). The Maryland Department of Planning points to this rule in its ADU FAQ. Whether a county treats a factory-built ADU the same as a site-built one is a local question.
Source: Md. Code, Land Use § 4-104(d)
Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.
What state law says on each point, with its source. Where the state is silent, your city or county decides.
State law does not set a number of ADUs per lot. Each local law must authorize ADUs on land with a single-family detached home. Local caps vary (Howard County and Anne Arundel County allow one per lot).
Source: Md. Code, Land Use § 4-504
Not required. The Maryland Department of Planning says a local government may allow ADUs by right, or may require a conditional use or special exception. The ministerial 90-day review in the bill as introduced was removed before passage.
Source: Maryland Department of Planning, ADU FAQ for Local Governments (HB 1466)
State law defines an ADU as not greater than 75% of the size of, and subordinate in use to, the main single-family detached home (Land Use § 4-501(b)). The Maryland Department of Planning reads this to mean local laws may not cap ADU size below 75% of the main home, and recommends measuring finished living area above grade. This is a percentage, not a fixed square-foot floor.
Source: Md. Code, Land Use § 4-501
not addressed. State law is silent, and some counties require it (Howard County requires the owner to live in the main home or the ADU).
Source: Md. Code, Land Use § 4-504
Not addressed in the enacted law. The Maryland Department of Planning says HB 1466 does not dictate the size of the lot.
Source: Maryland Department of Planning, ADU FAQ for Local Governments (HB 1466)
A local ADU law may not set side and rear setbacks that exceed the existing setbacks for accessory structures (such as sheds and garages).
Source: Md. Code, Land Use § 4-504
Not addressed by state law. Height is set locally.
Source: Md. Code, Land Use § 4-504
A local law may add off-street parking rules only after the local government completes a parking study, and it must offer a waiver process. The rules must consider cost, curb space, stormwater and lot size.
Source: Md. Code, Land Use § 4-504
No state deadline for ADU permit decisions. The 90-day ministerial review in the bill as introduced was dropped; enacted law has only Land Use §§ 4-501 to 4-504.
Source: Md. Code, Land Use § 4-504
Not addressed in the enacted law. The bill as introduced had limits on impact fees and utility connection fees, but they are not in the final Land Use § 4-504. Local fees vary.
Source: Md. Code, Land Use § 4-504
Deeds, HOA rules and similar private documents may not impose an unreasonable limitation on building or renting an ADU if the owner follows the law. Limits on short-term rental are allowed. Historic properties on or eligible for the Maryland Register are exempt. Local governments keep their power to regulate short-term rentals.
Source: Md. Code, Real Property § 2-126
Deadline for every covered county and city to have a local law authorizing ADUs.
Source: Md. Code, Land Use § 4-504
Howard County's CB 3-2026 took effect, expanding where attached and detached ADUs can be built.
HB 1538 of 2026 (Maryland Generational Housing Act), which would have required at least one internal and one external ADU per lot, got a House hearing but did not pass.
Source: HB 1538 (2026) bill page
HB 1466 took effect, including the Real Property § 2-126 limits on HOA and deed restrictions against ADUs.
Source: HB 1466 (2025) bill page
Governor signed HB 1466 (Chapter 197) and SB 891 (Chapter 196), the Maryland ADU law.
Source: Chapter 197 of 2025 (HB 1466)
HB 538 (Chapter 122 of 2024) took effect. It bars local bans on new modular homes in zones that allow single-family homes.
Source: HB 538 (2024) bill page
Your city or county runs the permit counter. Here is what we verified for 7 places in Maryland, and who to call.
Housing and Community Development permits are processed online through the E-Permits system, or at the kiosk at 417 E Fayette St.
ADUs without a special exception approved before May 20, 2013 must get a Class 3 Accessory Dwelling Unit License from DHCA. You apply online with an AccessMCG account.
Class 3 Accessory Dwelling Unit License
The County Council set up an ADU Task Force under CR-091-2025 to help put the state ADU law into practice. It met several times in 2025 and 2026.
A building permit is needed for any accessory structure over 120 square feet, and you apply through the county's online permit portal.
A detached ADU can be up to the lesser of 800 square feet or 50% of the main home's floor area. No extra parking is required, and there is no minimum lot size.
Under CB 3-2026, effective April 8, 2026, an ADU can be up to 75% of the main home's exterior footprint. The owner must live on site, and ADUs cannot be short-term rentals.
Accessory Dwelling Unit (ADU) Application ($25 fee)
A detached ADU, new or converted, may not exceed 800 square feet. The owner must live in the main home or the ADU, and the other unit cannot be rented for less than 90 days.
PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.
Your site contractor's bid is the price for that work. PERCH does not perform site work.
Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.
Maryland counties and cities must allow ADUs by October 1, 2026. Maryland's ADU law (HB 1466 of 2025) makes it state policy to encourage ADUs on lots with a single-family detached home. Every county and city must pass a local law allowing ADUs by October 1, 2026. Local rules cannot set side and rear setbacks stricter than those for sheds and garages, cannot count ADUs toward density limits, and can only require extra parking after a parking study with a waiver process.
HB 1466 does not name ADU construction types. Separately, a local legislative body may not prohibit placing a new modular dwelling, or a new manufactured home converted to real property, in a zone that allows single-family homes (Land Use § 4-104(d)). The Maryland Department of Planning points to this rule in its ADU FAQ. Whether a county treats a factory-built ADU the same as a site-built one is a local question.
State law defines an ADU as not greater than 75% of the size of, and subordinate in use to, the main single-family detached home (Land Use § 4-501(b)). The Maryland Department of Planning reads this to mean local laws may not cap ADU size below 75% of the main home, and recommends measuring finished living area above grade. This is a percentage, not a fixed square-foot floor.
not addressed. State law is silent, and some counties require it (Howard County requires the owner to live in the main home or the ADU).
Deeds, HOA rules and similar private documents may not impose an unreasonable limitation on building or renting an ADU if the owner follows the law. Limits on short-term rental are allowed. Historic properties on or eligible for the Maryland Register are exempt. Local governments keep their power to regulate short-term rentals.
No state deadline for ADU permit decisions. The 90-day ministerial review in the bill as introduced was dropped; enacted law has only Land Use §§ 4-501 to 4-504.
No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.
No. It summarizes Maryland state law as checked on September 12, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.
Not legal advice. This page summarizes state law as of September 12, 2026. Laws change, cities add their own rules, and deed restrictions can apply. Confirm with your local planning office, and with an attorney for anything binding.
A 7-day review of your land, your home and your budget. We confirm your land can take your home, check your permit and line up your site contractor, then walk you through it on a call.
You pay on Stripe. PERCH never asks for payment by text.