ADU laws · Maine

Maine ADU Laws (2026): Can You Add a Modular ADU?

Every Maine town must allow at least one ADU per house. Maine has a statewide ADU law that is already in force. The rules have applied since January 1, 2024 in most cities and since July 1, 2024 everywhere else. Check your own lot before you plan.

Source: 30-A M.R.S. section 4364-B(1) and (3)(A)

Updated Research checked

Strength

Strong

State law makes covered cities allow at least one ADU under rules the state sets.

Factory-built hook

Code preemption

State program

Research checked

September 19, 2026

Date our team last checked the sources.

What Maine law says about ADUs

The state rule

Every Maine town must allow at least one ADU per house.

Source: 30-A M.R.S. section 4364-B(1) and (3)(A)

Maine has a statewide ADU law that is already in force. Under 30-A M.R.S. section 4364-B, every municipality must allow at least one accessory dwelling unit on a lot where a single-family home is the main building, in any area where homes are allowed, including where homes need a conditional use permit. The one ADU does not count against the density limit, no extra parking may be required, and the setbacks and dimensions must be the same as those for the main home. The rules have applied since January 1, 2024 in most cities and since July 1, 2024 everywhere else.

Who the law covers

Every municipality in Maine. There is no population floor and no growth-area limit on the ADU section itself. Two narrow carve-outs apply: a lot inside the drinking water watershed of the Lewiston or Auburn source that holds a federal filtration waiver is outside the section, and the state Minimum Lot Size Law in Title 12, chapter 423-A still applies, which matters on lots that use a septic system rather than a public sewer. Shoreland zoning rules still apply to an ADU, although a town may not ban ADUs from the shoreland zone as a class. Unorganized territory is not covered, because the section speaks to municipalities.

Statutes and documents behind this section
  • 30-A M.R.S. section 4364-B (accessory dwelling units)
  • 30-A M.R.S. section 4364, subsection 1-A (implementation date)
  • 30-A M.R.S. section 4364-A (up to 4 dwelling units allowed)
  • 30-A M.R.S. section 4363 (regulation of tiny homes)
  • 12 M.R.S. section 4807-A (Minimum Lot Size Law)
  • LD 1829 chaptered law text (P.L. 2025, c. 385)
  • LD 2173 chaptered law text (P.L. 2025, c. 733)

Can a modular ADU go on a Maine lot?

Factory-built hook Code preemption · State program

State law does not say how an ADU must be built. The statutory definition is simply a self-contained dwelling unit located within, attached to or detached from a home on the same parcel, so a factory-built unit can qualify. Maine also state-certifies modular homes. Under 10 M.R.S. section 9042(3), new manufactured housing that complies with the state program is exempt from state or local codes, standards, rules or regulations that regulate the same matters, and section 9042(5) says a certificate of occupancy may not be denied for claimed noncompliance except where there is an imminent risk of serious injury or death. Separately, 30-A M.R.S. section 4363 says a town must permit a tiny home on a lot where single-family homes are allowed, or as an accessory structure. Local rules still decide foundation, height, setbacks and appearance, and at least one town rules out a movable structure: Biddeford's code requires the ADU to be built to all applicable codes and Brunswick requires water and wastewater sign-off before a permit issues. Confirm with the code office before ordering.

Source: 30-A M.R.S. section 4301(1-C); 10 M.R.S. section 9042; 30-A M.R.S. section 4363

Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.

Maine ADU rules, point by point

What state law says on each point, with its source. Where the state is silent, your city or county decides.

How many ADUs

At least one ADU per lot where a single-family home is the main building, in any area where homes are allowed, including areas where homes need a conditional use permit. A town may allow more. From July 1, 2027, the right also reaches a lot with a 2-unit or 3-unit home.

Source: 30-A M.R.S. section 4364-B(1) and (3)(A)

Approval path

State law lets a town set up an ADU application and permit process that does not require planning board approval, and most towns do. The law does not force a town to skip the planning board today. From July 1, 2027, 30-A M.R.S. section 4364-A(5-A) as amended says a town may not require planning board approval for 4 or fewer dwelling units in a structure.

Source: 30-A M.R.S. section 4364-B(8)(A)

Size

State law sets a floor, not a ceiling. An ADU must meet a minimum size of 190 square feet, or a different minimum if the Technical Building Codes and Standards Board adopts one under 10 M.R.S. section 9722. A town may set its own maximum size, and Maine towns do: verified caps run from 900 square feet in Lewiston and Biddeford to 1,100 square feet in Brunswick, while Portland instead caps an ADU at two thirds of the gross floor area of the largest main unit on the lot.

Source: 30-A M.R.S. section 4364-B(6)

Owner living on site

Not banned yet. The ban is on the books but not yet in force. New paragraph 4-E of section 4364-B says a town must allow an ADU to be built and lived in even if the lot owner does not live in a home on that lot. It was added by LD 1829 in 2025 and, after LD 2173 in 2026, it applies to municipalities beginning July 1, 2027. Until then a town may keep an owner-occupancy rule, and some do, including Lewiston and Biddeford.

Source: 30-A M.R.S. section 4364-B(4)(E); P.L. 2025, c. 385, sec. 23 as amended by P.L. 2025, c. 733, sec. 25

Lot size

Section 4364-B sets no minimum lot size. Two other state rules can still bite. The Minimum Lot Size Law says a home that sends waste to a septic system needs a lot of at least 20,000 square feet, and at least 100 feet of frontage if the lot touches a lake, pond, stream, river or tidal area. Multi-unit housing on septic needs a proportionally larger lot, figured at 120 gallons per bedroom against a 300 gallon per day single-family baseline. Town shoreland rules can also set larger lot and frontage minimums, as they do in Brunswick.

Source: 12 M.R.S. section 4807-A; 30-A M.R.S. section 4364-B(1)

Setbacks

For an ADU inside, attached to, or sharing a wall with the main home, the setbacks and dimensional rules must be the same as those for the single-family home. If the ADU goes into a building, secondary building or garage that already stood on the implementation date, the setback rules for that kind of structure apply instead. A town may set more permissive setbacks for an ADU, and some have.

Source: 30-A M.R.S. section 4364-B(4)(B)

Height

State law sets no ADU height number. For an ADU inside or attached to the home, the dimensional rules of the single-family home apply, which in practice means the home's height limit. Towns set their own detached ADU heights. Verified examples: Portland limits a detached ADU to 18 feet, or 25 feet if it sits above a garage; Brunswick says a detached ADU may not go above the height of the main building unless it is built over a garage.

Source: 30-A M.R.S. section 4364-B(4)(B)

Parking

No extra parking. An ADU may not be subject to any parking requirement beyond what the single-family home on the lot already has to provide.

Source: 30-A M.R.S. section 4364-B(4)(C)

Permit timeline

State law sets no permit deadline for an ADU and no automatic approval. One thing is fixed: once a local plumbing inspector gives written verification that the water and wastewater requirements are met, a town may not ask for more review or paperwork on water and wastewater before issuing the certificate of occupancy. That limit was added in 2025 and applies to municipalities beginning July 1, 2027. Local timing varies. South Portland publishes roughly 3 to 4 weeks for zoning permit review and 4 to 6 weeks for building permit review.

Source: 30-A M.R.S. section 4364-B(7), final blocked paragraph

Impact fees

State law does not cap ADU permit fees or impact fees, so town fees apply. Verified examples: South Portland charges a $500 zoning permit fee for an ADU, split into a $200 application meeting fee and a $300 submittal fee, on top of the building permit. Biddeford charges a $200 nonrefundable ADU application fee on top of building, electrical and plumbing fees. Sewer or water connection charges are separate.

Source: City of South Portland, Accessory Dwelling Units page

Renting it out

State law does not limit long-term renting of an ADU, and an ADU permit does not count against a town's rate of growth ordinance. Short-term rental is a different matter: 30-A M.R.S. section 4364-C(2) expressly lets a town make and enforce short-term rental rules, so check the town. Private deed restrictions and covenants are not touched by the ADU section and can still block an ADU.

Source: 30-A M.R.S. section 4364-B(9) and (11); section 4364-C(2)

What changed recently

  1. The Governor signed LD 2173, An Act to Update the Laws Regarding Housing Developments and Accessory Dwelling Units, as P.L. 2025, c. 733. It pushed the 2025 housing density changes back so that they apply to every municipality beginning July 1, 2027, narrowed the widened ADU right to lots with a single-family, 2-unit or 3-unit home, and let a town exempt land in a coastal barrier, a coastal sand dune system or a special flood hazard area.

    Source: P.L. 2025, c. 733 (LD 2173), secs. 16 to 19 and 25 to 26

  2. P.L. 2025, c. 385 (LD 1829) took effect as law. Its ADU changes, including the rule that a town must allow an ADU even when the lot owner does not live on the lot, are on the books but do not bind municipalities until July 1, 2027.

    Source: P.L. 2025, c. 733, secs. 23, 24 and 26 (retroactive to September 24, 2025)

  3. Brunswick's ordinance amendment 25-007 on accessory dwelling units took effect, raising the ADU size limit and changing the percentage test.

    Source: Town of Brunswick, 25-007 Accessory Dwelling Units (Amended 7/7/25)

  4. The Governor signed LD 1829 as P.L. 2025, c. 385.

    Source: LD 1829 bill history

  5. Portland's new Land Use Code took effect, adopted unanimously by the City Council on November 4, 2024. Section 6.6.2.A allows up to two ADUs on a qualifying property.

    Source: City of Portland, Zoning Administration page and Land Use Code

  6. The statewide ADU requirement reached the remaining municipalities, those whose ordinances need a vote of the voters.

    Source: 30-A M.R.S. section 4364, subsection 1-A(B)

  7. The statewide ADU requirement began to apply to municipalities whose ordinances can be enacted by the municipal officers without a further vote of the voters.

    Source: 30-A M.R.S. section 4364, subsection 1-A(A)

  8. Lewiston's new ADU ordinance language took effect. Records of in-law apartments were converted to accessory dwelling units, and new ADUs can be built with a building permit.

    Source: City of Lewiston, Accessory Dwelling Units guide

  9. The Governor signed LD 2003 as P.L. 2021, c. 672, creating 30-A M.R.S. section 4364-B, Maine's first statewide ADU requirement.

    Source: LD 2003 bill history, 130th Legislature

Maine city records

Your city or county runs the permit counter. Here is what we verified for 8 places in Maine, and who to call.

Portland

Portland allows up to two ADUs on a qualifying property. An ADU is capped at two thirds of the gross floor area of the largest main unit on the lot, is exempt from maximum lot coverage and from minimum lot area per dwelling unit, and a detached ADU is limited to 18 feet tall, or 25 feet if built above a garage.

Permitting & Inspections (Zoning Administration)
(207) 874-8703 · Planning office website
Checked September 19, 2026

Lewiston

Lewiston's ADU ordinance took effect April 20, 2023. An ADU is allowed only on a lot that already has a main home, is capped at 900 square feet, and can be built with a building permit rather than a special approval. Either the main home or the ADU has to be owner occupied.

Published ADU guide, fact sheet and a recordation form for the deed

Planning & Code Enforcement
(207) 513-3125 · Planning office website
Checked September 19, 2026

Bangor

Bangor publishes two pre-approved ADU building plans, free to download, drawn to meet the City's current codes. The City first allowed ADUs in 2019, changed its zones in 2023 to comply with LD 2003, and in 2024 reduced the setback and dimensional restrictions on ADUs.

Pre-Approved Housing Plans, including two pre-approved accessory dwelling unit designs with matching residential code checklists

Planning Division (permits through Code Enforcement)
(207) 992-4280 · Planning office website
Checked September 19, 2026

South Portland

South Portland runs the clearest ADU process in the state. The zoning permit costs $500 in total, review takes about 3 to 4 weeks for the zoning permit and 4 to 6 weeks for the building permit, no extra parking is required, an ADU no longer has to be attached to the home, and most cases need no public hearing.

City of South Portland ADU Guidebook, ADU Building Standards handout, and a three-step zoning permit process with a required pre-application meeting

Code Enforcement
(207) 767-7603 · Planning office website
Checked September 19, 2026

Auburn

Auburn's building code is the Maine Uniform Building and Energy Code, and since April 7, 2025 permit applications are held to the 2021 editions. Plumbing follows the 2021 Maine State Internal Plumbing Code, and staff work with the Lake Auburn Watershed Commission on septic and sewer design inside that watershed.

Planning, Permitting & Code
(207) 333-6601 · Planning office website
Checked September 19, 2026

Biddeford

One ADU is allowed per residentially zoned parcel, outside the RP overlay district. The unit must be at least 300 square feet and no more than 35 percent of the main home's gross floor area or 900 square feet, whichever is greater, with no more than two bedrooms. The Code Enforcement Office decides the application administratively, and the fee is $200 on top of the building, electrical and plumbing fees.

Code Enforcement (ADU page published by Economic & Community Development, Housing Services)
(207) 284-9236 · Planning office website
Checked September 19, 2026

Sanford

Sanford's Code Enforcement Office reviews plans for building permit applications and answers zoning and land use questions, and every inspection needs at least 24 hours notice. The office is at 919 Main Street and is open Monday through Thursday, 7:30 AM to 5:30 PM, closed Friday.

Code Enforcement (ordinances through Planning & Development)
(207) 324-9145 · Planning office website
Checked September 19, 2026

Brunswick

An ADU in Brunswick needs no Development Review and does not count toward density. One ADU is allowed per lot, on lots used mainly as single-family or two-family, in the main building or in a detached building. As amended July 7, 2025, the unit may be no larger than 1,100 square feet or 75 percent of the main building's floor area, whichever is less, and garage or carport space used by the ADU does not count toward that.

ADU Boost, a grant and financing pilot for Bath, Brunswick and Rockland with an incentive grant of 10 percent of qualified costs up to $10,000

Planning & Development
(207) 725-6660 · Planning office website
Checked September 19, 2026

How PERCH fits

PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.

PERCH

  • Your modular home, built to order in the factory nearest you
  • Delivery to your land
  • The crew that sets the home on your foundation
  • Plan documents for your permit application

You

  • Your land
  • A licensed local contractor you hire for the site work
  • The foundation, water, sewer or septic, and power hookups
  • Your permits, using the documents we give you

Your site contractor's bid is the price for that work. PERCH does not perform site work.

Modular ADUs for Maine

Check your exact lot

Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.

Free. No obligation.

Questions, answered

Is there a statewide ADU law in Maine?

Every Maine town must allow at least one ADU per house. Maine has a statewide ADU law that is already in force. Under 30-A M.R.S. section 4364-B, every municipality must allow at least one accessory dwelling unit on a lot where a single-family home is the main building, in any area where homes are allowed, including where homes need a conditional use permit. The one ADU does not count against the density limit, no extra parking may be required, and the setbacks and dimensions must be the same as those for the main home. The rules have applied since January 1, 2024 in most cities and since July 1, 2024 everywhere else.

Can a modular home be an ADU in Maine?

State law does not say how an ADU must be built. The statutory definition is simply a self-contained dwelling unit located within, attached to or detached from a home on the same parcel, so a factory-built unit can qualify. Maine also state-certifies modular homes. Under 10 M.R.S. section 9042(3), new manufactured housing that complies with the state program is exempt from state or local codes, standards, rules or regulations that regulate the same matters, and section 9042(5) says a certificate of occupancy may not be denied for claimed noncompliance except where there is an imminent risk of serious injury or death. Separately, 30-A M.R.S. section 4363 says a town must permit a tiny home on a lot where single-family homes are allowed, or as an accessory structure. Local rules still decide foundation, height, setbacks and appearance, and at least one town rules out a movable structure: Biddeford's code requires the ADU to be built to all applicable codes and Brunswick requires water and wastewater sign-off before a permit issues. Confirm with the code office before ordering.

How big can an ADU be in Maine?

State law sets a floor, not a ceiling. An ADU must meet a minimum size of 190 square feet, or a different minimum if the Technical Building Codes and Standards Board adopts one under 10 M.R.S. section 9722. A town may set its own maximum size, and Maine towns do: verified caps run from 900 square feet in Lewiston and Biddeford to 1,100 square feet in Brunswick, while Portland instead caps an ADU at two thirds of the gross floor area of the largest main unit on the lot.

Do I have to live on the property to have an ADU in Maine?

Not banned yet. The ban is on the books but not yet in force. New paragraph 4-E of section 4364-B says a town must allow an ADU to be built and lived in even if the lot owner does not live in a home on that lot. It was added by LD 1829 in 2025 and, after LD 2173 in 2026, it applies to municipalities beginning July 1, 2027. Until then a town may keep an owner-occupancy rule, and some do, including Lewiston and Biddeford.

Can I rent out an ADU in Maine?

State law does not limit long-term renting of an ADU, and an ADU permit does not count against a town's rate of growth ordinance. Short-term rental is a different matter: 30-A M.R.S. section 4364-C(2) expressly lets a town make and enforce short-term rental rules, so check the town. Private deed restrictions and covenants are not touched by the ADU section and can still block an ADU.

How long does an ADU permit take in Maine?

State law sets no permit deadline for an ADU and no automatic approval. One thing is fixed: once a local plumbing inspector gives written verification that the water and wastewater requirements are met, a town may not ask for more review or paperwork on water and wastewater before issuing the certificate of occupancy. That limit was added in 2025 and applies to municipalities beginning July 1, 2027. Local timing varies. South Portland publishes roughly 3 to 4 weeks for zoning permit review and 4 to 6 weeks for building permit review.

Does PERCH do the site work?

No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.

Is this page legal advice?

No. It summarizes Maine state law as checked on September 19, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.