ADU laws · Kansas

Kansas ADU Laws (2026): Can You Add a Modular ADU?

Kansas must approve a code-compliant ADU in 30 days. Kansas enacted Senate Bill 418, the By-right Housing Development Act, in 2026. The Governor approved it on April 7, 2026. The act names accessory dwelling units by name. Your lot can change the answer, so check your exact address and call your local planning office before you plan.

Source: SB 418 enrolled, New Sec. 1(c)(2)

Updated Research checked

Strength

Moderate

State law does part of the job: it may reach only some places, start later, or set speed rules only.

Factory-built hook

Zoning parity

Residential-design manufactured homes

Research checked

September 23, 2026

Date our team last checked the sources.

What Kansas law says about ADUs

The state rule

Kansas must approve a code-compliant ADU in 30 days.

Source: SB 418 enrolled, New Sec. 1(c)(2)

Kansas enacted Senate Bill 418, the By-right Housing Development Act, in 2026. The Governor approved it on April 7, 2026. The act names accessory dwelling units by name. If an ADU meets the city or county zoning code and land use rules, the city or county must approve it as a matter of right, with no discretionary review by a planning commission or zoning board, and the application is deemed approved if it is not denied within 30 days. The act does not force a city to allow ADUs in the first place, and it sets no size, parking, setback or owner-occupancy rule. It speeds up the yes; it does not create the yes.

Who the law covers

Every permitting or regulatory authority in Kansas. The act sets no population floor and no city or county exemption. Section 3 defines 'political subdivision' as any county, city, unified government or other political or taxing subdivision of Kansas. Projects are carved out of the by-right path if they need a federal or state discharge permit or a stormwater drainage study, if a townhouse project has more than 12 attached units, if public infrastructure extensions are required and not yet completed or agreed to, if they would increase impervious surface in a way that hurts drainage into a special flood hazard area, or if they sit in a National Register historic district or are otherwise subject to historic preservation review. Private covenants and homeowners association rules are untouched.

Statutes and documents behind this section
  • Senate Bill 418, enrolled text (2026), New Sec. 1
  • SB 418 bill history and versions, Kansas Legislature
  • Kansas Legislative Research Department, 2026 Summary of Legislation: By-right Housing; SB 418
  • K.S.A. 12-763, exclusion of manufactured homes prohibited
  • K.S.A. 12-742, planning and zoning definitions

Can a modular ADU go on a Kansas lot?

Factory-built hook Zoning parity · Residential-design manufactured homes

Kansas keeps three separate things apart and so should you. (a) The ADU provision itself: SB 418 defines an ADU only as 'a secondary housing unit that is subordinate to the primary dwelling unit on the same lot and may include a separate kitchen, bathroom and entrance.' It does not name manufactured, modular or factory-built homes at all, either to allow them or to bar them. (b) Building-code preemption: SB 418 New Section 3 forces every political subdivision to accept the 2018 International Residential Code for a new single-family home under 2,500 square feet on its own lot, but that section is written for a home on its own separate lot, so it does not appear to reach an ADU. (c) HUD-code zoning parity: this is separate and much older. K.S.A. 12-763 says a city or county cannot zone manufactured homes out of its entire jurisdiction, and cannot exclude a residential-design manufactured home from single-family residential districts just because it is a manufactured home. A residential-design manufactured home is defined in K.S.A. 12-742(a)(7) as one on a permanent foundation, at least 22 body feet wide, with a pitched roof and siding and roofing customarily used on site-built homes. K.S.A. 12-763(b) still lets a city set architectural and aesthetic standards. Nothing in 12-763 says a manufactured home may be used as an ADU; it is a district-level parity rule, not an ADU rule. Whether a factory-built home can be your ADU is therefore a city-by-city question in Kansas.

Source: SB 418 enrolled, New Sec. 1(b)(1) and New Sec. 3; K.S.A. 12-763; K.S.A. 12-742(a)(5) and (a)(7)

Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.

Kansas ADU rules, point by point

What state law says on each point, with its source. Where the state is silent, your city or county decides.

How many ADUs

State law does not set a number. SB 418 does not require any city or county to allow an ADU on a lot. It only says that an ADU project that already fits the local zoning code and land use rules must be approved by right. How many ADUs a lot may have is still a local question.

Source: Senate Bill 418, enrolled text (2026), New Sec. 1

Approval path

This is the heart of the Kansas law. New Section 1(c)(1) says a proposed housing development, including an accessory dwelling unit, that meets the by-right definition and the criteria in the zoning code and land use regulations 'shall be approved by-right, without the need for discretionary review or approval by planning commissions, zoning boards or other regulatory bodies.' If the application is denied, the applicant can appeal, and a court reviews the denial de novo. An abuse of discretion is established if the permitting authority's findings are not supported by clear and convincing evidence. A court may award attorney fees to a winning applicant if the permitting authority acted in bad faith, and fees can never be awarded against the applicant.

Source: SB 418 enrolled, New Sec. 1(c)(1), 1(f)

Size

State law sets no ADU size floor and no ADU size cap. Size is set by the city or county. Note a separate rule that is easy to confuse with this one: SB 418 New Section 3 requires every political subdivision to allow the 2018 International Residential Code, a single-car garage, one side of architectural finish, and a minimum lot size of 3,000 square feet for new single-family homes under 2,500 square feet of livable floor area. That section applies to a home 'constructed on each such residence's own separate lot or parcel with its own individual legal description.' An ADU sits on the same lot as the main house by definition, so Section 3 does not appear to reach ADUs.

Source: SB 418 enrolled, New Sec. 1(b)(1), New Sec. 3(a)

Owner living on site

Not addressed. SB 418 says nothing about owner occupancy, so any city or county owner-occupancy rule still stands.

Source: Senate Bill 418, enrolled text (2026), New Sec. 1

Lot size

Not addressed for ADUs. The 3,000 square foot minimum lot size in New Section 3 applies to a new single-family home on its own separate lot, not to an ADU sharing a lot with a main house.

Source: SB 418 enrolled, New Sec. 3(a)(4)

Setbacks

Not addressed for ADUs. Local setback rules apply. New Section 3 allows reasonable setback requirements even for the small-home lot rule it creates.

Source: SB 418 enrolled, New Sec. 3(a)(4)

Height

Not addressed by state law. Cities and counties set ADU height limits.

Source: Senate Bill 418, enrolled text (2026), New Sec. 1

Parking

Not addressed. Kansas state law sets no ADU parking rule, so the city or county rule applies.

Source: Senate Bill 418, enrolled text (2026), New Sec. 1

Permit timeline

A complete application for a by-right housing development, which includes an ADU, is deemed approved unless it is denied within 30 days of receipt. The clock is 60 days if the application needs a subdivision plat approved under K.S.A. 12-752, and 90 days if it needs a plat of more than 40 single-family homes. A subdivision plat itself is never deemed approved unless it complies with the plat statutes. A regulatory authority may not ask an applicant to waive a deadline.

Source: SB 418 enrolled, New Sec. 1(c)(2), New Sec. 2(e)

Impact fees

Not addressed for permit or impact fees generally. The only fee rule in SB 418 is narrow: a regulatory authority may not charge an extra fee for a third-party review or inspection done under the opt-in track in New Section 2(c).

Source: SB 418 enrolled, New Sec. 2(c)

Renting it out

Not addressed. SB 418 says nothing about renting an ADU, long term or short term, so city and county rental rules apply. The act also expressly leaves private covenants and homeowners association rules in force.

Source: SB 418 enrolled, New Sec. 1(e)

What changed recently

  1. The Governor approved Senate Bill 418, the By-right Housing Development Act. It is the first Kansas statute to name accessory dwelling units. A code-compliant ADU application is now deemed approved if a city or county does not deny it within 30 days.

    Source: SB 418 bill history, 'Approved by Governor on Tuesday, April 7, 2026'

  2. SB 418 was enrolled and presented to the Governor.

    Source: SB 418 bill history

  3. The Senate adopted the conference committee report on SB 418, 35 to 4. The House had adopted the same report 117 to 5 on March 26, 2026.

    Source: SB 418 bill history

  4. Lawrence's rewritten Land Development Code took effect, carrying the ADU standards in Section 20-811(b).

    Source: City of Lawrence Land Development Code, April 1, 2025 edition

Kansas city records

Your city or county runs the permit counter. Here is what we verified for 6 places in Kansas, and who to call.

Wichita

The Wichita-Sedgwick County Unified Zoning Code does not use the term accessory dwelling unit at all. A search of the full code on the City's own code host returned no match for the exact phrase, so Wichita has no ADU category and no ADU size cap. Ask the Planning Department which use your second unit would fall under.

Wichita-Sedgwick County Metropolitan Area Planning Department
(316) 268-4421 · Planning office website
Checked September 23, 2026

Overland Park

We have not verified a local ADU rule here yet. Call the planning office below.

Planning and Development Services
(913) 895-6000 · Planning office website
Checked September 23, 2026

Kansas City

An ADU here must sit over a garage on the same lot as the main house, toward the rear of the lot and never in the front yard. It can be attached or detached. Its maximum size is 50 percent of the main structure's finished space, not counting garages and basements, and the lot must keep meeting its existing parking requirement.

Planning and Urban Design, Unified Government of Wyandotte County and Kansas City, Kansas
(913) 573-5750 · Planning office website
Checked September 23, 2026

Olathe

The phrase accessory dwelling unit does not appear anywhere in Olathe's rules. A search of the Olathe Municipal Code, the Unified Development Ordinance, council policies, ordinances, charter ordinances and prior codes on the City's own code host found no match for 'accessory dwelling' or 'accessory apartment'. Olathe has no ADU category and no ADU size cap.

Planning Division
(913) 971-8750 · Planning office website
Checked September 23, 2026

Topeka

Topeka's zoning rules are in Title 18 of the Topeka Municipal Code, and the phrase accessory dwelling unit does not appear anywhere in that code. A search of the whole Topeka Municipal Code, its ordinances, charter ordinances and prior codes on the City's own code host found no match for 'accessory dwelling' or 'accessory apartment'. Topeka has no ADU category and no ADU size cap.

Planning and Development Department, Planning Services Division
(785) 368-3728 · Planning office website
Checked September 23, 2026

Lawrence

Lawrence has no square foot cap on an ADU. An interior or attached ADU can be up to 50 percent of the gross floor area of the house it sits in, and an ADU in or above a detached structure such as a garage can be up to 100 percent of that structure's gross floor area. Lawrence does require owner occupancy: either the house or the ADU must be lived in by a record owner of the property.

ADU registration and affidavit, handled by Planning and Development Services

Planning and Development Services
(785) 832-7700 · Planning office website
Checked September 23, 2026

How PERCH fits

PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.

PERCH

  • Your modular home, built to order in the factory nearest you
  • Delivery to your land
  • The crew that sets the home on your foundation
  • Plan documents for your permit application

You

  • Your land
  • A licensed local contractor you hire for the site work
  • The foundation, water, sewer or septic, and power hookups
  • Your permits, using the documents we give you

Your site contractor's bid is the price for that work. PERCH does not perform site work.

Modular ADUs for Kansas

Check your exact lot

Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.

Free. No obligation.

Questions, answered

Is there a statewide ADU law in Kansas?

Kansas must approve a code-compliant ADU in 30 days. Kansas enacted Senate Bill 418, the By-right Housing Development Act, in 2026. The Governor approved it on April 7, 2026. The act names accessory dwelling units by name. If an ADU meets the city or county zoning code and land use rules, the city or county must approve it as a matter of right, with no discretionary review by a planning commission or zoning board, and the application is deemed approved if it is not denied within 30 days. The act does not force a city to allow ADUs in the first place, and it sets no size, parking, setback or owner-occupancy rule. It speeds up the yes; it does not create the yes.

Can a modular home be an ADU in Kansas?

Kansas keeps three separate things apart and so should you. (a) The ADU provision itself: SB 418 defines an ADU only as 'a secondary housing unit that is subordinate to the primary dwelling unit on the same lot and may include a separate kitchen, bathroom and entrance.' It does not name manufactured, modular or factory-built homes at all, either to allow them or to bar them. (b) Building-code preemption: SB 418 New Section 3 forces every political subdivision to accept the 2018 International Residential Code for a new single-family home under 2,500 square feet on its own lot, but that section is written for a home on its own separate lot, so it does not appear to reach an ADU. (c) HUD-code zoning parity: this is separate and much older. K.S.A. 12-763 says a city or county cannot zone manufactured homes out of its entire jurisdiction, and cannot exclude a residential-design manufactured home from single-family residential districts just because it is a manufactured home. A residential-design manufactured home is defined in K.S.A. 12-742(a)(7) as one on a permanent foundation, at least 22 body feet wide, with a pitched roof and siding and roofing customarily used on site-built homes. K.S.A. 12-763(b) still lets a city set architectural and aesthetic standards. Nothing in 12-763 says a manufactured home may be used as an ADU; it is a district-level parity rule, not an ADU rule. Whether a factory-built home can be your ADU is therefore a city-by-city question in Kansas.

How big can an ADU be in Kansas?

State law sets no ADU size floor and no ADU size cap. Size is set by the city or county. Note a separate rule that is easy to confuse with this one: SB 418 New Section 3 requires every political subdivision to allow the 2018 International Residential Code, a single-car garage, one side of architectural finish, and a minimum lot size of 3,000 square feet for new single-family homes under 2,500 square feet of livable floor area. That section applies to a home 'constructed on each such residence's own separate lot or parcel with its own individual legal description.' An ADU sits on the same lot as the main house by definition, so Section 3 does not appear to reach ADUs.

Do I have to live on the property to have an ADU in Kansas?

Not addressed. SB 418 says nothing about owner occupancy, so any city or county owner-occupancy rule still stands.

Can I rent out an ADU in Kansas?

Not addressed. SB 418 says nothing about renting an ADU, long term or short term, so city and county rental rules apply. The act also expressly leaves private covenants and homeowners association rules in force.

How long does an ADU permit take in Kansas?

A complete application for a by-right housing development, which includes an ADU, is deemed approved unless it is denied within 30 days of receipt. The clock is 60 days if the application needs a subdivision plat approved under K.S.A. 12-752, and 90 days if it needs a plat of more than 40 single-family homes. A subdivision plat itself is never deemed approved unless it complies with the plat statutes. A regulatory authority may not ask an applicant to waive a deadline.

Does PERCH do the site work?

No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.

Is this page legal advice?

No. It summarizes Kansas state law as checked on September 23, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.