ADU laws · Colorado

Colorado ADU Laws (2026): Can You Add a Modular ADU?

Since June 2025, 67 Colorado communities must allow one ADU per house. The state law is strong on paper but covers only metro areas and sets no permit deadline, and some large cities (Aurora most clearly) had not updated their codes as of mid-2026, so check your city's current rules before you plan.

Source: C.R.S. 29-35-403(1); DOLA subject jurisdiction list

Updated Research checked

Strength

Moderate

State law does part of the job: it may reach only some places, start later, or set speed rules only.

Research checked

September 12, 2026

Date our team last checked the sources.

What Colorado law says about ADUs

The state rule

Since June 2025, 67 Colorado communities must allow one ADU per house.

Source: C.R.S. 29-35-403(1); DOLA subject jurisdiction list

Since June 30, 2025, covered Colorado cities must allow one ADU on any lot where a single detached house is allowed, approved by staff with no public hearing. They cannot require owner occupancy, a new parking space in most cases, or design and size rules that are stricter than the law allows. Cities must allow ADUs of at least 500 to 750 square feet.

Who the law covers

"Subject jurisdictions": cities and towns with 1,000 or more people that sit inside a metropolitan planning organization (MPO), plus the parts of counties inside an MPO that are in a census designated place of 40,000 or more. DOLA lists 67, including Denver, Colorado Springs, Aurora, Fort Collins, Lakewood, Thornton, Arvada, Westminster, Pueblo, Greeley, Boulder and Highlands Ranch. Rural areas outside MPOs are not covered. Some parcels are exempt (no public water and sewer or a well that cannot serve another unit, a stand-alone historic property, or land in a floodway or 100-year floodplain).

Statutes and documents behind this section
  • C.R.S. 29-35-401 to 29-35-405 (enacted by HB24-1152 as 29-35-101 to 29-35-105)
  • HB24-1152 bill page
  • DOLA ADU guidance (C.R.S. 29-35-401 through 405)

Can a modular ADU go on a Colorado lot?

Factory-built hook Names it · No stricter design or size rules for factory-built ADUs

Yes for factory-built homes. A city may not apply stricter design or size rules to an ADU that is a factory-built residential structure than to other ADUs. Cities may decide whether motor homes, RVs and multipurpose trailers count as ADUs. Denver and Westminster exclude mobile homes, RVs and tiny homes on wheels; Colorado Springs says prefabricated and manufactured homes may be detached ADUs on a permanent foundation.

Source: C.R.S. 29-35-402(18)(f), 29-35-403(3)(l) (HB24-1152)

Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.

Colorado ADU rules, point by point

What state law says on each point, with its source. Where the state is silent, your city or county decides.

How many ADUs

One ADU per lot with a single detached house (internal, attached or detached). Cities may choose to allow more than one.

Source: C.R.S. 29-35-403(1), (3)(d) (HB24-1152, sec. 1, enacted as 29-35-103)

Approval path

Administrative approval required. Staff decide using only objective standards. No public hearing, and the decision cannot be elevated to a board or council. One exception: a certified local government may send a project on a locally designated historic property to its historic preservation commission.

Source: C.R.S. 29-35-402(5), 29-35-403(1) (HB24-1152)

Size

A city may not block ADU sizes between 500 and 750 sq ft. A city may allow smaller or larger ADUs, and may cap an ADU at the size of the main house. Above 750 sq ft, each city sets its own cap (for example Lakewood 1,400 sq ft, Westminster 1,200 sq ft, Colorado Springs 1,250 sq ft, Fort Collins detached 1,000 sq ft), usually also tied to a percent of the main house.

Source: C.R.S. 29-35-402(18)(b), 29-35-403(3)(c) (HB24-1152)

Owner living on site

State bans the requirement. A city may only ask the owner to show they live on the lot when applying to build or convert an ADU (not when the ADU and a new house are built at the same time) or when applying for a short-term rental license.

Source: C.R.S. 29-35-403(2)(b) (HB24-1152)

Lot size

A city may not require a bigger lot for an ADU than it requires for a single detached house in the same zone.

Source: C.R.S. 29-35-402(18)(e) (HB24-1152)

Setbacks

Side setbacks can be no larger than for the main house in the same zone. Rear setbacks can be no larger than the greater of the rear setback for other accessory buildings in the zone or 5 feet.

Source: C.R.S. 29-35-402(18)(c)-(d) (HB24-1152)

Height

Not addressed by state law. Cities set ADU height limits (for example Colorado Springs caps a detached ADU at 16 feet; Lakewood at 20 feet, or 30 feet over a detached garage).

Source: HB24-1152 text (no height provision)

Parking

A city cannot require a new off-street space. It may require that an existing driveway, garage or other off-street space be set aside for the ADU. It may require one new space only if the lot has no off-street parking, the zone required parking for the main house as of January 1, 2024, and on-street parking is banned on that block.

Source: C.R.S. 29-35-403(2)(a), (3)(a)-(b) (HB24-1152)

Permit timeline

State law sets no permit deadline and no automatic approval. It only requires a staff-level (administrative) review with no public hearing.

Source: C.R.S. 29-35-402(5), 29-35-403(1) (HB24-1152)

Impact fees

Not capped. Cities may charge generally applicable impact fees and require impact mitigation under existing law. The state ADU grant program can help certified cities waive or reduce ADU fees for some projects.

Source: C.R.S. 29-35-403(3)(f), 29-35-405 (HB24-1152)

Renting it out

Long-term rental is allowed; cities cannot require the owner to live on site. Cities may regulate or ban short-term rentals of an ADU or the main house, and may require the owner to live on the lot when applying for a short-term rental license.

Source: C.R.S. 29-35-403(2)(b)(II), (3)(g) (HB24-1152)

What changed recently

  1. State Housing Board rules implementing SB25-002 regional building codes for factory-built structures took effect.

    Source: Division of Housing, Factory Built Structures

  2. DOLA opened the first round of the ADU Grant Program (ADUG) for certified ADU Supportive Jurisdictions. Round 1 awarded $889,525 (November 2025); Round 2 awarded $603,942 (May 2026). Round 3 is set for September 28 to October 23, 2026.

    Source: DOLA ADU Grant Program

  3. ADU rules took effect in all subject jurisdictions; one-time compliance reports were due to DOLA (approved extensions ran to December 30, 2025).

    Source: DOLA ADU guidance, Key Dates

  4. Governor signed SB25-002 on regional building codes for factory-built (modular) structures.

    Source: SB25-002

  5. Governor signed HB24-1152, the statewide ADU law.

    Source: HB24-1152

Colorado city records

Your city or county runs the permit counter. Here is what we verified for 8 places in Colorado, and who to call.

Denver

Every new ADU needs zoning, building, and sewer use and drainage permits, and Denver says ADUs must be built by a licensed contractor. Homeowners cannot apply for the permits themselves.

Community Planning and Development (CPD)
(720) 913-1311 · Planning office website
Checked September 12, 2026

Colorado Springs

The City's ADU FAQ says a tiny home, prefabricated home or manufactured home can be used as a detached ADU. To connect to City utilities, every building must sit on a permanent foundation.

Planning Department
(719) 385-5905 · Planning office website
Checked September 12, 2026

Aurora

On June 9, 2025, Aurora City Council voted to oppose proposed zoning code changes meant to bring its ADU rules in line with HB24-1152.

Building Division / Planning
(303) 739-7420 · Planning office website
Checked September 12, 2026

Fort Collins

Every ADU goes through a Basic Development Review with a flat $6,925 fee, and the City says total ADU fees may run $20,000 to $25,000.

Community Development (Development Review)
(970) 221-6689 · Planning office website
Checked September 12, 2026

Lakewood

Lakewood allows one ADU per lot of up to 1,400 square feet. A detached ADU can be 20 feet tall, or 30 feet if built over a detached garage.

Sustainability and Community Development (Planning)
(303) 987-7500 · Planning office website
Checked September 12, 2026

Thornton

Thornton ADUs must be at least 500 square feet and can be up to 1,000 square feet or 50% of the main home's floor area, whichever is greater. The City requires a deed restriction before it issues a building permit.

City Development, Current Planning
(303) 538-7295 · Planning office website
Checked September 12, 2026

Arvada

Arvada posts a review time of about 3 weeks for a detached ADU and 1 to 2 weeks for an attached or internal ADU permit.

Planning & Zoning / Building Inspection
(720) 898-7435 · Planning office website
Checked September 12, 2026

Westminster

Westminster ADUs can be up to 1,200 square feet or 50% of the main home, whichever is less (750 sq ft if the main home is under 1,500 sq ft), with a two-bedroom maximum. Staff approve the building permit.

Planning Division
(303) 658-2092 · Planning office website
Checked September 12, 2026

How PERCH fits

PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.

PERCH

  • Your modular home, built to order in the factory nearest you
  • Delivery to your land
  • The crew that sets the home on your foundation
  • Plan documents for your permit application

You

  • Your land
  • A licensed local contractor you hire for the site work
  • The foundation, water, sewer or septic, and power hookups
  • Your permits, using the documents we give you

Your site contractor's bid is the price for that work. PERCH does not perform site work.

Modular ADUs for Colorado

Check your exact lot

Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.

Free. No obligation.

Questions, answered

Is there a statewide ADU law in Colorado?

Since June 2025, 67 Colorado communities must allow one ADU per house. Since June 30, 2025, covered Colorado cities must allow one ADU on any lot where a single detached house is allowed, approved by staff with no public hearing. They cannot require owner occupancy, a new parking space in most cases, or design and size rules that are stricter than the law allows. Cities must allow ADUs of at least 500 to 750 square feet.

Can a modular home be an ADU in Colorado?

Yes for factory-built homes. A city may not apply stricter design or size rules to an ADU that is a factory-built residential structure than to other ADUs. Cities may decide whether motor homes, RVs and multipurpose trailers count as ADUs. Denver and Westminster exclude mobile homes, RVs and tiny homes on wheels; Colorado Springs says prefabricated and manufactured homes may be detached ADUs on a permanent foundation.

How big can an ADU be in Colorado?

A city may not block ADU sizes between 500 and 750 sq ft. A city may allow smaller or larger ADUs, and may cap an ADU at the size of the main house. Above 750 sq ft, each city sets its own cap (for example Lakewood 1,400 sq ft, Westminster 1,200 sq ft, Colorado Springs 1,250 sq ft, Fort Collins detached 1,000 sq ft), usually also tied to a percent of the main house.

Do I have to live on the property to have an ADU in Colorado?

State bans the requirement. A city may only ask the owner to show they live on the lot when applying to build or convert an ADU (not when the ADU and a new house are built at the same time) or when applying for a short-term rental license.

Can I rent out an ADU in Colorado?

Long-term rental is allowed; cities cannot require the owner to live on site. Cities may regulate or ban short-term rentals of an ADU or the main house, and may require the owner to live on the lot when applying for a short-term rental license.

How long does an ADU permit take in Colorado?

State law sets no permit deadline and no automatic approval. It only requires a staff-level (administrative) review with no public hearing.

Does PERCH do the site work?

No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.

Is this page legal advice?

No. It summarizes Colorado state law as checked on September 12, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.