ADU laws · California

California ADU Laws (2026): Can You Add a Modular ADU?

California cities must answer in 60 days or your ADU is approved. California has the strongest ADU law in the country. Your lot can change the answer, so check your exact address and call your local planning office before you plan.

Source: Gov. Code 66317

Updated Research checked

Statewide ADU law

Yes

Gov. Code 66317

Strength

Strong

State law makes covered cities allow at least one ADU under rules the state sets.

Factory-built hook

Names it + Zoning parity + Code preemption

Manufactured home is in the ADU definition

Research checked

September 23, 2026

Date our team last checked the sources.

What California law says about ADUs

The state rule

California cities must answer in 60 days or your ADU is approved.

Source: Gov. Code 66317

California has the strongest ADU law in the country. Every city and county must approve an ADU ministerially, with no public hearing and no discretionary vote, and must act within 60 days of a complete application or the permit is deemed approved. State law sets floors a city cannot go below: at least 850 square feet for a one bedroom ADU and 1,000 square feet for one with more than one bedroom, four foot side and rear setbacks, 16 to 18 feet of height for a detached unit, no parking in six common situations, no owner occupancy requirement, no minimum lot size, and no impact fees at all on an ADU of 750 square feet or less.

Who the law covers

Every city and county in California, including charter cities. Government Code 66312 says the chapter applies to charter cities even though Section 65803 would otherwise leave them out. The rules reach any lot in a zone that allows single-family or multifamily residential use, including a mixed-use zone. The California Coastal Act still applies in the coastal zone (Gov. Code 66329), and Government Code 66331 lets a local agency delay enforcement of certain building standards.

Statutes and documents behind this section
  • Gov. Code Title 7, Div. 1, Chapter 13 (Accessory Dwelling Units), sections 66310 to 66342
  • Gov. Code 66312 (chapter applies to charter cities)
  • HCD, Accessory Dwelling Units (confirms SB 477 renumbering; ADU Handbook updated March 2026)

Can a modular ADU go on a California lot?

Factory-built hook Names it + Zoning parity + Code preemption · Manufactured home is in the ADU definition

California is the clearest state in the country on this, and the answer splits three ways. First, the ADU statute itself names factory-built housing: Government Code 66313(a) defines an accessory dwelling unit and then says it 'also includes the following: (1) An efficiency unit. (2) A manufactured home, as defined in Section 18007 of the Health and Safety Code.' Section 18007 is the federal HUD-code manufactured home definition, so a HUD-certified manufactured home is an ADU by statute and a city cannot rule out the whole category. Second, there is building code preemption for a modular (factory-built) home. Under the Factory-Built Housing Law, Health and Safety Code 19960 and following, HCD-certified third-party agencies review the plans and the plant, and every unit sold to a first user in California must carry an HCD insignia of approval (H&SC 19980). A local enforcement agency enforces and inspects only the installation of the unit (H&SC 19992), and where the ordinary State Housing Law in Part 1.5 conflicts with the Factory-Built Housing Law on factory-built housing, the Factory-Built Housing Law controls (H&SC 19990(c)). Third, there is HUD-code zoning parity outside the ADU context: Government Code 65852.3 makes a city allow a HUD-certified manufactured home on a foundation system on any lot zoned for a conventional single-family home, apply only the same development standards it applies to a site-built home, restrict only roof overhang, roofing material and siding material, and it bars any standard that has the effect of precluding manufactured homes as permanent residences.

Source: Gov. Code 66313(a)(2); Gov. Code 65852.3; H&SC 19971, 19980, 19990(c), 19992

Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.

California ADU rules, point by point

What state law says on each point, with its source. Where the state is silent, your city or county decides.

How many ADUs

On a lot with a proposed or existing single detached house, a city must ministerially approve one ADU and one junior ADU (Gov. Code 66323(a)(1)), and must ministerially approve one detached new construction ADU of up to 800 square feet of livable space with four foot side and rear setbacks (66323(a)(2)). On a lot with an existing multifamily building, a city must allow at least one ADU inside unused space and up to 25 percent of the existing unit count (66323(a)(3)), plus detached units capped at eight and never more than the number of existing units (66323(a)(4)). On a proposed multifamily building the detached cap is two.

Source: Gov. Code 66323(a)(1)-(4)

Approval path

Ministerial, with no discretion. Gov. Code 66317 requires the permitting agency to act on a complete ADU application ministerially, without a public hearing and without discretionary review. Section 66314(f) exempts the application from notice and placard requirements except in a historic district. Section 66323(b) bars a city from applying any development standard the chapter does not authorize. Section 66323(c) and 66322 bar a city from making you correct an unrelated nonconforming zoning condition, building code violation or unpermitted structure first, as long as it is not a health or safety risk and is not affected by the ADU work.

Source: Gov. Code 66317; 66314(f); 66322; 66323(b), (c)

Size

A city cannot set a maximum ADU size below 850 square feet of interior livable space, or below 1,000 square feet for an ADU with more than one bedroom (Gov. Code 66321(a)(2)). A city also cannot use any standard, including lot coverage, floor area ratio, open space or front setback, that stops an ADU of at least 800 square feet of interior livable space with four foot side and rear setbacks (66321(a)(3)). A city cannot set a minimum size that would rule out an efficiency unit (66321(a)(1)). Going the other way, 66314(d) lets a local ordinance cap an attached ADU at 50 percent of the existing main house and a detached ADU at 1,200 square feet, so 1,200 square feet is the usual ceiling a city may impose on a detached unit. A junior ADU is capped by definition at 500 square feet of interior livable space inside a single-family house (66313).

Source: Gov. Code 66321(a); 66314(d); 66313

Owner living on site

State law bans the requirement for an ADU. Gov. Code 66315 says no standard beyond those in Section 66314 may be used or imposed, 'including an owner-occupant requirement,' except that a city may require the property be used for rentals of 30 days or longer. A junior ADU is different: under 66333(b), owner occupancy of the single-family house can still be required when the junior ADU shares sanitation facilities with the house, and it is waived when the junior ADU has its own facilities or the property is owned by a government or housing organization.

Source: Gov. Code 66315; 66333(b)

Lot size

A city cannot use a minimum lot size to block an ADU. Gov. Code 66314(b) lets a local ordinance impose objective standards on parking, height, setback, landscape, architectural review and maximum size, and expressly excludes minimum lot size from that list.

Source: Gov. Code 66314(b)

Setbacks

Four feet. A city cannot apply any standard that prevents an ADU of at least 800 square feet of interior livable space with four foot side and rear yard setbacks (Gov. Code 66321(a)(3)), and the detached new construction unit a city must ministerially approve under 66323(a)(2) is defined by its four foot side and rear setbacks. The four foot rule does not set a front setback number, but 66321(a)(3) lists a front setback among the standards a city cannot use to defeat that 800 square foot unit.

Source: Gov. Code 66321(a)(3); 66323(a)(2)

Height

Gov. Code 66321(b) sets the height a city must allow. 16 feet for a detached ADU on a lot with an existing or proposed single-family or multifamily dwelling. 18 feet for a detached ADU on a lot within one half mile walking distance of a major transit stop or a high quality transit corridor, plus up to two more feet to match the roof pitch of the main house. 18 feet for a detached ADU on a lot with an existing or proposed multistory multifamily dwelling. 25 feet, or the height the zone allows for the main house if that is lower, for an ADU attached to the main house, which cannot go above two stories. A city may allow more than these figures, and some do.

Source: Gov. Code 66321(b)

Parking

No parking may be required in six situations under Gov. Code 66322: the ADU is within one half mile walking distance of public transit; it is in an architecturally and historically significant historic district; it is part of the proposed or existing main house or an accessory structure; on-street parking permits are required but are not offered to the ADU occupant; a car share vehicle is within one block; or the ADU application is filed together with a new main house application on the same lot. Outside those six, a city may require at most one space per ADU or one per bedroom, whichever is less, and may allow tandem parking or parking in a setback (66314(d)). A junior ADU can never be required to add parking (66334(a)).

Source: Gov. Code 66322; 66314(d); 66334(a)

Permit timeline

The permitting agency has 15 business days after it receives your application to tell you in writing whether it is complete, and to give you a list of what is missing. Once the application is complete, and there is already a dwelling on the lot, the agency must approve or deny within 60 days. If it has not approved or denied within 60 days, Gov. Code 66317 says the application 'shall be deemed approved.' An appeal must get a final written determination no later than 60 business days after the written appeal. The same 60 day clock applies to a junior ADU under 66335(a)(3). The 15 business day completeness notice is new as of January 1, 2026 under SB 543.

Source: Gov. Code 66317; 66335(a)(3)

Impact fees

No impact fee at all on an ADU with 750 square feet or less of interior livable space, or a junior ADU with 500 square feet or less. Above 750 square feet, impact fees must be charged in proportion to the square footage of the main house rather than at a full new home rate. For many ADUs a local agency, special district or water corporation also cannot require a new separate utility connection between the unit and the utility or charge a related connection fee. Where it may require one, the fee must be proportionate to square footage or to drainage fixture units and cannot exceed the reasonable cost of providing the service. This section used to be numbered 66324; SB 543 renumbered it to 66311.5 as of January 1, 2026.

Source: Gov. Code 66311.5 (renumbered from 66324 by SB 543, Stats. 2025, Ch. 520, Sec. 7)

Renting it out

Long-term rental is protected and short-term rental is not. A city may require that an ADU be rented for terms of 30 days or longer (Gov. Code 66315), and 66323(e) requires rental terms longer than 30 days for the units it covers. In plain terms a city can stop you using an ADU as a nightly vacation rental, and many do. An ADU generally cannot be sold separately from the main house (66314(d)). Article 4 carves out two narrow exceptions: a separate sale to a low or moderate income qualified buyer where a qualified nonprofit built one of the units, with a recorded tenancy in common agreement and 45 years of affordability (66341), and a local ordinance that lets the house and the ADU be converted into condominiums under the Davis-Stirling Act and the Subdivision Map Act, with lienholder consent (66342).

Source: Gov. Code 66315; 66323(e); 66314(d); 66341; 66342

What changed recently

  1. HCD published an updated Accessory Dwelling Unit Handbook, dated March 2026. It is the state's own plain-language guide to the current law and to what a city may and may not require.

    Source: HCD, Accessory Dwelling Units page ('Updated March 2026')

  2. SB 543 took effect. It added a definition of 'livable space,' restated the ADU size floors in terms of interior livable space, and added a rule that the permitting agency must tell you in writing within 15 business days whether your application is complete and what is missing. It also gave junior ADUs the same ministerial approval protections as ADUs where a city has no compliant ordinance, and renumbered the ADU fee section from Government Code 66324 to 66311.5.

    Source: SB 543, Chapter 520, Statutes of 2025, approved October 10, 2025

  3. AB 1170 took effect, amending Government Code 66314, the section that lists what a local ADU ordinance may and may not require.

    Source: AB 1170, Chapter 67, Statutes of 2025 (see the note on Gov. Code 66314)

  4. SB 477 recodified California ADU law. The rules moved out of Government Code 65852.2 and 65852.22 and into a new Chapter 13, sections 66310 to 66342. Nothing about what a city must allow changed, but every old section number did.

    Source: SB 477, Chapter 7, Statutes of 2024; HCD ADU page confirms the renumbering

California city records

Your city or county runs the permit counter. Here is what we verified for 7 places in California, and who to call.

Los Angeles

A detached ADU in Los Angeles can be up to 1,200 square feet of floor area and no more than two stories. An attached ADU is capped at 50 percent of the existing main house, but the ordinance says nothing in it stops an attached ADU under 850 square feet, or under 1,000 square feet if it has more than one bedroom.

ADU Approved Standard Plans Program

Department of Building and Safety (LADBS)
(213) 473-3231 · Planning office website
Checked September 23, 2026

San Diego

A San Diego ADU must be between 150 and 1,200 square feet, and a junior ADU between 150 and 500 square feet. A permit application that uses preapproved plans gets a 30 day review.

Preapproved ADU plans (the City accepts the County of San Diego Standard ADU Plans, the City of Chula Vista Standard ADU Plans and the City of Encinitas Permit-Ready ADU Plans) plus the ADU Bonus Program

Development Services Department
(619) 446-5000 · Planning office website
Checked September 23, 2026

San Jose

With a preapproved ADU plan, San Jose may issue the permit the same day as the scheduled plan review meeting, as long as the site-specific plan and documents are accurate and complete. The lot must be zoned residential with an existing single-family home or duplex, and must not be in a geohazard, landslide, flood or Wildland-Urban Interface zone.

Preapproved ADUs, with a dedicated City review team and a vendor plan catalog

Development Services Permit Center
(408) 793-5302 · Planning office website
Checked September 23, 2026

San Francisco

An ADU in San Francisco cannot be used as a short-term rental. The Planning Department states that accessory dwelling units are ineligible for the City's Short-Term Rental program. Under the State Program, some ADUs can be separately sold or converted to a condominium if they meet every condition.

Three ADU tracks, which the department calls the State Program, the Local Program and the Hybrid Program

San Francisco Planning
(628) 652-7600 · Planning office website
Checked September 23, 2026

Fresno

Pre-approved ADU plans and custom ADU plans in Fresno no longer require a Zone Clearance. Applications now go straight in for a building permit.

Fresno ADU Program, with five pre-approved plans and three design elevation options (Craftsman, Contemporary and Gable)

Planning and Development Department
(559) 621-8077 · Planning office website
Checked September 23, 2026

Sacramento

Sacramento gives away three Shelf Ready ADU plans at no charge: a studio at 367 habitable square feet, a one bedroom at 559, and a two bedroom at 747. You may mirror a plan, but the City says modifications to the Shelf Ready Plans are not allowed.

Shelf Ready ADU Plans, free city-designed plans, plus an ADU Resource Center

Community Development Department
(916) 264-5011 · Planning office website
Checked September 23, 2026

Long Beach

Long Beach has no ADU ordinance of its own right now. The City says Long Beach Municipal Code 21.51.276 no longer applies and that it is administering state ADU law directly until a new local ordinance is adopted, so the state rules are the rules. Plans must be submitted in person at the Permit Center on a USB drive, because online submission is not available.

Pre-Approved Accessory Dwelling Unit Program (PAADU), for new construction only, plus the Backyard Builders Program

Community Development Department, Planning Bureau
(562) 570-6194 · Planning office website
Checked September 23, 2026

How PERCH fits

PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.

PERCH

  • Your modular home, built to order in the factory nearest you
  • Delivery to your land
  • The crew that sets the home on your foundation
  • Plan documents for your permit application

You

  • Your land
  • A licensed local contractor you hire for the site work
  • The foundation, water, sewer or septic, and power hookups
  • Your permits, using the documents we give you

Your site contractor's bid is the price for that work. PERCH does not perform site work.

Modular ADUs for California

Check your exact lot

Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.

Free. No obligation.

Questions, answered

Is there a statewide ADU law in California?

California cities must answer in 60 days or your ADU is approved. California has the strongest ADU law in the country. Every city and county must approve an ADU ministerially, with no public hearing and no discretionary vote, and must act within 60 days of a complete application or the permit is deemed approved. State law sets floors a city cannot go below: at least 850 square feet for a one bedroom ADU and 1,000 square feet for one with more than one bedroom, four foot side and rear setbacks, 16 to 18 feet of height for a detached unit, no parking in six common situations, no owner occupancy requirement, no minimum lot size, and no impact fees at all on an ADU of 750 square feet or less.

Can a modular home be an ADU in California?

California is the clearest state in the country on this, and the answer splits three ways. First, the ADU statute itself names factory-built housing: Government Code 66313(a) defines an accessory dwelling unit and then says it 'also includes the following: (1) An efficiency unit. (2) A manufactured home, as defined in Section 18007 of the Health and Safety Code.' Section 18007 is the federal HUD-code manufactured home definition, so a HUD-certified manufactured home is an ADU by statute and a city cannot rule out the whole category. Second, there is building code preemption for a modular (factory-built) home. Under the Factory-Built Housing Law, Health and Safety Code 19960 and following, HCD-certified third-party agencies review the plans and the plant, and every unit sold to a first user in California must carry an HCD insignia of approval (H&SC 19980). A local enforcement agency enforces and inspects only the installation of the unit (H&SC 19992), and where the ordinary State Housing Law in Part 1.5 conflicts with the Factory-Built Housing Law on factory-built housing, the Factory-Built Housing Law controls (H&SC 19990(c)). Third, there is HUD-code zoning parity outside the ADU context: Government Code 65852.3 makes a city allow a HUD-certified manufactured home on a foundation system on any lot zoned for a conventional single-family home, apply only the same development standards it applies to a site-built home, restrict only roof overhang, roofing material and siding material, and it bars any standard that has the effect of precluding manufactured homes as permanent residences.

How big can an ADU be in California?

A city cannot set a maximum ADU size below 850 square feet of interior livable space, or below 1,000 square feet for an ADU with more than one bedroom (Gov. Code 66321(a)(2)). A city also cannot use any standard, including lot coverage, floor area ratio, open space or front setback, that stops an ADU of at least 800 square feet of interior livable space with four foot side and rear setbacks (66321(a)(3)). A city cannot set a minimum size that would rule out an efficiency unit (66321(a)(1)). Going the other way, 66314(d) lets a local ordinance cap an attached ADU at 50 percent of the existing main house and a detached ADU at 1,200 square feet, so 1,200 square feet is the usual ceiling a city may impose on a detached unit. A junior ADU is capped by definition at 500 square feet of interior livable space inside a single-family house (66313).

Do I have to live on the property to have an ADU in California?

State law bans the requirement for an ADU. Gov. Code 66315 says no standard beyond those in Section 66314 may be used or imposed, 'including an owner-occupant requirement,' except that a city may require the property be used for rentals of 30 days or longer. A junior ADU is different: under 66333(b), owner occupancy of the single-family house can still be required when the junior ADU shares sanitation facilities with the house, and it is waived when the junior ADU has its own facilities or the property is owned by a government or housing organization.

Can I rent out an ADU in California?

Long-term rental is protected and short-term rental is not. A city may require that an ADU be rented for terms of 30 days or longer (Gov. Code 66315), and 66323(e) requires rental terms longer than 30 days for the units it covers. In plain terms a city can stop you using an ADU as a nightly vacation rental, and many do. An ADU generally cannot be sold separately from the main house (66314(d)). Article 4 carves out two narrow exceptions: a separate sale to a low or moderate income qualified buyer where a qualified nonprofit built one of the units, with a recorded tenancy in common agreement and 45 years of affordability (66341), and a local ordinance that lets the house and the ADU be converted into condominiums under the Davis-Stirling Act and the Subdivision Map Act, with lienholder consent (66342).

How long does an ADU permit take in California?

The permitting agency has 15 business days after it receives your application to tell you in writing whether it is complete, and to give you a list of what is missing. Once the application is complete, and there is already a dwelling on the lot, the agency must approve or deny within 60 days. If it has not approved or denied within 60 days, Gov. Code 66317 says the application 'shall be deemed approved.' An appeal must get a final written determination no later than 60 business days after the written appeal. The same 60 day clock applies to a junior ADU under 66335(a)(3). The 15 business day completeness notice is new as of January 1, 2026 under SB 543.

Does PERCH do the site work?

No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.

Is this page legal advice?

No. It summarizes California state law as checked on September 23, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.