ADU laws · Arkansas

Arkansas ADU Laws (2026): Can You Add a Modular ADU?

Arkansas cities must allow one ADU by right, no extra parking. The state rule is real and it is already in force, but it is a floor, not a full rulebook. Your lot can change the answer, so check your exact address and call your local planning office before you plan.

Source: A.C.A. 14-56-205(b)(1), (c)(1) (Act 313 of 2025)

Updated Research checked

Strength

Strong

State law makes covered cities allow at least one ADU under rules the state sets.

Research checked

September 23, 2026

Date our team last checked the sources.

What Arkansas law says about ADUs

The state rule

Arkansas cities must allow one ADU by right, no extra parking.

Source: A.C.A. 14-56-205(b)(1), (c)(1) (Act 313 of 2025)

Arkansas has a statewide ADU law and it is already in force. Act 313 of 2025 added a new section, A.C.A. 14-56-205, which says a city cannot restrict, prohibit or otherwise regulate the use of at least one accessory dwelling unit by right on any lot that has a single-family house on it. By right means no public hearing, no variance, no conditional use permit, no special permit, no special exception and no other discretionary zoning action. The city also cannot require extra parking, cannot require the ADU to match the look of the main house, cannot require anyone to live on site, and cannot charge more than $250 in development impact fees or more than a $250 application fee.

Who the law covers

All municipalities in Arkansas. The section sits in Title 14, Chapter 56, Subchapter 2, and every prohibition in it is written against a municipality. There is no population floor and no geographic carve-out. Counties are not addressed, so unincorporated land outside city limits is not covered by this section.

Statutes and documents behind this section
  • Act 313 of 2025 (HB 1503), adding A.C.A. 14-56-205
  • HB 1503 bill information page, 95th General Assembly, Regular Session 2025

Can a modular ADU go on an Arkansas lot?

Factory-built hook Zoning parity · Manufactured-home rule, not ADU-specific; ADU law bars design matching

Act 313 does not mention manufactured, modular or factory-built homes at all, so there is no statute that says in plain words that a factory-built home may be an ADU. What the law does give you is three things that help. First, an ADU must meet the regulatory requirements, and those are defined to include the Arkansas Fire Prevention Code, local ordinances, zoning and design standards. A modular home in Arkansas is built to those same state and local codes, not to a separate federal standard, so a modular unit is judged by the same code as a site-built house. Second, A.C.A. 14-56-205(c)(2) says a city cannot require an ADU to match the exterior design, roof pitch or finishing materials of the main house, which removes the appearance rules cities most often use to turn factory-built units away. Third, A.C.A. 14-56-205(c)(8) says a city cannot impose more onerous development standards on an ADU beyond those in the section. Separately, A.C.A. 14-54-1604 says a city with zoning must allow manufactured homes on individually owned lots in at least one residential district and cannot impose conditions on them that are inconsistent with the conditions on other single-family dwellings in the same district, but that section is about manufactured homes generally and does not by its own words reach ADUs. Bottom line: a code-compliant modular home should qualify, but no Arkansas statute or state agency guidance was found that forces a city to treat a factory-built ADU the same as a site-built one, so confirm with the city.

Source: A.C.A. 14-56-205(a)(4), (c)(2), (c)(8) (Act 313 of 2025); Arkansas Manufactured Home Commission Rules for Modular Homes, Ch. 2 and Sec. 301(C)

Three different legal hooks can help a factory-built ADU: an ADU law that names factory-built homes, building-code preemption, and zoning parity. They are easy to confuse. How the three hooks differ.

Arkansas ADU rules, point by point

What state law says on each point, with its source. Where the state is silent, your city or county decides.

How many ADUs

At least one ADU by right on any lot or parcel that contains a single-family dwelling. The ADU may be attached, detached or internal to the house. The house must have more square footage than the ADU, because the statute defines an ADU as a unit on the same parcel as a single-family dwelling of greater square footage. A city may allow more than one ADU, since the section does not stop a city from being more permissive.

Source: A.C.A. 14-56-205(a)(1), (b)(1), (b)(2), (h)(2) (Act 313 of 2025)

Approval path

By right. The statute defines by right as approval without a public hearing, without a variance, conditional use permit, special permit or special exception, and without any other discretionary zoning action other than a check that the site plan meets the applicable regulatory requirements. A city may still require a will-serve letter from a municipal water system and a municipal sewer system, or Department of Health approval where city water or sewer is not available.

Source: A.C.A. 14-56-205(a)(2), (b)(1), (g) (Act 313 of 2025)

Size

An attached or detached ADU cannot be more than 75 percent of the gross floor area of the single-family house or 1,000 square feet, whichever is less. Gross floor area means the interior habitable area. So the real cap is 1,000 square feet only once the main house reaches about 1,334 square feet. Below that, 75 percent of the house is the binding number. The statute does not set this size limit for an internal ADU, which subsection (b)(3) leaves out, but a city may still apply its own rules there. A city may allow larger ADUs than the section requires.

Source: A.C.A. 14-56-205(a)(3), (b)(3), (h)(2) (Act 313 of 2025)

Owner living on site

The state bans the requirement. A city shall not require that the single-family dwelling or the accessory dwelling unit be occupied by the owner. A city also cannot require a family, marriage or employment relationship between the people in the house and the people in the ADU.

Source: A.C.A. 14-56-205(c)(3), (c)(4) (Act 313 of 2025)

Lot size

A city cannot set a minimum lot size for an ADU that is more restrictive than the minimum lot size it applies to the single-family house on that lot. The same rule covers maximum lot coverage and minimum building frontage.

Source: A.C.A. 14-56-205(c)(7) (Act 313 of 2025)

Setbacks

A city cannot set minimum setbacks for an ADU that are more restrictive than the setbacks for the single-family house on the same lot. The state does not set a setback number of its own, so the house's own district setbacks are the ceiling.

Source: A.C.A. 14-56-205(c)(7) (Act 313 of 2025)

Height

A city cannot set a maximum building height for an ADU that is more restrictive than the maximum height for the single-family house on the lot. The state sets no height number of its own.

Source: A.C.A. 14-56-205(c)(7) (Act 313 of 2025)

Parking

No extra parking. A city cannot require a lot to have additional parking to accommodate an ADU, and cannot charge a fee in lieu of additional parking.

Source: A.C.A. 14-56-205(c)(1) (Act 313 of 2025)

Permit timeline

State law sets no permit deadline and no automatic approval. What it does set is a compliance date for cities: any city policy, regulation or ordinance in effect on or after January 1, 2026 that applies to an ADU and conflicts with A.C.A. 14-56-205 is invalid to the extent of the conflict.

Source: A.C.A. 14-56-205(f) (Act 313 of 2025)

Impact fees

A city cannot assess development impact fees on building an ADU above $250. A city may charge an application review fee, but that fee cannot be more than $250 per ADU. Usual building permit fees can still be charged on top of the application fee. A city also cannot make you improve public streets or sidewalks as a condition of the permit, except to rebuild or repair a street or sidewalk that your construction damaged.

Source: A.C.A. 14-56-205(c)(5), (c)(6), (e)(1), (e)(2) (Act 313 of 2025)

Renting it out

Long-term rental is protected in practice, because a city cannot require owner occupancy and cannot require a family, marriage or employment tie between the two households. Short-term rental is a different story: the section expressly says it does not stop a city from regulating short-term rentals, and it defines a short-term rental as a home offered for a fee for thirty days or less.

Source: A.C.A. 14-56-205(a)(5), (c)(3), (c)(4), (d) (Act 313 of 2025)

What changed recently

  1. The compliance line in the statute. Any city policy, regulation or ordinance in effect on or after this date that applies to an ADU and does not comply with A.C.A. 14-56-205 is invalid to the extent of the conflict.

    Source: A.C.A. 14-56-205(f) (Act 313 of 2025)

  2. Little Rock's Board of Directors passed Ordinance 22,647, rewriting Revised Code Sections 36-2, 36-204 and 36-502 to allow one ADU by right in all zoning districts. It carries an emergency clause, so it took effect the day it passed.

    Source: City of Little Rock Ordinance No. 22,647

  3. Act 313 took effect. Every Arkansas city has had to allow at least one ADU by right on a single-family lot since this date.

    Source: City of Little Rock Ordinance 22,647, Section 8 emergency clause, which recites that the new legislation takes effect on August 5, 2025

  4. Fayetteville City Council amended Unified Development Code Section 164.19 on accessory dwelling units. Reported changes include allowing up to two ADUs on a single-family lot with a combined cap of 1,200 square feet, removing ADU parking standards and exempting ADUs from sidewalk construction requirements. Not verified on a City of Fayetteville domain, see notes.

    Source: Fayetteville Unified Development Code 164.19, Accessory Dwelling Units (Municode listing)

  5. The Governor approved HB 1503 as Act 313 of 2025, creating Arkansas's first statewide ADU requirement at A.C.A. 14-56-205.

    Source: Act 313 of 2025 (HB 1503), approval line

Arkansas city records

Your city or county runs the permit counter. Here is what we verified for 7 places in Arkansas, and who to call.

Little Rock

One ADU is a permitted use by right in every Little Rock zoning district when it is accessory to a single-family house with more square footage on the same lot. It cannot be more than 75 percent of the house's gross floor area or 1,000 square feet, whichever is less, and it needs no off-street parking space of its own.

Planning and Development
(501) 371-4790 · Planning office website
Checked September 23, 2026

Fayetteville

Fayetteville's ADU rules live in Unified Development Code Section 164.19, and the Planning Division at 125 West Mountain Street is the office that answers ADU questions.

Planning Division, Development Services
479-575-8267 · Planning office website
Checked September 23, 2026

Fort Smith

We have not verified a local ADU rule here yet. Call the planning office below.

City Planning (Planning and Zoning)
Planning office website
Checked September 23, 2026

Springdale

Development applications go to the Springdale Planning and Community Development Division at 201 Spring Street, or by email to planningapplications@springdalear.gov, or through the city's iWorQ portal.

Planning and Community Development Division
Planning office website
Checked September 23, 2026

Jonesboro

Jonesboro's Planning and Zoning office at 300 South Church Street answers second-dwelling questions directly; its own page carries a frequently asked question on building a guesthouse or second dwelling on a lot.

Planning and Zoning
(870) 932-0406 · Planning office website
Checked September 23, 2026

Rogers

Rogers Community Development at 301 West Chestnut Street reviews zoning and building permits. A portable shed of 200 square feet or less, under 10 feet tall and not fixed to the ground needs no permit, but anything larger does, and an ADU always does.

Community Development (Planning Division)
479-621-1186 · Planning office website
Checked September 23, 2026

Bentonville

Bentonville has published a draft ordinance that would rewrite Zoning Code Section 601.02 on accessory dwelling units to line up with Act 313. Under that draft an ADU could be up to 70 percent of the primary structure's gross floor area or 1,000 square feet, whichever is less, with 7 foot side and rear setbacks and no additional parking required.

Development Services, Planning and Community Development
479-271-3122 · Planning office website
Checked September 23, 2026

How PERCH fits

PERCH delivers modular homes that can work as an ADU where your local rules allow one. We are not your general contractor, and we never do site work.

PERCH

  • Your modular home, built to order in the factory nearest you
  • Delivery to your land
  • The crew that sets the home on your foundation
  • Plan documents for your permit application

You

  • Your land
  • A licensed local contractor you hire for the site work
  • The foundation, water, sewer or septic, and power hookups
  • Your permits, using the documents we give you

Your site contractor's bid is the price for that work. PERCH does not perform site work.

Modular ADUs for Arkansas

Check your exact lot

Type an address. Land Check reads the state rule above, the parcel and the local zoning, then shows what fits on the lot.

Free. No obligation.

Questions, answered

Is there a statewide ADU law in Arkansas?

Arkansas cities must allow one ADU by right, no extra parking. Arkansas has a statewide ADU law and it is already in force. Act 313 of 2025 added a new section, A.C.A. 14-56-205, which says a city cannot restrict, prohibit or otherwise regulate the use of at least one accessory dwelling unit by right on any lot that has a single-family house on it. By right means no public hearing, no variance, no conditional use permit, no special permit, no special exception and no other discretionary zoning action. The city also cannot require extra parking, cannot require the ADU to match the look of the main house, cannot require anyone to live on site, and cannot charge more than $250 in development impact fees or more than a $250 application fee.

Can a modular home be an ADU in Arkansas?

Act 313 does not mention manufactured, modular or factory-built homes at all, so there is no statute that says in plain words that a factory-built home may be an ADU. What the law does give you is three things that help. First, an ADU must meet the regulatory requirements, and those are defined to include the Arkansas Fire Prevention Code, local ordinances, zoning and design standards. A modular home in Arkansas is built to those same state and local codes, not to a separate federal standard, so a modular unit is judged by the same code as a site-built house. Second, A.C.A. 14-56-205(c)(2) says a city cannot require an ADU to match the exterior design, roof pitch or finishing materials of the main house, which removes the appearance rules cities most often use to turn factory-built units away. Third, A.C.A. 14-56-205(c)(8) says a city cannot impose more onerous development standards on an ADU beyond those in the section. Separately, A.C.A. 14-54-1604 says a city with zoning must allow manufactured homes on individually owned lots in at least one residential district and cannot impose conditions on them that are inconsistent with the conditions on other single-family dwellings in the same district, but that section is about manufactured homes generally and does not by its own words reach ADUs. Bottom line: a code-compliant modular home should qualify, but no Arkansas statute or state agency guidance was found that forces a city to treat a factory-built ADU the same as a site-built one, so confirm with the city.

How big can an ADU be in Arkansas?

An attached or detached ADU cannot be more than 75 percent of the gross floor area of the single-family house or 1,000 square feet, whichever is less. Gross floor area means the interior habitable area. So the real cap is 1,000 square feet only once the main house reaches about 1,334 square feet. Below that, 75 percent of the house is the binding number. The statute does not set this size limit for an internal ADU, which subsection (b)(3) leaves out, but a city may still apply its own rules there. A city may allow larger ADUs than the section requires.

Do I have to live on the property to have an ADU in Arkansas?

The state bans the requirement. A city shall not require that the single-family dwelling or the accessory dwelling unit be occupied by the owner. A city also cannot require a family, marriage or employment relationship between the people in the house and the people in the ADU.

Can I rent out an ADU in Arkansas?

Long-term rental is protected in practice, because a city cannot require owner occupancy and cannot require a family, marriage or employment tie between the two households. Short-term rental is a different story: the section expressly says it does not stop a city from regulating short-term rentals, and it defines a short-term rental as a home offered for a fee for thirty days or less.

How long does an ADU permit take in Arkansas?

State law sets no permit deadline and no automatic approval. What it does set is a compliance date for cities: any city policy, regulation or ordinance in effect on or after January 1, 2026 that applies to an ADU and conflicts with A.C.A. 14-56-205 is invalid to the extent of the conflict.

Does PERCH do the site work?

No. PERCH builds your modular home in the factory nearest you, delivers it and sets it on your foundation. You hire your own licensed local contractor for the foundation, utilities and other site work, and you file the permits using the plan documents we give you. PERCH does not perform site work and is not your general contractor.

Is this page legal advice?

No. It summarizes Arkansas state law as checked on September 23, 2026, with a source for every rule. Confirm with your local planning office, and with an attorney for anything binding.